07.01.2015 Views

Rhondda Cynon Taf County Borough Joint Housing Land ...

Rhondda Cynon Taf County Borough Joint Housing Land ...

Rhondda Cynon Taf County Borough Joint Housing Land ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Planning Policy Wales Edition 5<br />

Planning Policy Wales Technical Advice Note 1<br />

<strong>Rhondda</strong> <strong>Cynon</strong> <strong>Taf</strong> <strong>County</strong> <strong>Borough</strong><br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012<br />

Study Report<br />

December 2012


CONTENTS<br />

Page<br />

Foreword 1<br />

Map of Study Area 2<br />

1. Summary 3<br />

2. <strong>Housing</strong> <strong>Land</strong> Supply 4<br />

3. Commentary 5<br />

4. Monitoring data 7<br />

Appendices<br />

1. Site Schedules 9<br />

2. Past Completions Data 21<br />

3. Previous <strong>Land</strong> Supply Data 22<br />

4. Inspector’s Report 23


FOREWORD<br />

This report is prepared by <strong>Rhondda</strong> <strong>Cynon</strong> <strong>Taf</strong> <strong>County</strong> <strong>Borough</strong> Council to<br />

show the results of the 2012 <strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study for <strong>Rhondda</strong><br />

<strong>Cynon</strong> <strong>Taf</strong> <strong>County</strong> <strong>Borough</strong>. Previous study reports were prepared by the Welsh<br />

Government: this report is the first to be prepared by the Council under new<br />

arrangements.<br />

<strong>Rhondda</strong> <strong>Cynon</strong> <strong>Taf</strong> covers an area of the South Wales Valleys stretching from<br />

the Brecon Beacons in the north, to the outskirts of Cardiff in the south. It<br />

comprises a mixture of urban, semi-suburban and rural communities, situated in<br />

mountains and lowland farmland.<br />

<strong>Rhondda</strong> <strong>Cynon</strong> <strong>Taf</strong> is the second largest Local Authority in Wales by<br />

population, formed in 1996 from the former <strong>Borough</strong>s of <strong>Rhondda</strong>, <strong>Cynon</strong> Valley<br />

and <strong>Taf</strong>f Ely (part). The <strong>County</strong> <strong>Borough</strong> covers an area of 424 square<br />

kilometres and has a population of 234,400 (2011 Census). The area has 75<br />

electoral wards, of which 22 are Communities First Areas. Strategic highway<br />

links with the wider region are provided by the M4, A470 and A465. A range of<br />

bus and rail services provides public transportation links across the region.<br />

The Study Area is shown on the map on page 3. It coincides with the areas of<br />

the Local Planning Authority and the Local Development Plan, which exclude<br />

the Brecon Beacons National Park. The map is the Local Development Plan key<br />

diagram, which also shows the main towns, the main communication links and<br />

strategic sites for future development.<br />

To view the adopted Local Development Plan on the Council’s website, go to<br />

www.rctcbc.gov.uk/planning click on “Development Plans” and follow the links.<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

1


<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

2


1.0 SUMMARY<br />

1.1 This is the <strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study for the <strong>County</strong> <strong>Borough</strong><br />

of <strong>Rhondda</strong> <strong>Cynon</strong> <strong>Taf</strong> for 2012. It presents the housing land supply for<br />

the Local Planning Authority’s area at the base date of 1 April 2012. It<br />

replaces the report for the previous base date of 1 April 2011.<br />

1.2 The JHLAS has been prepared in accordance with the requirements of<br />

Planning Policy Wales, Technical Advice Note 1 (TAN 1) and the<br />

Guidance Note on the JHLAS process (September 2012). To refer to<br />

these documents for details of the requirements for the maintenance of a<br />

five year housing land supply in each Local Planning Authority area and<br />

the process for undertaking the JHLA studies please go to:<br />

http://wales.gov.uk/topics/planning/planningstats/housinglandinwales/lang=en<br />

.<br />

1.3 Section 2 sets out details of the housing land supply and how it has been<br />

calculated. Table 3a shows that based on the residual method set out in<br />

TAN 1, <strong>Rhondda</strong> <strong>Cynon</strong> <strong>Taf</strong> has 4.5 years housing land supply. (Table<br />

3b shows that based on the past building rates method, the supply would<br />

be 11.3 years).<br />

Involvement<br />

1.4 The housing land supply has been assessed by <strong>Rhondda</strong> <strong>Cynon</strong> <strong>Taf</strong><br />

<strong>County</strong> <strong>Borough</strong> Council in consultation with the Home Builders<br />

Federation (HBF) and the following other parties:<br />

Cadarn <strong>Housing</strong> Group<br />

<strong>Cynon</strong> <strong>Taf</strong> <strong>Housing</strong> Association<br />

Dwr Cymru Welsh Water<br />

Hendre Ltd<br />

Newydd <strong>Housing</strong> Association<br />

<strong>Rhondda</strong> <strong>Housing</strong> Association<br />

United Welsh <strong>Housing</strong> Association<br />

Report production<br />

1.5 The Council issued draft site schedules and site proformas for<br />

consultation on 29 June 2012 for a period of 3 weeks until 20 July 2012.<br />

The HBF provided comments within this period. The Council and HBF<br />

subsequently prepared a Statement of Common Ground (SOCG) which,<br />

following consultation with the Study Group between 17 August and 7<br />

September 2012, was submitted to the Welsh Government on 21<br />

September 2012. Following the receipt of late representations, an<br />

addendum to the SOCG was submitted on 15 October 2012.<br />

1.6 It was necessary for the Welsh Government to appoint a Planning<br />

Inspector to resolve a number of disputed matters set out in the SOCG.<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

3


These matters related to details within the site schedule that could not be<br />

agreed by all parties at the SOCG stage.<br />

1.7 The appointed Planning Inspector subsequently made a<br />

recommendation to the Welsh Government on the housing land supply<br />

(Appendix 4), including recommendations on the points of dispute. The<br />

Welsh Government considered the Planning Inspector’s<br />

recommendations, and the Council has made relevant amendments to<br />

the site schedules and incorporated this information into this report<br />

(Appendix 1).<br />

2.0 HOUSING LAND SUPPLY<br />

2.1 The five-year land supply comprises sites with planning permission<br />

(outline or full) and sites allocated for housing in adopted development<br />

plans, categorised as prescribed in TAN 1.<br />

2.2 The land supply has been calculated using the residual methodology,<br />

based on the <strong>Rhondda</strong> <strong>Cynon</strong> <strong>Taf</strong> Local Development Plan up to 2021,<br />

adopted on 2 March 2011. For comparison purposes only, as agreed in<br />

the SOCG, the land supply has also been calculated using the past<br />

building rates methodology.<br />

Table 1 – Identified <strong>Housing</strong> <strong>Land</strong> Supply<br />

<strong>Housing</strong> <strong>Land</strong> Supply (2012 to 2017) - Large Sites<br />

