The Kabalikat PALMA Infrastructure Project: Pigcawayan, Alamada, Libungan, Midsayap, & Aleosan Cotabato Province<br />
The IPTWG has <strong>the</strong> following mandate:<br />
• Prepare Program of Work for each municipality<br />
• Establish and recommend project schedules<br />
• Prepare listings of heavy equipment required for <strong>the</strong> respective projects<br />
• Supervise <strong>the</strong> implementation of <strong>the</strong> respective projects<br />
• Coordinate (jointly with <strong>the</strong> respective municipalities) <strong>the</strong> logistical requirements of <strong>the</strong><br />
projects<br />
• Monitor, evaluate and provide feedback to <strong>the</strong> IPSC<br />
Project Mechanics<br />
To operationalize this project, <strong>the</strong> five mayors agreed on <strong>the</strong> following mechanics:<br />
1. The project shall be rotated within <strong>the</strong> five (5) member municipalities, starting from <strong>the</strong><br />
municipality/barangay where <strong>the</strong> need is most crucial, and until such time that all <strong>the</strong><br />
farm-to-market roads in all <strong>the</strong> barangays within <strong>the</strong> Alliance shall have become allwea<strong>the</strong>r<br />
roads.<br />
2. Each member municipality shall provide only <strong>the</strong> road construction equipment needed<br />
in <strong>the</strong> particular project.<br />
3. All <strong>the</strong> necessary equipment for <strong>the</strong> project shall be simultaneously mobilized to maximize<br />
time and ensure project completion within <strong>the</strong> target period. Equipment are garaged<br />
within <strong>the</strong> project area throughout project duration, but may be withdrawn at any time by<br />
<strong>the</strong> LGU owner during emergencies.<br />
A fleet of equipment includes a bulldozer, a grader, a pay loader/back hoe loader,<br />
3-4 dump trucks, and a road compactor. Usually 2 fleets are deployed in <strong>the</strong><br />
project to be able to finish an aggregate total of <strong>10</strong>-15 kilometers of road during <strong>the</strong><br />
project duration of <strong>10</strong> working days.<br />
4. Each project must have a minimum duration of only ten (<strong>10</strong>) working days (under normal<br />
conditions).<br />
It is recommended that <strong>the</strong> bulldozer be brought to <strong>the</strong> project site 2-3 days<br />
before <strong>the</strong> actual project implementation to prepare an adequate amount of quarry<br />
materials needed for <strong>the</strong> project. Implementation of <strong>the</strong> project takes place in an<br />
average of ten (<strong>10</strong>) days under normal conditions. There is an average of one (1) km.<br />
road accomplishment per day. In cases where <strong>the</strong> conditions are more difficult, <strong>the</strong><br />
host LGU may request for an extension.<br />