Air Force Civil Engineer Support Agency<br />

Engineering Agile Combat Support Worldwide<br />

Air Force Civil Engineer<br />

Support Agency<br />

<strong>Mr</strong> <strong>Bryon</strong> <strong>Bednar</strong>, PE<br />

Executive Director<br />

1


• AFCESA – Who we are<br />

AFCESA Overview<br />

• Sustainment, Restoration and Modernization (S/R&M)<br />

Program<br />

• Air Force Contract Augmentation Program (AFCAP)<br />

• Labor Support Contracts<br />

• Bottom Line<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e<br />

2


AFCESA MISSION<br />

Provide the best tools, practices, and<br />

professional support to maximize Air Force<br />

Civil Engineer capabilities in base and<br />

contingency operations<br />

3<br />

AFCESA VISION<br />

To be the Air Force leader that enhances<br />

agile combat support by integrating asset<br />

management principles throughout Civil<br />

Engineer operations, advancing readiness<br />

and improving energy management<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e


AFCESA Organizational Fit<br />

Chief of Staff<br />

Air Force<br />

Deputy Chief of Staff<br />

Installations & Logistics (A4/7)<br />

The Civil Engineer<br />

(A7C)<br />

MAJCOM CEs<br />

BCEs<br />

Warfighters<br />

Resources<br />

(A7CR)<br />

Asset Mgmt &<br />

Operations (A7CA)<br />

Programs<br />

(A7CP)<br />

Readiness & Emergency<br />

Management (A7CX)<br />

Planning<br />

(A7CI)<br />

Air Force Center for<br />

Engineering and the<br />

Environment<br />

Brooks City-Base TX<br />

Air Force Civil Engineer<br />

Support Agency<br />

Tyndall AFB FL<br />

4<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e


What is AFCESA’s Role<br />

• AFCESA SERVICES PROVIDE THREE FUNDAMENTAL<br />

ROLES FOR THE CE COMMUNITY:<br />

1. TECHNICAL EXPERTS<br />

• Provide direct support with a wide range of world- class,<br />

professional engineering expertise and training resources<br />

…Readiness to Energy to Pavements, etc…<br />

2. EXECUTION SUPPORT<br />

• Provide easy-to-use project contracting, emergency<br />

response services, and depot-like support<br />

3. FIELD SUPPORT<br />

• CEMIRT & Airfield Pavements Team<br />

5<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e


Air Force Civil Engineer Support Agency<br />

Engineering Agile Combat Support Worldwide<br />

Sustainment, Restoration and<br />

Modernization (S/R&M)<br />

Program<br />

6


AFCESA S/R&M Support<br />

• A/E Services - Planning,<br />

Design, Const Management<br />

• Construction Services<br />

• Infrastructure O&M<br />

• Task Order Development,<br />

Negotiation, Award<br />

• Task Order Management<br />

• PM oversight/Title II<br />

• Funds Management<br />

• Contract Administration<br />

• Financial/physical<br />

closeout<br />

• Technical Reach Back<br />

Repair Rwy 03/21<br />

Charleston AFB<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e<br />

7


S/R&M Support Business<br />

Model<br />

• Enable successful execution of<br />

complex Air Force S/R&M<br />

• Synergy of top Air Force<br />

contract management and<br />

technical subject matter<br />

expertise<br />

• Host of proven contractors,<br />

readily available worldwide<br />

• Integrated contracting<br />

capability – accelerated<br />

acquisition<br />

Repair South Rwy<br />

Andersen AB<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e<br />

8


AFCESA S/R&M<br />

Core Competencies<br />

Facilities Civil Mechanical Electrical<br />

Anti-Terrorism/<br />

Force Protection<br />

Airfield<br />

Lighting/Marking<br />

HVAC Systems Elec Distribution<br />

Pavements<br />

Fire Suppression Power Plants<br />

Life Safety<br />

Energy<br />

Roof Systems<br />

Structural Systems<br />

