“All for One and One for All” Building LGU Alliances for Infrastructure Development<br />

Table 1. Reference Matrix for Replication<br />

Key Implementation Steps/Stage Timeline Estimated budget required<br />

1. Create an Alliance or Inter-LGU<br />

organizational structure<br />

Cost of series of meetings/<br />

workshops such as; meals and<br />

snacks, accommodation for live-in<br />

workshops, traveling expenses of<br />

LGU staff for live-out workshops<br />

(especially in formulating <strong>the</strong><br />

MOA, Manual of Operations,<br />

Strategic Plan) , Honoraria of<br />

Facilitators, supplies and materials,<br />

reproduction of documents.<br />

1.1 Scenario 1: Creating an Alliance 4-6 months Cost of meetings such as; meals<br />

and snacks, supplies and materials.<br />

1.2 Scenario 2: Setting-up of Inter-LGU<br />

Organization Structure to manage<br />

<strong>the</strong> Infrastructure Project in lieu of an<br />

<strong>alliance</strong> PMO<br />

2. Enact legal and legislative measures None<br />

3. Sign Memorandum of Agreement among ½ day<br />

LGUs<br />

4. Municipal Level Pre Implementation 1 week and 2<br />

days<br />

a. Identify priority projects per<br />

2 days<br />

municipality / Make Short list<br />

b. Approval of <strong>the</strong> short listed barangays<br />

to <strong>the</strong> MDC and SB for budgetary<br />

allocation<br />

c. Conduct survey of roads in shortlisted<br />

barangays<br />

3 -4 weeks Traveling expenses of LGU officials<br />

and staff attending <strong>the</strong> meetings.<br />

Cost of snacks for <strong>the</strong> ceremonial<br />

signing of MOA<br />

1 week Cost of meetings<br />

1 week Meals and snacks of surveyors, fuel<br />

and gasoline for <strong>the</strong> vehicle used in<br />

<strong>the</strong> survey .<br />

d. Submit program of work prepared by<br />

municipal engineer to PMO<br />

Meals and snacks:<br />

P 250/surveyor x 9 surveyors x 5<br />

days = P 11,250.00<br />

Fuel and gasoline:<br />

P 500.00 for 5 days survey<br />

2 weeks Supplies and materials<br />