(numbers of homes)<br />

5 Year <strong>Land</strong> Supply<br />

(TAN 1 categories)<br />

Proposed<br />

at<br />

01.04.12<br />

Total 11,032<br />

Under<br />

construction<br />

at 01.04.12<br />

Beyond<br />

01.04.17<br />

1 2 2* 3i 3ii Completed<br />

between<br />

01.04.11 &<br />

31.03.12<br />

131 229 4,965 0<br />

5,325<br />

5,700 7 357<br />

2.3 Five year land supply breakdown<br />

(i.e. numbers of homes under construction plus categories 1, 2 and 2*):<br />

Private sector 5,221<br />

Public sector 0<br />

<strong>Housing</strong> Association 104<br />

Total land available on large sites 5,325<br />

2.4 Small Site Supply – The contribution of homes from small sites of less<br />

than 10 dwellings each is based on the completions for the last five<br />

years.<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

4


Table 2 – Small Site Completions for previous 5 years<br />

(numbers of homes)<br />

2007-2008 2008-2009 2009-2010 2010-2011 2011-2012 Total<br />

244 96 83 106 74 603<br />

2.5 The overall total 5 year land supply (5,325 homes on large sites + 603<br />

on small sites) is 5,928 homes.<br />

Table 3a – 5 Year <strong>Land</strong> Supply Calculation (Residual Method)<br />

(numbers of homes)<br />

A Total <strong>Housing</strong> Requirement 2006 – 2021 (as<br />

14,385<br />

set out in the adopted Local Development<br />

Plan)<br />

B Completions to 2006 – 2012<br />

2,575<br />

(large and small sites)<br />

C Residual Requirement (A - B) 11,810<br />

D 5 Year Requirement (C / 9 x 5) 6,560<br />

E Annual Need (D / 5) 1,312<br />

F Total 5-Year <strong>Land</strong> Supply (para. 2.5) 5,928<br />

G <strong>Land</strong> Supply in Years (F / E) 4.5<br />

Table 3b – 5 Year <strong>Land</strong> Supply Calculation (Past Building Rates Method)<br />

(numbers of homes)<br />

A Total Completions In Previous 10 Years<br />

5,228<br />

2002 – 2012 (large and small sites)<br />

B Average Annual Completions (B / 10) 523<br />

C Total 5-Year <strong>Land</strong> Supply 5,928<br />

D <strong>Land</strong> Supply in Years (C / B) 11.3<br />

3.0 COMMENTARY<br />

3.1 The adoption of the Local Development Plan (LDP) in 2011 resulted in<br />

the first major release of new housing land in <strong>Rhondda</strong> <strong>Cynon</strong> <strong>Taf</strong> in 30<br />

years. Yet, the 5-year land supply was only 5.3 years in 2011, and one<br />

year on, is now below the required level of 5 years at 4.5 years. This is<br />

partly a reflection of the proportion of brownfield land in the supply,<br />

where a longer lead-in time between planning permission and<br />

development is required to allow for remediation of the land. It is also<br />

partly a reflection of the difficult economic conditions that have persisted<br />

since 2008 in Europe, the UK and Wales. Whilst the situation is more<br />

stable than in 2008-2009, recovery appears to be inhibited by continuing<br />

economic uncertainty in the Euro zone. The economic climate is<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

5


producing low expectations of future activity in the housing market, even<br />

where sites are unconstrained physically. The current low level of<br />

housing demand is illustrated by using the past completions method to<br />

calculate the housing land supply. Even using a ten-year period to<br />

include the high annual completion rates before 2008-9, under this<br />

method the housing land supply would be over 11 years.<br />

3.2 Consequently, the scope for action by the Council to increase the<br />

housing land supply in the short term is limited. The Council will however<br />

continue to monitor the supply of housing land as part of the process of<br />

producing Annual Monitoring Reports for the LDP. If necessary, the<br />

Council will include the housing land aspect in a review of the LDP.<br />

3.3 Nevertheless, there are three possible sources of increased supply of<br />

housing land. Firstly, there is unallocated land subject to Committee<br />

resolutions to grant planning permission, where section 106 agreements<br />

remain unsigned. Secondly, there is land in Category 3i. Thirdly, there<br />

are sites where planning applications have been made but are not<br />

determined.<br />

3.4 There are 10 section 106 sites, listed towards the end of Appendix 1a.<br />

These are estimated to have the potential to add 294 dwellings to the 5-<br />

year housing land supply, if the agreements were signed and the<br />

planning permissions issued. The additional of all 10 sites would<br />

increase the supply by 0.2 years, not enough to eliminate the shortfall,<br />

but a useful contribution. The Council will be re-examining these sites<br />

over the next year with owners and applicants, with a view to removing<br />

the impediments to signing of the section 106 agreements wherever<br />

possible.<br />

3.5 There are 54 sites listed in Appendix 1a where some or all the units are<br />

in category 3i. (Of these, 2 are section 106 sites – see paragraph 3.4<br />

above.) The total of units in category 3i is 5,700 – more than the total of<br />

units on large sites in the 5-year land supply (5,325).<br />

3.6 Of the 54 sites, 26 or almost half represent the later phases of large sites<br />

that already contribute to the 5-year land supply. Unless evidence comes<br />

forward that these large sites can be subdivided (or further subdivided)<br />

between housebuilders, there is limited scope for bringing forward units<br />

from Category 3i into the 5-year supply.<br />

3.7 The remaining 28 sites are wholly in 3i, on account of identified<br />

constraints. Over the next year, the Council with owners and developers<br />

will be re-examining these sites for evidence that constraints have been<br />

or can be removed, to justify their inclusion in the 5-year supply in future.<br />

3.8 Planning applications in the pipeline that are of significant size tend to<br />

relate to allocated sites that already feature in the 5-year supply and in<br />

category 3i. Normally there will also be applications submitted for windfall<br />

sites each year. The Council will use its best endeavours to progress<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

6


these applications, in order to add certainty to identified sites and to add<br />

previously unidentified sites to the supply.<br />

3.9 Finally, the Council will continue to maintain contact with owners and<br />

developers of identified sites to ensure that the forecasts of completions<br />

and the categorisation of sites are as meaningful as possible. This<br />

process can, of course, serve both to increase and to decrease the 5-<br />

year land supply.<br />

4.0 MONITORING DATA<br />

4.1 TAN 1 requires the JHLAS report to provide additional information on the<br />

development of land for housing covering the use of previously<br />

developed land, the use of sites subject to flood risk constraints and the<br />

type of housing being developed (i.e. houses, flats, other). This data is<br />

set out below in tables 4, 5 and 6.<br />

Table 4 – Re-use of Previously Developed <strong>Land</strong> (large sites)<br />