Structural/Friction<br />

Evaluations<br />

Water/Wastewater/<br />

Solid Waste<br />

Aircraft Arresting<br />

Systems<br />

Natural Gas Systems<br />

Boiler Systems<br />

Plumbing Systems<br />

POL Systems<br />

Industrial Waste<br />

Systems<br />

Ext/Int Elec<br />

Generators<br />

Lightning Protection<br />

SCADA<br />

Cathodic Protection<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e<br />

9


S/R&M Contract Toolbox<br />

• AE Services<br />

• 4PAE/08<br />

• 29 contractors<br />

• $3B w/ ordering period<br />

through Aug 2013<br />

• Decentralized Ordering<br />

Authority from AFCEE<br />

Buckley PV<br />

• Construction Services<br />

• S/R&M Acquisition Task Order<br />

Contract (SATOC)<br />

Altus AFB<br />

ECP Upgrade<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e<br />

10


S/R&M Acquisition & Task<br />

Order Contract (SATOC)<br />

• Multiple Construction Delivery Methods<br />

• Turnkey, Design-Build, Traditional Construction<br />

• 20 contractors including small business<br />

• 8(a), Hubzone, and Service<br />

Disabled Veteran Owned<br />

Small Business<br />

• Program Ceiling - $4B<br />

• 5-year basic, 5 one-year<br />

options (total 10 yrs)<br />

• Awarded May 2008<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e<br />

11


SATOC Contractors<br />

AMEC<br />

CDM/CAPE JV<br />

CH2M Hill<br />

AECOM<br />

ECC<br />

Innovative Technical Solutions<br />

Jacobs Government Services<br />

Parsons<br />

Tutor Perini Corp<br />

MACTEC<br />

* Small Business<br />

Toltest<br />

*NorthWind<br />

*SEI Group, Inc.<br />

Weston Solutions<br />

Johnson Controls/Versar JV<br />

*Barlovento, LLC<br />

*J2 Engineering<br />

*Charter Environmental<br />

*DWG & Associates<br />

EQM<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e<br />

12


FOA’s SRM Execution<br />

Responsibilities<br />

SRM Execution Aligned with each FOA’s Core Competencies<br />

AFCESA<br />

AFCEE<br />

• Horizontal SRM<br />

• Pavements<br />

• Utilities/Power Pro<br />

• Water/Wastewater<br />

• Elect Distribution<br />

• HVAC<br />

• POL<br />

• Fire Suppression<br />

• Roofs<br />

• Vertical SRM<br />

• Facility Renovation<br />

• Building Additions<br />

• Military Construction (MILCON)<br />

• Military Family Housing<br />

• Environmental<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e<br />

13


AFCESA’s SRM History<br />

Dollars By FY<br />

• FY05 - $129.3M<br />

• FY06 - $348.2M<br />

• FY07– $329.6M<br />

• FY08 –$458.5M<br />

• FY09 – $443M<br />

• FY10 – $427M (Projected)<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e 14


Active AFCESA SRM<br />

Projects –Western US<br />

Number Title Total Award Amt Base/Location<br />

ANDE-08-S-2361 FY08 BASE GENERAL PLAN (BGP) UPDATE $158,496.10 ANDERSEN<br />

ANDE-09-S-2778 Title II for Repair South Runway and Taxiway C $1,989,199.00 ANDERSEN<br />

ANDE-09-S-2824 Replace HVAC, Rails & Lights for Saipan Dorms& Upgrade Transformers $5,670,203.32 ANDERSEN<br />

ANDE-09-S-2899 Upgrade Mechanical System at Bldg 25009 $6,179,718.67 ANDERSEN<br />

ANDE-08-S-2584 Repair A/C, Rails & Lights, Tinian Dorm, B25011 & Rota Hall Dorm, B25017 $8,311,026.30 ANDERSEN<br />

BEAL-09-S-2995 REPAIR AIRFIELD LIGHTING AND LIGHTING VAULTS $252,616.18 BEALE AFB<br />

BEAL-10-K-3127 ECIP: Install Daylighting Controls $933,845.00 BEALE AFB<br />

BUCK-10-K-3151 ENERGY AUDIT FY10 BUCKLEY AFB $275,510.40 BUCKLEY AFB<br />

BUCK-10-K-3060 ECIP: Water Well for Irrigation $2,388,786.00 BUCKLEY AFB<br />

BUCK-09-K-2815 Installation of 1MW Solar Photovoltaic (PV) system. $7,348,231.00 BUCKLEY AFB<br />

BUCK-10-S-3283 A-E Design to Construct & Install New Switching Station Award Pending BUCKLEY AFB<br />

