07.01.2015 Views

TDW Qualification Plan - T.D. Williamson, Inc.

TDW Qualification Plan - T.D. Williamson, Inc.

TDW Qualification Plan - T.D. Williamson, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

MichCon<br />

SAP<br />

SO Cal<br />

610<br />

6.1<br />

Appendix 1: T.D. <strong>Williamson</strong> Operator <strong>Qualification</strong> <strong>Plan</strong> - Current Covered Task List<br />

Covered Task Description<br />

Evaluation<br />

Interval,<br />

Method<br />

Span of<br />

Control <strong>TDW</strong> B31Q API Veriforce MEA<br />

Hot Tapping and Plugging<br />

Abnormal operating conditions<br />

general (NCCER) AOCF_1<br />

Prevention of accidental release<br />

of gas<br />

Composite material repair sleeve<br />

Launch a pipeline pig or<br />

instrument pig<br />

Receive a pipeline pig or<br />

instrument pig<br />

Inspection for Physical damage<br />

to buried or submerged pipeline<br />

Measuring with a Pit Gauge<br />

Insert and remove Coupons<br />

Perform Internal Corrosion<br />

Mediation<br />

Prep Surface for Coating<br />

Visual inspection of a surface<br />

Use of Probe equipment<br />

Pressure Test<br />

36 months<br />

P & W/O<br />

1:2 or 1.1* CT 50,<br />

T 50,<br />

D 50<br />

1081,<br />

1091,<br />

1111,<br />

1131<br />

36 months<br />

W/O - CT 50 -<br />

40.6,<br />

40.7,<br />

40.8,<br />

40.9,<br />

40.91<br />

Gas<br />

Liquids<br />

611,<br />

612<br />

201<br />

1414,<br />

1425,<br />

1426<br />

1414.03<br />

1425.01<br />

1426.02<br />

1426.02.01<br />

1426.02.02<br />

36 months<br />

P & W/O 1:2 CT 50 - - - CTS2011 2011.01<br />

36 months<br />

P & W/O<br />

1:2 W 50 1061 40.3 705, 706 1432 1432.04<br />

36 months<br />

P & W/O 1:2 LR 50 - 29.1<br />

36 months<br />

P & W/O 1:2 LR 50 - 29.2<br />

36 months<br />

P & W/O 1:1 -<br />

0211,<br />

0201,<br />

0151<br />

36 months<br />

P & W/O 1:1 - 0211 8.1<br />

36 months<br />

P & W/O<br />

1:1 CT50 0131 10.1<br />

36 months<br />

P & W/O 1:3 - 1021 11<br />

36 months<br />

P & W/O 1:5 -<br />

36 months<br />

P & W/O 1:1 -<br />

0991,<br />

1001,<br />

1011<br />

0211,<br />

0201,<br />

0151<br />

5.1<br />

13.4<br />

15.1<br />

36 months<br />

P & W/O<br />

1:1 - 1291 16.1<br />

36 months<br />

0561,<br />

P & W/O 1:2 -<br />

0571,<br />

0581<br />

Welding As specified 1:0 - 0801 42<br />

Install Mechanical Clamps and<br />

Sleeves<br />

36 months<br />

P & W/O 1:2 - 1041<br />

*Based on Operator<br />

18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!