Total Number and Percentage of Homes<br />

by Category and <strong>Land</strong> Type<br />

Year 5 Year Supply Categories 3i and 3ii<br />

Greenfield Brownfield Greenfield Brownfield<br />

No. % No. % No. % No. %<br />

2011 4,263 71 1,752 29 3,643 66 1,889 34<br />

2012 3,613 68 1,712 32 4,413 77 1,294 23<br />

Completions<br />

Greenfield Brownfield<br />

No. % No. %<br />

2010-11 162 44 208 56<br />

2011-12 136 50 137 50<br />

Table 5 – Sites Subject To Flood Risk Constraints (large sites)<br />

Total Number and Percentage of Homes<br />

by Category and Flood Risk Zone<br />

Year 5 Year Supply Categories 3i and 3ii<br />

C1 C2 C1 C2<br />

No. % No. % No. % No. %<br />

2011 0 0 486 8 0 0 465 8<br />

2012 0 0 722 14 0 0 729 13<br />

Completions<br />

C1<br />

C2<br />

No. % No. %<br />

2010-11 0 0 0 0<br />

2011-12 0 0 74 27<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

7


Table 6 - Completions by Dwelling Type – 1 April 2011 to 31 March 2012<br />

(on Large Sites)<br />

Dwelling type Completions 2011-12 %<br />

Houses 225 80<br />

Apartments/flats 54 19<br />

Other (e.g. bungalows) 4 1<br />

Total completions 2011-12 (on large sites) 283 100<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