CANN-10-K-3238 Energy Audit $175,839.05 CANNON AFB<br />

CLEA-10-S-3089 Replace Soot Blowers and ID Fans $2,388,116.00 CLEAR<br />

CREE-09-S-2984 Repair Fire Alarm and Install High Ex Foam System, Hangar 791, 792 $1,499,683.00 CREECH AFB<br />

CREE-09-S-2983 Repair Electrical Circuit $1,866,865.00 CREECH AFB<br />

CREE-10-K-3262 Inst HVAC GSHP, Rpr Daylighting Controls, & Rpr Heat Multi Facs Award Pending CREECH AFB<br />

EARE-08-S-2494 Title II for Repair Eareckson Airfield $1,902,831.87 EARECKSON AS<br />

EARE-09-S-2858 Repair Eareckson Airfield Taxiways and Aprons $16,887,692.00 EARECKSON AS<br />

EARE-08-S-2493 Repair Eareckson Airfield $34,997,873.00 EARECKSON AS<br />

EARE-10-S-3245 Repair Sewer Lines PH1 Award Pending EARECKSON AS<br />

EARE-10-S-3244 Rpr Runway Approach Lighting Award Pending EARECKSON AS<br />

EDWA-10-K-3150 ENERGY AUDIT FY10 EDWARDS AFB $695,062.62 EDWARDS AFB<br />

EIEL-10-S-3257 Repair Eielson Primary Lift Station, Bldg 2212 $1,175,312.61 EIELSON AFB<br />

EIEL-10-K-3087 HVAC Retro-Commissioning: 2 bases $1,524,673.16 EIELSON AFB<br />

EIEL-09-S-2873 Repair HVAC/Electrical Systems in Communications Building (B3110) $2,281,098.19 EIELSON AFB<br />

EIEL-09-S-2894 Repair Nosedock 2 Mechanical/Hangar Door Systems (B1121) $3,447,416.70 EIELSON AFB<br />

EIEL-09-S-2819 Repair Utilities in Permanent Party Dorm (Bldgs 2260, 2266) $7,101,586.00 EIELSON AFB<br />

EIEL-10-S-3062 Repair Utilities in Permanent Party Dorms (Bldgs 2202 and 2204) $11,393,954.00 EIELSON AFB<br />

EIEL-10-S-3220 Energy, Condition and Optimization Assessment Award Pending EIELSON AFB<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e<br />

15


Active AFCESA SRM<br />

Projects –Western US<br />

Number Title Total Award Amt Base/Location<br />

ELME-10-S-3200 Cape Romanzof Dome Roof Repair $148,576.00 ELMENDORF AFB<br />

ELME-09-K-2859 611 CES ECIP - Wind Generators $14,087,078.00 ELMENDORF AFB<br />

FAIR-08-S-2714 DESIGN REPAIR OF RUNWAY 05/23 $1,874,298.00 FAIRCHILD AFB<br />

FAIR-10-S-2959 Repair/Replacement of Runway 05/23 $42,819,108.00 FAIRCHILD AFB<br />

FAIR-10-S-3295 Title II Construction Services for Repair/Replacement of Runway 05/23 Award Pending FAIRCHILD AFB<br />

FEWA-10-K-3155 ENERGY AUDIT FY10 FE WARREN AFB $219,258.00 FE WARREN AFB<br />

FEWA-09-S-2908 FE Warren AFB (4) Design/Repair Projects $237,157.00 FE WARREN AFB<br />

FEWA-09-S-2957 GHLN081035 Repair Roofs, Bldgs. 316, 322, 356, 348 $1,029,496.52 FE WARREN AFB<br />

FEWA-09-S-2958 Repair Roofs Base Wide on Buildings 34, 328, 290, 266, 292. $1,399,822.00 FE WARREN AFB<br />

HICK-10-Q-3171 PACAF PCI Surveys FY10 $247,768.48 HICKAM AFB<br />

HICK-09-S-2892 PV System Installation $1,176,692.00 HICKAM AFB<br />

HICK-08-S-2459 Install Remote Metering (AMR) $1,176,990.05 HICKAM AFB<br />

HICK-07-S-2060 M R Waterline, Hangar Ave $1,363,982.00 HICKAM AFB<br />

HICK-09-S-2986 Title II, Renovate Bldg 1102 $1,523,130.79 HICKAM AFB<br />

HICK-09-S-2987 Renovate Building for AFWA, Bldg. 41 $2,091,910.17 HICKAM AFB<br />

