07.01.2015 Views

EVALUATION OF THE SCHEME OF FREE SUPPLY OF UNIFORM ...

EVALUATION OF THE SCHEME OF FREE SUPPLY OF UNIFORM ...

EVALUATION OF THE SCHEME OF FREE SUPPLY OF UNIFORM ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

) EMD amount will have to be submitted by the Bidder taking into account the<br />

following conditions:<br />

8. EMD will be accepted only in the form of electronic cash (and not through Demand Draft<br />

or Bank Guarantee)<br />

9. The entire EMD amount for a particular tender has to be paid in a single transaction.<br />

The EMD submitted by the Successful Bidder shall be released upon furnishing of<br />

Performance Security in the form and manner as stipulated in the Agreement.<br />

the<br />

The EMD shall be forfeited in the following cases:<br />

a) If the Bidder modifies or withdraws the Proposal;<br />

b) If the Bidder withdraws the Proposal during the interval between the Proposal<br />

due date and expiration of the Proposal Validity period;<br />

c) If the Successful Bidder fails to provide the Performance Security within the<br />

stipulated time or any extension thereof provided by the SSA Samithi;<br />

d) If any information or document furnished by the Bidder turns out to be<br />

misleading or untrue in any material respect;<br />

10. Evaluation : A two – stage procedure will be adopted in evaluating the proposals<br />

with the technical evaluation being completed prior to any financial proposals<br />

being opened. The technical proposals will be evaluated using the following<br />

criteria.<br />

Points<br />

(i) Specific experience of the consultants related to 20<br />

the Assignment<br />

(ii) Adequacy of the proposed work plan and 25<br />

methodology in responding to the TOR<br />

(iii) Qualifications and competence of the key 45<br />

professional staff for the Assignment<br />

(iv) Suitability of the transfer of knowledge program 10<br />

Total Points : 100<br />

The minimum technical score required to pass is: 75 points<br />

11.<br />

Deciding Award of Contract<br />

(a)<br />

The client will carry out the evaluation of proposals on the basis of their<br />

responsiveness to the Terms of Reference, applying the evaluation criteria<br />

and marking system specified. Each responsive proposal will be given a<br />

technical score (TS). A proposal to be considered unsuitable shall be<br />

rejected at this stage if it does not respond to the important aspects of the<br />

Terms of Reference or if it fails to achieve the minimum technical score<br />

indicated.<br />

CPE Section Page 6 of 43

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!