8


Appendix 1<br />

Site Schedules<br />

Numbers represent homes<br />

Northern Strategy Area sites (Private sector)<br />

Site Settlement Rem'g<br />

units<br />

Aberaman Primary<br />

School site, Cardiff Road<br />

UC Y1 Y2 Y3 Y4 Y5<br />

Apr-12 2012/13 2013/14 2014/15 2015/16 2016/17<br />

Aberdare 15 15<br />

Aberdare Hospital site Aberdare 500 40 60 400<br />

3i<br />

3ii<br />

Aberdare Little Theatre Aberdare 0<br />

Brickworks site,<br />

Llwydcoed Road (Tan y<br />

Bryn Gardens)<br />

Bronallt Terrace,<br />

Abercwmboi<br />

Cefnpennar Road and<br />

Phillip Row<br />

Aberdare 97 2 20 25 25 25<br />

Aberdare 16 16<br />

Aberdare 40 20 20<br />

Dairy Farmers of Britain Aberdare 47 25 22<br />

Milk Depot, Llwydcoed<br />

Road<br />

Dyffryn Row Aberdare 25 25<br />

Fforchneol Estate, Heoly-gelli<br />

Gadlys Scrapyard (Afon<br />

Dar Close)<br />

Godreaman Street,<br />

Godreaman<br />

Aberdare 76 76<br />

Aberdare 3 0 3<br />

Aberdare 40 20 20<br />

Heol Ty Aberaman Aberdare 50 25 25<br />

Heol Ty Aberaman<br />

extension<br />

Llwydcoed Motors,<br />

Llwydcoed Road<br />

Lower River Level Tips<br />

(ex Richmond Gardens)<br />

Aberdare 39 25 14<br />

Aberdare 0<br />

Aberdare 61 10 10 41<br />

Nant y Wenallt, Abernant Aberdare 150 50 50 50<br />

Parc Aberaman, Cardiff<br />

Road<br />

Phurnacite site,<br />

Abercwmboi<br />

Rear of Birchwood,<br />

Llwydcoed Road<br />

Richmond Gardens,<br />

Abernant<br />

Aberdare 38 3 7 14 14<br />

Aberdare 500 100 100 300<br />

Aberdare 10 10<br />

Aberdare 4 0 2 2<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

9


Site Settlement Rem'g<br />

units<br />

South East of Community<br />

Centre, Merthyr Road<br />

Tegfan Farm, Potters<br />

Field, Trecynon<br />

UC Y1 Y2 Y3 Y4 Y5<br />

Apr-12 2012/13 2013/14 2014/15 2015/16 2016/17<br />

Aberdare 15 15<br />

Aberdare 140 30 30 30 50<br />

Three Oaks Aberdare 43 4 16 23<br />

3i<br />

3ii<br />

Tirfounder Fields (Coed<br />

Dyffryn)<br />

Aberdare 162 4 16 20 20 20 20 62<br />

Ynyscynon Farm Aberdare 99 2 25 25 25 22<br />

Fenwick Street,<br />

Pontygwaith<br />

Ferndale 40 40<br />

Gwernllwyn Terrace Ferndale 30 30<br />

North of Junior School,<br />

Maerdy Road<br />

Ferndale 50 50<br />

Princess St, Blaenllechau Ferndale 10 10<br />

21 & 22 Heol-y-Graig,<br />

Rhigos<br />

Cae Brynhyfryd,<br />

Penderyn Road<br />

East of Trenant,<br />

Penywaun<br />

Hirwaun 6 3 0 3<br />

Hirwaun 34 34<br />

Hirwaun 100 100<br />

Elm Grove Hirwaun 10 4 0 4 2<br />

Longmede Park, Heol-y-<br />

Graig<br />

Hirwaun 30 30<br />

Penderyn Road (opposite<br />

Brecon Close)<br />

Hirwaun 10 4 3 3<br />

Rhombic Farm, Halt<br />

Road<br />

Hirwaun 31 10 11 10<br />

South of Hirwaun Hirwaun 400 50 50 300<br />

South of Rhigos Road Hirwaun 15 15<br />

The Bryn, Heol<br />

Pendarren<br />

Hirwaun 14 14<br />

Trewaun, Hirwaun Road Hirwaun 24 24<br />

Welsh Hills Bakery,<br />

Tramway<br />

AB Electronics Factory,<br />

Ynysboeth<br />

Hirwaun 0<br />

Mountain Ash 53 27 26<br />

Edward Street / Mountain<br />

Ash Road<br />

Mountain Ash 10 10<br />

Gwernifor Grounds,<br />

Mountain Ash<br />

Mountain Ash 4 0 2 2<br />

Pavilion Estate Mountain Ash 25 10 10 5<br />

Catherine Crescent,<br />

Cymmer<br />

Porth 15 15<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

10


Site Settlement Rem'g<br />

units<br />

Dinas Road / Graig Ddu<br />

Road Dinas<br />

Pleasant Heights,<br />

Treodyrhiw Road<br />

Porth YMCA site, Eirw<br />

Road<br />

Gellifaliog Farm (Parc<br />

Gellifaelog)<br />

Park Street, Clydach<br />

Vale<br />

UC Y1 Y2 Y3 Y4 Y5<br />

Apr-12 2012/13 2013/14 2014/15 2015/16 2016/17<br />

Porth 25 25<br />

Porth 0<br />

Porth 21 11 10<br />

Tonypandy 0<br />

Tonypandy 30 30<br />

Site of Llwynypia Hospital Tonypandy 190 25 25 25 25 90<br />

3i<br />

3ii<br />

Cemetery Road Treorchy 80 80<br />

Druids Close Treorchy 28 28<br />

Fernhill Colliery site,<br />

Blaenrhondda<br />

Treorchy 400 50 50 300<br />

<strong>Land</strong> rear of Brynhyfryd<br />

Street (Mace Lane),<br />

Ynyswen<br />

<strong>Land</strong> rear of Delwen<br />

Terrace, Blaencwm<br />

Old Bingo & Snooker<br />

Rooms<br />

Old School Playground,<br />

Treherbert<br />

Penyrenglyn Schools<br />

site, Charles St<br />

Site of Treherbert<br />

Hospital<br />

Treorchy 40 20 20<br />

Treorchy 27 14 13<br />

Treorchy 18 18<br />

Treorchy 12 12<br />

Treorchy 18 9 9<br />

Treorchy 38 38<br />

Northern total (Private) 4,008 22 76 155 310 602 579 2,264 0<br />

Southern Strategy Area sites (Private sector)<br />

Site Settlement Rem'g<br />

units<br />

UC Y1 Y2 Y3 Y4 Y5<br />

Apr-12 2012/13 2013/14 2014/15 2015/16 2016/17<br />

Bethlehem View Llanharan 82 25 25 32<br />

3i<br />

3ii<br />

Bryncae Industrial Estate. Llanharan 54 15 30 9<br />

Bridgend Road<br />

Brynna Road Llanharan 200 50 50 50 50<br />

Brynna Woods Llanharan 39 3 2 10 10 14<br />

East of Dolau Primary<br />

School, Bridgend Road,<br />

Bryncae (Woodland<br />

Meadow)<br />

Gelli-Fedi Farm phase 2-<br />

3<br />

Llanilid OCC Mine<br />

(enabling 1) Llanmoor<br />

Llanharan 97 9 25 35 28<br />

Llanharan 0<br />

Llanharan 107 27 27 27 26<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

11


Site Settlement Rem'g<br />

units<br />

Llanilid OCC Mine<br />

(enabling 2) Milton Acre<br />

Llanilid OCC Mine<br />

(enabling 3) Llantern<br />

Court<br />

Llanilid OCS Workshops<br />

(Cefn Cadno)<br />

Llanilid Strategic Site (ex<br />

enabling)<br />

UC Y1 Y2 Y3 Y4 Y5<br />

Apr-12 2012/13 2013/14 2014/15 2015/16 2016/17<br />

Llanharan 84 27 3 27 27<br />

Llanharan 5 3 2<br />

Llanharan 84 10 20 27 27<br />

Llanharan 1777 170 170 170 170 1097<br />

Brynteg Court, Beddau Llantrisant 150 15 25 25 25 60<br />

3i<br />

3ii<br />

Burgesse Crescent,<br />

Penygawsi<br />

Cwm Coking Works,<br />

Beddau<br />

Fforest Road Quarries<br />

(Gelli Ddaer Goch)<br />

Meadow Farm Link Site,<br />

Pen-yr-eglwys<br />

Llantrisant 40 20 20<br />

Llantrisant 800 75 75 75 75 500<br />

Llantrisant 54 3 24 27<br />

Llantrisant 160 160<br />

Mwyndy, Pontyclun Llantrisant 400 50 50 50 250<br />

New Town centre,<br />

Llantrisant<br />

Llantrisant 100 25 75<br />

South of The Ridings,<br />

Tonteg and east of<br />

Station Road, Church<br />

Village<br />

Talygarn Manor &<br />

Country Park<br />

Vale Castings (Meadow<br />

Walk)<br />

Llantrisant 500 75 75 75 75 200<br />

Llantrisant 0<br />

Llantrisant 8 8<br />

West of Llechau Llantrisant 88 25 25 25 13<br />

Coed-y-lan<br />

Comprehensive Lower<br />

School, Tyfica Road<br />

Coleg Morgannwg,<br />

Dyffryn Road<br />

Graig-y-wion School,<br />

Albert Road<br />

Old Farmers Arms,<br />

Pentrebach Road<br />

Pontypridd 77 20 20 20 3 14<br />

Pontypridd 50 25 25<br />

Pontypridd 29 29<br />

Pontypridd 0<br />

Penuel Lane Pontypridd 0<br />

The Grange, Tyfica Road Pontypridd 10 10<br />

Ysgol Gyfun Rhydfelen<br />

(College Green)<br />

Collenna Farm, Heol<br />

Capel<br />

Cresta Garage site,<br />

Hendreforgan<br />

Pontypridd 86 14 11 25 25 11<br />

Tonyrefail 25 25<br />

Tonyrefail 24 12 12<br />

East of Mill Street Tonyrefail 100 25 25 25 25<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