HICK-09-K-2835 FY09 PACAF ECIP projects $2,665,000.00 HICKAM AFB<br />

HICK-10-S-3084 Chiller Plant for HQ PACAF, Bldg 1102 $6,696,436.00 HICKAM AFB<br />

HICK-09-S-2836 Repair Building 1102 (HQ PACAF) $26,805,771.03 HICKAM AFB<br />

HILL-10-K-3146 ENERGY AUDIT FY10 HILL AFB $1,205,073.64 HILL AFB<br />

HOLL-09-S-2841 Repair Cast Iron Water Lines Base Ph 1 $789,093.00 HOLLOMAN AFB<br />

HOLL-10-K-3187 ECIP: Install Occupancy Sensors $1,242,399.00 HOLLOMAN AFB<br />

HOLL-10-K-3126 ECIP: Install Daylighting Control System $1,958,135.00 HOLLOMAN AFB<br />

HOLL-10-S-3055 Repair Taxiway Delta $2,920,145.00 HOLLOMAN AFB<br />

KIRT-10-K-3149 ENERGY AUDIT FY10 KIRTLAND AFB $660,676.76 KIRTLAND AFB<br />

LOSA-10-S-3100 Fort Mac Arthur Utilities Design $596,726.00 LOS ANGELES AFS<br />

LOSA-08-K-2290 ECIP - Install Solar Powered Security Lighting Systems $1,741,225.14 LOS ANGELES AFS<br />

LOSA-10-S-3236 PV Roof Systems B270, B271, B272 & Solar Hot Water System Award Pending LOS ANGELES AFS<br />

LOSA-10-S-3279<br />

Repair Pool & Surrounding Area B/400, Construct Spray Park, and Repair Bath House<br />

B/401, Ft. MacArthur<br />

Award Pending LOS ANGELES AFS<br />

LUKE-10-K-3133 ENERGY AUDIT FY10 LUKE AFB $241,652.52 LUKE AFB<br />

MALM-10-K-3154 ENERGY AUDIT FY10 MALMSTROM AFB $269,234.00 MALMSTROM AFB<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e<br />

16


Active AFCESA SRM<br />

Projects –Western US<br />

MALM-09-K-2874 Construct Ground Source Heat Pump for Dorm 740 - Energy Initiative $459,927.00 MALMSTROM AFB<br />

MARC-10-K-3066 ECIP - Various EMCS $814,330.00 MARCH ARB<br />

MARC-08-S-2048 Repair-Upgrade Fire Protection Multiple Facilities $8,854,081.55 MARCH ARB<br />

MOUN-10-K-3142 ENERGY AUDIT FY10 MT. HOME AFB $254,881.00 MOUNTAIN HOME AFB<br />

NELL-10-K-3143 ENERGY AUDIT FY10 NELLIS AFB $467,723.00 NELLIS AFB<br />

NELL-09-S-2985 Repair Fire Alarm & Install High Expansion Foam System, Hangar 283 $796,156.00 NELLIS AFB<br />

NELL-10-K-3249 Rpr Daylighting Controls & Rpr Demand Vent Controls Multi Facs Award Pending NELLIS AFB<br />

PETE-09-S-3008 Study for Replacement of MPP, ASU and RSU $200,303.87 PETERSON AFB<br />

PETE-10-K-3030 Energy Audits FY10 PETERSON AFB & CHEYENNE MT $369,766.58 PETERSON AFB<br />

PETE-10-S-3065 AFSPC Concrete Study $408,093.00 PETERSON AFB<br />

PETE-08-S-2634 Replace Power Dist Panels & SREMP ESA for Minuteman & Launch Fac $5,461,669.13 PETERSON AFB<br />

PALM-10-S-3228 Taxiway Alpha Shoulder Repairs and Repairs to Taxiways H, J, L, and N $981,068.00 PLANT 42 - PALMDALE<br />

PALM-09-S-2773 ECP-5 AT/FP Security Upgrade and Ditches $2,485,653.00 PLANT 42 - PALMDALE<br />

PALM-10-S-3122 Repair/Rebuild Four Drainage Ditches Award Pending PLANT 42 - PALMDALE<br />

PALM-10-S-3229 Construction of Fuel Dock Office w/Lab & Egress at Fuel Dock Award Pending PLANT 42 - PALMDALE<br />