12


Site Settlement Rem'g<br />

units<br />

Gwern Heulog & The<br />

Meadows, Coedely<br />

Gwern Heulog extension,<br />

Coedely<br />

Hafod Wen / Concorde<br />

Drive<br />

Hillside Club site, Capel<br />

Hill<br />

Padfield Court, Gilfach<br />

Road<br />

Tonyrefail 0<br />

UC Y1 Y2 Y3 Y4 Y5<br />

Apr-12 2012/13 2013/14 2014/15 2015/16 2016/17<br />

Tonyrefail 150 20 20 20 20 70<br />

Tonyrefail 100 25 25 50<br />

Tonyrefail 40 20 20<br />

Tonyrefail 137 17 30 30 30 30<br />

Parc Eirin Tonyrefail 260 30 30 35 165<br />

3i<br />

3ii<br />

South of A4093 (Parc<br />

Dan y Bryn)<br />

South of Gilfach Road<br />

(Nant-y-fron)<br />

Southwest of High Street<br />

& Pretoria Road<br />

Tonyrefail 35 24 6 5<br />

Tonyrefail 12 8 4<br />

Tonyrefail 2 0 2<br />

St John the Baptist Tonyrefail 19 19<br />

Churchyard, Llantrisant<br />

Road<br />

Trane Farm Tonyrefail 700 80 80 80 460<br />

Tylcha Ganol Farm,<br />

south of Mill Street<br />

Tylcha Wen Terrace,<br />

Coedely<br />

Tonyrefail 85 85<br />

Tonyrefail 30 30<br />

Southern total (Private) 6,800 109 139 705 923 825 776 3,323 0<br />

<strong>Housing</strong> Association sites<br />

Site Settlement Rem'g<br />

units<br />

<strong>Land</strong> north of Hirwaun<br />

Road<br />

Towers & Beacons Hirwaun 0<br />

UC Y1 Y2 Y3 Y4 Y5<br />

Apr-12 2012/13 2013/14 2014/15 2015/16 2016/17<br />

Hirwaun 18 18<br />

3i<br />

3ii<br />

Cambrian Roofing Yard,<br />

Gilmour Street<br />

Tonypandy 14 0 14<br />

Glyntaff Farm, Rhydyfelin Pontypridd 65 0 58 7<br />

Hendreforgan Estate Tonyrefail 0<br />

Trane Farm, Bryngolau Tonyrefail 50 25 25<br />

Brynawelon & Bryngolwg Aberdare 37 37<br />

Cefn Lane Pontypridd 30 30<br />

Hollybush Hotel,<br />

Hopkinstown Road<br />

<strong>Housing</strong> Association<br />

total<br />

Pontypridd 10 10<br />

224 0 14 37 10 18 25 113 7<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

13


Unallocated sites awaiting signing of section 106 agreements (Private<br />

sector)<br />

Site Settlement Rem'g<br />

units<br />

Old Granary & Post<br />

House, Farm Road<br />

Ferndale Junior School,<br />

Station Road<br />

UC Y1 Y2 Y3 Y4 Y5<br />

Apr-12 2012/13 2013/14 2014/15 2015/16 2016/17<br />

Aberdare 10 10<br />

Ferndale 28 20 8<br />

Hendrefadog Ferndale 110 20 20 20 20 30<br />

3i<br />

3ii<br />

Gloucester Railway<br />

Wagon Works, Penyard<br />

Road<br />

Nidum Factory site,<br />

Manchester Place<br />

Rear of Bute Place,<br />

Penderyn Road<br />

Ffordd-y-bedol, Coed-ycwm<br />

Hirwaun 128 128<br />

Hirwaun 16 16<br />

Hirwaun 16 16<br />

Mountain Ash 21 10 11<br />

The Navigation (Area A) Mountain Ash 45 45<br />

Rhigos Road, Treherbert Treorchy 63 21 21 21<br />

Silverbrook, Upper<br />

Church Village<br />

Llantrisant 60 25 25 10<br />

Section 106 sites total 497 0 0 36 102 97 59 75 128<br />

Totals of sites<br />

Rem'g<br />

units<br />

UC Y1 Y2 Y3 Y4 Y5<br />

Apr-12 2012/13 2013/14 2014/15 2015/16 2016/17<br />

No s106 11,032 131 229 897 1,243 1,445 1,380 5,700 7<br />

3i<br />

3ii<br />

s106 497 0 0 36 102 97 59 75 128<br />

With s106 11,529 131 229 933 1,345 1,542 1,439 5,775 135<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

14


Appendix 1a<br />

Notes to the Site Schedules<br />

Northern Strategy Area sites (Private sector)<br />

Site Settlement Notes<br />

Aberaman Primary School site, Cardiff<br />

Road<br />

Aberdare<br />

Full permission 12/09. WDL Homes.<br />

Aberdare Hospital site Aberdare LDP allocation NSA 7 03/11. Inspector determined 5-year<br />

supply.<br />

Aberdare Little Theatre Aberdare Outline permission 08/08. Expired 08/11.<br />

Brickworks site, Llwydcoed Road (Tan<br />

y Bryn Gardens)<br />

Aberdare<br />

LDP allocation NSA 9.4. Active site. WDL Homes.<br />

Bronallt Terrace, Abercwmboi Aberdare Full permission 01/11. Churchfield Homes.<br />

Cefnpennar Road and Phillip Row Aberdare LDP allocation NSA 9.7 03/11.<br />

Dairy Farmers of Britain Milk Depot,<br />

Llwydcoed Road<br />

Aberdare<br />

LDP allocation NSA 9.4. Reserved matters permission<br />

12/11. Bellway.<br />

Dyffryn Row Aberdare LDP allocation NSA 9.8 03/11.<br />

Fforchneol Estate, Heol-y-gelli Aberdare Old extant full permission.<br />

Gadlys Scrapyard (Afon Dar Close) Aberdare Active site. Howard & Hills.<br />

Godreaman Street, Godreaman Aberdare LDP allocation NSA 9.10 03/11.<br />

Heol Ty Aberaman Aberdare Outline permission 02/12. Carnation.<br />

Heol Ty Aberaman extension Aberdare Outline permission 02/12. Carnation.<br />

Llwydcoed Motors, Llwydcoed Road Aberdare Outline permission 02/09. Expired 02/12 (since renewed).<br />

Lower River Level Tips (ex Richmond<br />

Gardens)<br />

Aberdare<br />

Outline permission 02/12. Short Brothers.<br />

Nant y Wenallt, Abernant Aberdare LDP allocation NSA 9.6 03/11.<br />

Parc Aberaman, Cardiff Road Aberdare Active site. Davies Homes.<br />

Phurnacite site, Abercwmboi Aberdare LDP allocation NSA 6 03/11.<br />

Rear of Birchwood, Llwydcoed Road Aberdare LDP allocation NSA 9.4 03/11.<br />

Richmond Gardens, Abernant Aberdare Active site. Morris.<br />

South East of Community Centre,<br />

Merthyr Road<br />

Aberdare<br />

LDP allocation NSA 9.3 03/11. Council-owned.<br />

Tegfan Farm, Potters Field, Trecynon Aberdare LDP allocation NSA 9.5 03/11. Council-owned.<br />

Three Oaks Aberdare Active site. Redrow.<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

15


Site Settlement Notes<br />

Tirfounder Fields (Coed Dyffryn) Aberdare Active site. Persimmon.<br />

Ynyscynon Farm Aberdare LDP allocation NSA 9.9 03/11. <strong>Land</strong>are.<br />

Fenwick Street, Pontygwaith Ferndale LDP allocation NSA 9.14 03/11.<br />

Gwernllwyn Terrace Ferndale LDP allocation NSA 9.13 03/11.<br />

North of Junior School, Maerdy Road Ferndale LDP allocation NSA 9.12 03/11.<br />

Princess St, Blaenllechau Ferndale Full permission 07/08.<br />

21 & 22 Heol-y-Graig, Rhigos Hirwaun Active site. I Davies.<br />

Cae Brynhyfryd, Penderyn Road Hirwaun Old extant outline permission.<br />

East of Trenant, Penywaun Hirwaun LDP allocation NSA 9.2 03/11.<br />

Elm Grove Hirwaun Active site. M Christopher.<br />

Longmede Park, Heol-y-Graig Hirwaun Old extant full permission. Walters.<br />

Penderyn Road (opposite Brecon<br />

Close)<br />

Hirwaun<br />

Full permission 02/11. Smarter Builders. Inspector<br />

determined 5-year supply.<br />

Rhombic Farm, Halt Road Hirwaun Full permissions 02/12. New site 2012. Millstrand.<br />

South of Hirwaun Hirwaun LDP allocation NSA 8 03/11.<br />

South of Rhigos Road Hirwaun LDP allocation NSA 9.1 03/11.<br />

The Bryn, Heol Pendarren Hirwaun Full permission 01/11. Woodland Homes.<br />

Trewaun, Hirwaun Road Hirwaun Outline permission 06/09.<br />

Welsh Hills Bakery, Tramway Hirwaun Outline permission 05/08. Expired 05/11.<br />

AB Electronics Factory, Ynysboeth Mountain Ash Full permission 08/08. Barratt.<br />

Edward Street / Mountain Ash Road Mountain Ash Full permission 09/08.<br />

Gwernifor Grounds, Mountain Ash Mountain Ash LDP allocation NSA 9.11. Active site. Walnut Grove.<br />