SCHR-10-K-3152 ENERGY AUDIT FY10 SCHRIEVER AFB $171,587.72 SCHRIEVER AFB<br />

TONO-09-S-2907 Repair Switches, Electrical Substation $2,504,289.22 TONOPAH<br />

TRAV-09-S-2922 Design Taxiway/Ramp Repairs $663,568.56 TRAVIS AFB<br />

TRAV-10-S-3248 Travis AFB Water Study Award Pending TRAVIS AFB<br />

ACAD-09-S-2933 WWTP Improvements/Repairs $703,559.00 US AIR FORCE ACADEMY<br />

ACAD-09-S-2941 Repair Potable Water Line from Reservoir #2 to Reservoir #3 $723,172.00 US AIR FORCE ACADEMY<br />

ACAD-09-S-2937 Repair Potable Water Line to Flight Line & Remove Dead End $927,578.00 US AIR FORCE ACADEMY<br />

ACAD-09-S-2936 Replace Water Mains, Jacks Valley & Lehman Run $1,025,138.00 US AIR FORCE ACADEMY<br />

ACAD-09-S-2939 Replace Potable Water Lines, Service/Supply Area $1,081,583.00 US AIR FORCE ACADEMY<br />

ACAD-09-S-2942 Replace Non-Potable Mains North Stadium Blvd. $1,352,882.58 US AIR FORCE ACADEMY<br />

ACAD-08-S-2655 Test Concrete Plaza Mock-Up $1,411,108.30 US AIR FORCE ACADEMY<br />

ACAD-09-S-2935 Repair Mitchell Hall Ph4/6 $2,323,394.42 US AIR FORCE ACADEMY<br />

ACAD-09-S-2934 Repair Vandenberg Hall Ph3&4/8 $36,244,032.92 US AIR FORCE ACADEMY<br />

ACAD-10-S-3222 Repair Mitchell Hall Phase 5/6 Award Pending US AIR FORCE ACADEMY<br />

VAND-09-S-2832 Building 8510 - (2 Projects) - Fire Suppression System & Drop Ceiling $1,607,854.00 VANDENBERG AFB<br />

VAND-09-S-2818 HVAC Repair- Buildings 7015, 8510 & 10577 $6,450,174.69 VANDENBERG AFB<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e<br />

17


Energy Projects FY10<br />

• Energy projects 49% of total FY10 SRM<br />

Projects and 17% of SRM dollars awarded<br />

•FY10 Capacity 150 Task Orders<br />

•FY11 Capacity 125 Task Orders<br />

Value $M<br />

Number of Projects<br />

325<br />

68<br />

Energy<br />

Others<br />

75<br />

73<br />

Energy<br />

Others<br />

* Modifications not included<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e<br />

18


Facility Energy Budgeted<br />

Funding Stream<br />

TOTAL AVAILABLE FUNDING ($M)<br />

PROGRAM FY10 FY11 FY12 FY13 FY14 FY15 TOTALS<br />

ECIP Projects 37.5 35.0 35.0 35.0 35.0 35.0 212.5<br />

ECIP Design 3.5 3.5 3.5 3.5 3.5 3.5 21.0<br />

Energy Initiative 28.2 40.9 44.2 35.3 36.6 37.2 222.4<br />

SRM Energy Cons 250.0 250.0 225.0 225.0 225.0 225.0 1400.0<br />

TOTALS 319.2 329.4 307.7 298.8 300.1 300.7 1855.9<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e<br />

5


FY11 - Proposed Projects<br />

• ECIP (FY11 Projects Total Approx $35M)<br />

BASE<br />

TITLE<br />

Atlantic City Photovoltaic Generation System<br />

Hurlburt Graywater Re-Use Tank and Distro System<br />

Moron<br />

Install Non Potable Water System<br />

Eglin<br />

Leak Detection & Repair<br />

Tyndall<br />

Reclaimed Water Irrigation<br />

Hanscom Replace Gas Lines<br />

Thule<br />

EMCS<br />

Elmendorf HVAC Retro commisioning-Ph 1<br />

Hanscom Repair Chiller Controls B1201<br />

Hill<br />

Energy Conversions and Repair, 1700 Area Bldgs<br />

Eglin<br />

DDC Energy Mgmt System Upgrade<br />

Randolph Construct Chiller/Thermal Energy Storage<br />

Arnold<br />

Test Area Energy Improvements<br />

* Project list pending approval<br />

• Base Energy Audits (FY11 Audits Total Approx $20M)<br />

• 40 Energy Audits are planned for 1 st Quarter FY11<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e<br />