Pavilion Estate Mountain Ash Full permission 07/09. Wellford.<br />

Catherine Crescent, Cymmer Porth LDP allocation NSA 9.21 03/11. Council-owned.<br />

Dinas Road / Graig Ddu Road Dinas Porth LDP allocation NSA 9.20 03/11. Foxglove.<br />

Pleasant Heights, Troedyrhiw Road Porth Full permission 09/06. Expired 09/11. P W Watts.<br />

Porth YMCA site, Eirw Road Porth Full permission 04/11.<br />

Gellifaliog Farm (Parc Gellifaelog) Tonypandy Completed site. Barratt.<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

16


Site Settlement Notes<br />

Park Street, Clydach Vale Tonypandy LDP allocation NSA 9.19 03/11. Council-owned.<br />

Site of Llwynypia Hospital Tonypandy LDP allocation NSA 9.18 03/11. MCSB Ltd.<br />

Cemetery Road Treorchy LDP allocation NSA 9.17 03/11. Council-owned.<br />

Druids Close Treorchy Old extant permission.<br />

Fernhill Colliery site, Blaenrhondda Treorchy LDP allocation NSA 5 03/11.<br />

<strong>Land</strong> rear of Brynhyfryd Street (Mace<br />

Lane), Ynyswen<br />

Treorchy LDP allocation NSA 9.16 03/11.<br />

<strong>Land</strong> rear of Delwen Terrace,<br />

Blaencwm<br />

Treorchy<br />

Outline permissions 10/11. Inspector determined 5-year<br />

supply. Glaister Russell.<br />

Old Bingo & Snooker Rooms Treorchy Full permission 04/09. Gilheaney.<br />

Old School Playground, Treherbert Treorchy LDP allocation NSA 9.15 03/11. Derek George.<br />

Penyrenglyn Schools site, Charles St Treorchy Outline permission 06/11. New site 2012.<br />

Site of Treherbert Hospital Treorchy LDP allocation NSA 9.15 03/11. Derek George.<br />

Southern Strategy Area sites (Private sector)<br />

Site Settlement Notes<br />

Bethlehem View Llanharan Outline permission 10/07 extant. Naturally Woodlands /<br />

Southward Homes.<br />

Bryncae Industrial Estate. Bridgend<br />

Road<br />

Llanharan<br />

Outline permission 04/09. LH (Llanharan) Ltd.<br />

Brynna Road Llanharan LDP allocation SSA 10.11 03/11. Inspector determined 5-<br />

year supply.<br />

Brynna Woods Llanharan Active site. Naturally Woodlands / Southward Homes.<br />

East of Dolau Primary School,<br />

Llanharan LDP allocation SSA 10.12. Active site. Redrow.<br />

Bridgend Road, Bryncae (Woodland<br />

Meadow)<br />

Gelli-Fedi Farm phase 2-3 Llanharan Reserved matters approval 05/09. Expired 05/11. Briarley.<br />

Llanilid OCC Mine (enabling 1)<br />

Llanmoor<br />

Llanilid OCC Mine (enabling 2) Milton<br />

Acre<br />

Llanilid OCC Mine (enabling 3)<br />

Lantern Court<br />

Llanilid OCS Workshops (Cefn<br />

Cadno)<br />

Llanharan<br />

Llanharan<br />

Llanharan<br />

Llanharan<br />

LDP allocation SSA 9. Outline permission 08/07. Extant.<br />

Llanmoor.<br />

LDP allocation SSA 9. Active site. Persimmon.<br />

LDP allocation SSA 9. Active site. Charles Church.<br />

Active site. Llanmoor.<br />

Llanilid Strategic Site (ex enabling) Llanharan LDP allocation SSA 9 03/11. Resolution to grant permission<br />

11/11. Cofton.<br />

Brynteg Court, Beddau Llantrisant LDP allocation SSA 10.15 03/11. Full application submitted<br />

08/12. Lewis Homes.<br />

Burgesse Crescent, Penygawsi Llantrisant LDP allocation SSA 10.14 03/11. Full application submitted<br />

05/12. Derek George.<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

17


Site Settlement Notes<br />

Cwm Coking Works, Beddau Llantrisant LDP allocation SSA 7 03/11. Outline application submitted<br />

10/10.<br />

Fforest Road Quarries (Gelli Ddaer<br />

Goch)<br />

Llantrisant<br />

Active site. Llanmoor & Lewis Homes<br />

Meadow Farm Link Site, Pen-yreglwys<br />

Llantrisant<br />

LDP allocation SSA 10.16 03/11. Full application submitted<br />

05/08. Persimmon.<br />

Mwyndy, Pontyclun Llantrisant LDP allocation SSA 8 03/11. Valad.<br />

New Town centre, Llantrisant Llantrisant LDP allocation SSA 8 03/11. Outline application submitted<br />

11/11. Valad.<br />

South of The Ridings, Tonteg and<br />

east of Station Road, Church Village<br />

Llantrisant<br />

LDP allocation SSA 10.18 03/11. Persimmon.<br />

Talygarn Manor & Country Park Llantrisant Completed site. Cowbridge Developments.<br />

Vale Castings (Meadow Walk) Llantrisant Active site. Persimmon.<br />

West of Llechau Llantrisant LDP allocation SSA 10.13. Active site. Lovell.<br />

Coed-y-lan Comprehensive Lower<br />

School, Tyfica Road<br />

Pontypridd<br />

Outline permission 12/10. Andgreen.<br />

Coleg Morgannwg, Dyffryn Road Pontypridd Outline permission 11/09.<br />

Graig-y-wion School, Albert Road Pontypridd Full permission 01/10. Pearcey.<br />

Old Farmers Arms, Pentrebach Road Pontypridd Site no longer available for housing.<br />

Penuel Lane Pontypridd Full permission 04/06. Expired 04/11. Cadwallader.<br />

The Grange, Tyfica Road Pontypridd Full permission 05/09. G Walter.<br />

Ysgol Gyfun Rhydfelen (College<br />

Green)<br />

Pontypridd<br />

Active site. Barratt.<br />

Collenna Farm, Heol Capel Tonyrefail LDP allocation SSA 10.3 03/11.<br />

Cresta Garage site, Hendreforgan Tonyrefail Full permission 06/08. Brickflair.<br />

East of Mill Street Tonyrefail LDP allocation SSA 10.6 03/11.<br />

Gwern Heulog & The Meadows,<br />

Coedely<br />

Tonyrefail<br />

Completed site. Lewis Homes.<br />

Gwern Heulog extension, Coedely Tonyrefail LDP allocation SSA 10.7 03/11. Outline & full applications<br />

submitted 08/11. Lewis Homes.<br />

Hafod Wen / Concorde Drive Tonyrefail LDP allocation SSA 10.10 03/11.<br />

Hillside Club site, Capel Hill Tonyrefail LDP allocation SSA 10.5 03/11. Outline application<br />

submitted 11/10. R Long.<br />

Padfield Court, Gilfach Road Tonyrefail Active site. Llanmoor.<br />

Parc Eirin Tonyrefail Outline permission 03/10. WG-owned. Inspector<br />

determined 5-year supply.<br />

South of A4093 (Parc Dan y Bryn) Tonyrefail Active site. Redrow.<br />

South of Gilfach Road (Nant-y-fron) Tonyrefail Active site. Davies Homes.<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

18


Site Settlement Notes<br />

Southwest of High Street & Pretoria<br />

Road<br />

Tonyrefail<br />

Old full permission. Extant.<br />

St John the Baptist Churchyard,<br />

Llantrisant Road<br />

Tonyrefail Outline permission 09/10.<br />

Trane Farm Tonyrefail LDP allocation 03/11 SSA 10.2. Outline application<br />

submitted 08/12. Dorchester.<br />

Tylcha Ganol Farm, south of Mill<br />

Street<br />

Tonyrefail LDP allocation SSA 10.9 03/11.<br />

Tylcha Wen Terrace, Coedely Tonyrefail LDP allocation SSA 10.8 03/11.<br />

<strong>Housing</strong> Association sites<br />

Site Settlement Notes<br />

<strong>Land</strong> north of Hirwaun Road Hirwaun Full permission 02/10. Newydd HA.<br />

Towers & Beacons Hirwaun Completed site. <strong>Cynon</strong> <strong>Taf</strong>f HA.<br />

Cambrian Roofing Yard, Gilmour<br />

Street<br />

Tonypandy<br />

Full permission 03/11. <strong>Rhondda</strong> HA.<br />

Glyntaff Farm, Rhydyfelin Pontypridd LDP allocation SSA 10.17 03/11. Newydd HA.<br />

Hendreforgan Estate Tonyrefail Full permission 11/06. Expired 11/11. RCTCBC.<br />

Trane Farm, Bryngolau Tonyrefail LDP allocation SSA 10.4 03/11. Hendre / Hafod HA.<br />

Brynawelon & Bryngolwg Aberdare Full permission 03/12. New site 2012. RCT Homes.<br />

Cefn Lane Pontypridd LDP allocation SSA 10.1 03/11. Council-owned.<br />

Hollybush Hotel, Hopkinstown Road Pontypridd Full permission 09/10. <strong>Rhondda</strong> HA.<br />

Unallocated sites awaiting signing of section 106 agreements (Private<br />

sector)<br />

Site Settlement Notes<br />

Old Granary & Post House, Farm<br />

Road<br />

Aberdare<br />

Resolution to grant outline permission 06/11. New site<br />

2012.<br />

Ferndale Junior School, Station Road Ferndale Resolution to grant outline permission 12/08. Foxglove.<br />

Hendrefadog Ferndale Resolution to grant outline permission 09/10. Adrienne.<br />

Gloucester Railway Wagon Works,<br />

Penyard Road<br />

Hirwaun<br />

Resolution to grant outline permission 09/11. Piper Homes.<br />

Nidum Factory site, Manchester Place Hirwaun Resolution to grant outline permission 06/11. New site<br />

2012.<br />

Site<br />

Settlement<br />

Rear of Bute Place, Penderyn Road Hirwaun Resolution to approve reserved matters 09/11.<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

19


Site Settlement Notes<br />

Ffordd-y-bedol, Coed-y-cwm Mountain Ash Resolution to grant outline permission 01/12. New site<br />

2012. JCW.<br />

The Navigation (Area A) Mountain Ash Resolution to grant outline permission 12/06.<br />

Rhigos Road, Treherbert Treorchy Resolution to grant outline permission 01/12. New site<br />

2012. West Midlands.<br />

Silverbrook, Upper Church Village Llantrisant Resolution to grant outline permission 11/06. Councilowned.<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

20


Appendix 2 – Completion Data From Past Years<br />

Number of homes completed:<br />

In the period Large<br />

sites<br />

Small<br />

sites<br />

Total<br />

completions<br />

2006-07 382 113 495<br />

2007-08 462 244 706<br />

2008-09 191 96 287<br />

2009-10 180 83 263<br />

2010-11 361 106 467<br />

2011-12 283 74 357<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

21


Appendix 3 – Previous <strong>Land</strong> Supply Data<br />

Reported<br />

in Study<br />

for year<br />

5 year supply - number<br />

of homes (TAN 1<br />

categories)<br />

(position<br />

on 1<br />

April) 1 2 2*<br />

Number of<br />

years supply<br />

Supply<br />

beyond 5<br />

years –<br />

number of<br />

homes<br />

3i 3ii<br />

2007 548 2,120 0 5.1 2,114 77<br />

2008 305 1,446 0 4.0 2,841 83<br />

2009 294 1,754 0 5.3 2,339 211<br />

2010 385 2,350 0 7.6 2,502 211<br />

2011^ 369 5,646 0 5.3 5,397 135<br />

2012* 360 4,965 0 4.5 5,700 7<br />

^ The 2011 Study was the first to be based on the Local Development Plan.<br />

* This Study<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

22


Appendix 4 – Inspector’s Report<br />

Argymhelliad i Lywodraeth Cymru ar Gyd-astudiaeth<br />

Argaeledd Tir ar gyfer Tai<br />

Recommendation to Welsh Government on <strong>Joint</strong><br />

<strong>Housing</strong> <strong>Land</strong> Availability Study<br />

gan P J Davies<br />

Arolygydd o’r Arolygiaeth Gynllunio<br />

by P J Davies<br />

an Inspector of the Planning Inspectorate<br />

Dyddiad: 09/11/2012 Date: 09/11/2012<br />

Ref: APP/L6940/JHLAS/12/515713<br />

Local Planning Authority: <strong>Rhondda</strong> <strong>Cynon</strong> <strong>Taf</strong> <strong>County</strong> <strong>Borough</strong> Council<br />

<br />

<br />

This report concerns the <strong>Rhondda</strong> <strong>Cynon</strong> <strong>Taf</strong> <strong>County</strong> <strong>Borough</strong> Council <strong>Joint</strong><br />

<strong>Housing</strong> <strong>Land</strong> Availability Study (JHLAS) 2012.<br />

The matters in dispute are set out in the JHLAS Statement of Common<br />

Ground (SoCG) submitted in September 2012, the addendum dated October<br />

2012 and second addendum comprising revised 5 year land supply<br />

calculations and schedule of sites.<br />

Recommendation<br />

1. That the 2012 JHLAS housing land supply figure as at 1 April 2012 for the<br />

<strong>Rhondda</strong> <strong>Cynon</strong> <strong>Taf</strong> <strong>County</strong> <strong>Borough</strong> Council planning area be determined as<br />

4.5 years.<br />

Context of the Recommendation<br />

2. Local Planning Authorities have a duty to ensure that sufficient land is<br />

genuinely available or will become available to provide a 5-year supply of land<br />

for housing 1 .<br />

The purpose of preparing a JHLAS is to:<br />

Monitor the provision of market and affordable housing;<br />

Provide an agreed statement of residential land availability for<br />

development planning and control purposes; and<br />

Set out the need for action in situations where an insufficient supply is<br />

identified 2 .<br />

1 PPW Edition 5 paragraph 9.2.3<br />

2 TAN 1: <strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Studies (June 2006) paragraph 2.1<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