19


SRM<br />

Where Can I Learn More<br />

AFCESA Program Manager<br />

Ken Gleason, P.E. YD-03<br />

Chief, S/R&M Branch<br />

(850) 283-6361 or DSN 523-6361<br />

Kenneth.Gleason@tyndall.af.mil<br />

AFCEE Program Manager<br />

Benjamin Kindt, P.E., YD-03<br />

Chief, Construction Branch<br />

(210) 395-8307 or DSN 969-8307<br />

benjamin.kindt.1@us.af.mil<br />

Andersen AFB Guam – Runway Replacement<br />

21<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e


Air Force Civil Engineer Support Agency<br />

Engineering Agile Combat Support Worldwide<br />

Air Force Contract<br />

Augmentation Program<br />

(AFCAP)<br />

22


AFCAP<br />

What is it<br />

Definition – a contingent contract<br />

tool, teaming Government &<br />

private industry, providing<br />

responsive solutions to National<br />

Command Authority challenges -<br />

- leveraging greater impact<br />

toward meeting urgent demands<br />

• Multi-year/vendor, ID/IQ-type<br />

contract, for contingencies<br />

• Capable of rapid response<br />

• Available to support National<br />

Command Authority<br />

23<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e


AFCAP Basic Premise<br />

Historical Customers<br />

• U.S. Air Force<br />

• U.S. Army<br />

• U.S. Navy<br />

• U.S. Marine Corps<br />

• DoD Combatant Commands<br />

• U.S. Coast Guard<br />

• U.S. State Department<br />

• U.S. Department of Justice<br />

• Department of Homeland<br />

Security<br />

• Federal Emergency Management<br />

Agency (FEMA)<br />

• National Aeronautical & Space<br />

Administration (NASA)<br />

• U.S. Agency for International<br />

Development & Office of Foreign<br />

Disaster Assistance<br />

• International Board of Broadcasters<br />

(Voice of America)<br />

24<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e


Response Spectrum<br />

Broad Range of Capabilities<br />

• Installation Support Services<br />

• Fill forward gaps<br />

• Sustainment<br />

• Reconstitution<br />

• Bridge home station shortfalls<br />

25<br />

• Contingent Logistics<br />

• War reserve materiel augmentation<br />

• Vehicles & heavy equipment / leases<br />

• Just-in-time supplies / materials<br />

• Humanitarian relief support<br />

• Expeditionary Construction<br />

• Planning, facility hardening<br />

• Emergency, disaster/base recovery<br />

• Site restoration<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e


AFCAP in SWA<br />

Current Locations<br />

KAZAKHSTAN<br />

Manas<br />

TURKEY<br />

Speicher<br />

GEORGIA<br />

Kirkuk<br />

AZERBAIJAN<br />

TURKMENISTAN<br />

UZBEKISTAN<br />

TAJIKISTAN<br />

KYRGYZSTAN<br />

CHINA<br />

JORDAN<br />

Balad<br />

Taji<br />

Al Asad<br />

Sather<br />

Ali<br />

IRAQ<br />

Victory Base Complex<br />

KUWAIT<br />

IRAN<br />

Ali Al Salem<br />

Al Jaber<br />

AFGHANISTAN<br />

Sharana<br />

Kandahar<br />

Dwyer<br />

PAKISTAN<br />

Bagram<br />

Jalalabad<br />

Salerno<br />

SAUDI<br />

ARABIA<br />

BAHRAIN<br />

QATAR<br />

Al Udeid<br />

INDIA<br />

Al Dhafra<br />

UAE<br />

OMAN<br />

26<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e


AFCAP<br />

The Future<br />

New Administration / Congress policy changes may<br />

necessitate procedural adjustments<br />

Surge in Afghanistan; increased demand for;<br />

• Infrastructure capacity<br />

• Demand for services, facility, utility & system operations<br />

• Equipment leases, logistical challenges<br />

Overlapping engineering demand in Iraq and Afghanistan<br />

given Afghanistan build-up will be before Iraq ebb<br />

27<br />

Continued Support for Emergent National Command<br />

Authority Responses<br />

• Just-in-time responses to natural disasters<br />

• Assist in mitigating death and human suffering due to<br />

manmade strife<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e