23


3. The scope of this report is to recommend an appropriate housing land supply<br />

figure in respect of the <strong>Rhondda</strong> <strong>Cynon</strong> <strong>Taf</strong> <strong>County</strong> <strong>Borough</strong> Council‘s area of<br />

responsibility as local planning authority, in the light of the matters in dispute<br />

concerning the calculation of such a figure and the available evidence.<br />

Main Issue<br />

4. There is agreement that the residual method is the appropriate methodology<br />

for calculating land supply. The main issue is whether each of the disputed sites<br />

should be counted as contributing to the 5-year land supply of land for housing<br />

at the time of the base date of the study.<br />

Reasons<br />

5. There are ten disputed sites and the second addendum to the SoCG<br />

indicates that the agreed housing land supply, including small sites, is 5251<br />

units. The number of disputed units is 1047. The SoCG confirms that all the<br />

disputed sites are either allocated in the adopted Local Development Plan, or<br />

have planning permission for housing on 1 April 2012. They therefore satisfy the<br />

conditions set out in 7.1.2 of TAN 1. TAN 1 also provides advice on the criteria<br />

to be applied in considering whether sites may be regarded as genuinely<br />

available within a five year period. In addition, Section 7.4 of the TAN provides<br />

advice on sites that have remained in the land supply for periods well in excess<br />

of 5 years. I have assessed each of the disputed sites on the available evidence<br />

and in line with the advice in the TAN.<br />

6. Aberdare Hospital Site: A number of constraints to developing the site have<br />

been identified and the site has yet to be disposed to a housebuilder. In<br />

particular, there are difficulties in agreeing off site highway issues. Although a<br />

planning application is being actively progressed, the agents for the landowner<br />

provide revised figures which they state project the future development of the<br />

site more accurately. These set out 40 dwellings for completion in 2015-16 and<br />

60 dwellings in 2016-17. The Council do not provide any tangible evidence to<br />

challenge these projections and given the identified constraints, I consider that<br />

these projections should be used for calculating the land supply. I conclude<br />

therefore that 100 units should be included in the land supply.<br />

7. Phurnacite Site, Abercwmboi: The landowner’s intentions for the site are set<br />

out in the SoCG and whilst planning permission and site disposal have yet to be<br />

realised, no physical constraints to developing the site have been identified. In<br />

the circumstances, I do not consider it unreasonable to expect 100 units to be<br />

delivered per annum in 2015-16 and 2016-17. I therefore conclude that 200<br />

units should be included in the 5 year land supply.<br />

8. Ynyscynon Farm, Cwmbach: At the time of the study base date, an outline<br />

application was before the Council, and 2 completions have taken place at one<br />

end of the site. No major physical constraints are identified and a 2 year lead in<br />

time to allow for site disposal and full planning permissions has been built in. I<br />

have no evidence to challenge the Council’s forecast that 25 units per annum<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

24


will be delivered in the last 3 years of the study period and I therefore conclude<br />

that 75 units should be included in the 5 year land supply.<br />

9. Penderyn Road (opposite Brecon Close): Although the site has been in the<br />

land supply for a number of years, it changed hands in 2008 and there is a valid<br />

planning permission up until 2016. The developer has stated that they intend to<br />

start development within the next 3 years and I am not aware of any physical<br />

constraints to developing the site. I consider that the reasons for leaving the site<br />

in the land supply are sufficiently explained and I conclude that the 10 units<br />

should be included in the 5 year land supply.<br />

10. Fernhill Colliery Site, Blaenrhondda: Little has changed since the 2011<br />

study when a development rate of 50 per annum for the last 2 years of the study<br />

period was concluded as reasonable based on the developers intentions. Whilst<br />

the developers are projecting a higher rate of development for the 2012 study,<br />

planning permission has not been obtained and I concur that there is little<br />

evidence to support these higher projections. The site is an LDP Strategic Site<br />

and I consider that the 100 units as projected by the Council is reasonable and<br />

should be included in the 5 year land supply.<br />

11. <strong>Land</strong> rear of Delwen Terrace, Blaencwm: Although the site has been in the<br />

5 year land supply for a number of years, planning permission was recently<br />

renewed in 2011 and the site capacity reduced. This gives some indication of<br />

an intention to develop, and I consider that it gives sufficient explanation for the<br />

site remaining in the 5 year land supply. I conclude that 27 units should be<br />

included in the 5 year land supply.<br />

12. Brynna Road (200 dwellings): The site is in a strong housing market area<br />

and it is said that another large site in the area is built out. I am not aware of<br />

any major constraints to developing the site and I conclude that it should be<br />

included in the 5 year land supply.<br />

13. Mwyndy, Pontyclun: The forecasts provided by the Council repeat the 2011<br />

study timings, and anticipate 100 units per annum for delivery in the last 3 years<br />

of the study period. However, the developers have advised that there is no<br />

programme for developing the site and whilst the site is greenfield and<br />

unconstrained, I consider that the HBF forecast of 50 units per annum in the last<br />

3 years of the study period is more realistic. I conclude that 150 units should be<br />

included in the 5 year land supply.<br />

14. Parc Eirin: The site has a valid planning permission and it is in an attractive<br />

accessible location. It has been prepared for development and no major<br />

physical constraints have been identified. I conclude that the Council’s forecasts<br />

are reasonable and that 95 units should be included in the 5 year land supply.<br />

15. Trane Farm: The site is greenfield and no major physical constraints have<br />

been identified. Nonetheless the Council accepts that its original forecasts were<br />

optimistic and have amended the forecasts to allow more lead in time to<br />

development. The site is in an attractive and accessible location and given that<br />

an outline planning application has now been submitted, I consider that it is<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

25


easonable to expect 80 dwellings to be delivered per annum in the last 3 years<br />

of the study period. I conclude that 240 units should be included in the 5 year<br />

land supply.<br />

16. Having regard to the difference between the Council’s housing forecasts for<br />

each disputed site and those of the HBF, I conclude that of the 1047 disputed<br />

units, 677 units should be added to the agreed land supply of 5251 so that there<br />

is a land supply of 5928 units. The agreed annual housing requirement is 1312<br />

units and using the residual methodology this results in a land supply of 4.5<br />

years.<br />

Overall Conclusions<br />

17. Based on the foregoing analysis I conclude that the housing land supply for<br />

the <strong>Rhondda</strong> <strong>Cynon</strong> <strong>Taf</strong> <strong>County</strong> <strong>Borough</strong> Council planning area as at 1 April<br />

2012 is 4.5 years.<br />

P J Davies<br />

Inspector<br />

<strong>Joint</strong> <strong>Housing</strong> <strong>Land</strong> Availability Study 2012 - Study Report<br />

26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!