AFCAP Contractors<br />

Prime Contractors<br />

URS – URS Group, Inc & Louis Berger Group, Inc, JV<br />

<strong>Mr</strong>. Kurt Bergman; e-mail: URSAFCAPPMP@urscorp.com<br />

DYN – DynCorp International, LLC<br />

<strong>Mr</strong>. Eppie Walker; e-mail: eppie.walker@dyn-intl.com<br />

CH2 – CH2MHill & KBR Global Services, LLC<br />

<strong>Mr</strong>. Matt Tyler; e-mail: matt.tyler@ch2m.com<br />

RMS – Readiness Management Support, LC<br />

<strong>Mr</strong>. Dan Barker; e-mail: daniel.j.barker@iapws.com<br />

WGI – Washington Group International, Inc<br />

<strong>Mr</strong>. Neil Kanno; e-mail: neil.kanno@wgint.com<br />

28<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e


• Program Managers<br />

Wayland Patterson, Bill Valenti<br />

or Mark Young<br />

Phone: (850) 283-2275<br />

E-mail: wayland.patterson@ tyndall.af.mil,<br />

william.valenti@. tyndall.af.mil, or<br />

mark.young@tyndall.af.mil<br />

• Contracting Officers<br />

Carolyn Rossmann,<br />

or Steve Young<br />

Phone: (850) 283-6459; 4278, or 6283<br />

AFCAP<br />

Where Can I Learn More<br />

E-mail: carolyn.rossmann@ tyndall.af.mil, ,or steve.young@tyndall.af.mil<br />

• AFCAP Community of Practice (CoP):<br />

http://afkm.wpafb.af.mil/ASPs/CoP/ClosedCoP.aspFilter=OO-MS-CE-05<br />

29<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e


Air Force Civil Engineer Support Agency<br />

Engineering Agile Combat Support Worldwide<br />

AFCESA Labor Support<br />

Contract Opportunities<br />

30


Current Labor Support<br />

Vehicles<br />

■<br />

■<br />

Single Award BPA through GSA<br />

■ Incumbent Contractor : Northrop Grumman<br />

■ Five years: Base Year plus 4 Options<br />

■ Expires Jun 2011<br />

■ Ceiling Value: $300 Million<br />

■ Current Task Orders Awarded: 65<br />

■ Annual/Current Awarded Amount: $65 Million<br />

Non BPA Labor Support through GSA<br />

■ Incumbent Contractor : Various<br />

■ Task Orders Awarded: 9<br />

■ Annual/Current Awarded Amount: $14 Million<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e


Programs Supported<br />

■<br />

■<br />

■<br />

■<br />

■<br />

■<br />

■<br />

■<br />

■<br />

■<br />

■<br />

■<br />

SRM & AFCAP Project/Program Management<br />

Energy Program Management<br />

Resource Efficiency Manager (REM)<br />

CEMIRT Labor Support<br />

Automation & IT Support<br />

Readiness & Fire Program Management/Expertise<br />

Engineering Design & Program Management Expertise<br />

Airfield Pavements Team<br />

Utilities Privatization Program Management/Expertise<br />

Various other AFCESA Programs<br />

Various Air Staff Labor Requirements<br />

Various MAJCOM Labor Requirements<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e


Labor Support Contract<br />

Needs<br />

■<br />

■<br />

■<br />

Advisory and Assistance Services (A&AS)<br />

■ Management/professional; studies, analyses,<br />

evaluation; engineering/technical<br />

Non-A&AS Labor requirements:<br />

■ EOD, Fire, Emergency Management, CEMIRT,<br />

Pavements<br />

Requirements are worldwide<br />

■ Could include any AF mission location<br />

■ Likely to include some AOR locations<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e


Labor Support Way Forward<br />

• Expect Air Force approval to continue with GSA<br />

• When approved, GSA will provide AFCESA with<br />

Multiple BPA’s or multi-vendor BPA<br />

• Specific details will be provided at a GSA hosted<br />

Industry Day in Atlanta, GA, Date TBD<br />

• Watch for announcement in FedBizOps<br />

www.fbo.gov<br />

• GSA POC: Tony Roy, SCO, Phone: (850) 283-6481,<br />

tony.roy@gsa.gov<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e<br />

34


Questions<br />

E n g i n e e r i n g A g i l e C o m b a t S u p p o r t W o r l d w i d e<br />

35