Hist and Proj Operating Receipts FY 2011 2 17 2010 - DC Water

Hist and Proj Operating Receipts FY 2011 2 17 2010 - DC Water Hist and Proj Operating Receipts FY 2011 2 17 2010 - DC Water

07.01.2015 Views

I Others ·FY 2009 - Sewer Pumping ·FY 2009 water Pumping ·FY 2009 e waste Water Treatment ·FY 2009 ~ 20,000,000 ~ ~ e.. 15,000,000 o Oct No\/' Dee Jan Feb Mar Apr May Jun Jul Aug Sep As a part of the energy management strategy the Department of Engineering and Technical Services has confirmed its initial evaluation of the economic and carbon footprint benefits of on-site generation of power with a combined heat cycle in conjunction with the biosolids management technologies being considered. As noted in the chart above, the majority of our power use is at the Blue Plains, so those activities that can help reduce electric consumption on the Plant will produce significant impacts on the reduction of our carbon footprint. DC WASA continues its environmental stewardship implementing environmentally responsive and responsible polices and programs. These actions protect the region's waterways, air, and land. In FY 2009, DC WASA established a Carbone Footprint Steering Committee and an Energy Steering Team each led by the Energy Manager. The Carbon Footprint Steering Committee was established to formulate and provide guidance for the Authority's carbon footprint (greenhouse gases) inventory and reduction objectives and to serve as a resource in evaluating opportunities and challenges associated with evolving federal and regional Budget Overview and Performance 11-40

carbon footprint legislation and regulation. At the end of FY 2009, DC WASA has completed its carbon footprint inventory as a part of the District of Columbia governmental sector carbon footprint inventory using 2006 as the base year. Additionally, DC WASA has completed its carbon footprint inventories for 2007 and 2008, respectively, in compliance with The Climate Registry's General Reporting Protocol. These inventories will serve as the baseline in establishing carbon footprint reduction goals, a specific Board strategic critical success factor. The Energy Steering Team provides input into the development of a ten-year energy management plan and will playa vital role in the conduct of DC WASA's comprehensive energy audit planned for completion in FY 2010. The energy audit will provide a technical energy savings analysis of DC WASA assets, development of a methodology for measurement and verification of savings projections and evaluation of cost/benefit of implementation of recommendations. Additionally, the Authority will seek and analyze opportunities to engage in peak load curtailment and load shedding programs through PJM (Pennsylvania, Jersey and Maryland) to reduce cost and earn payment for such actions. During FY 2009, DC WASA completed a Sewer System Facility assessment. This document culminated a five year effort involving sewer inspection and condition assessment, development of a sewer GIS and database, hydraulic monitoring and modeling to assess system capacity and the development of a prioritized activities for system improvement. This Sewer System Facility assessment identified approximately $537 million (lifetime funding) for sewer infrastructure improvements. As recommended in the assessment, the current CIP includes funds for an ongoing, annual sewer inspection program, which may identify the need for additional work. • Generally speaking, major sewer pipe infrastructure can meet current and future population needs; however, continued investment in upgrades to major infrastructure elements is needed. • 88% of the sewers inspected had some defects, 60% of which could be addressed using localized repair and the remaining require mainly lining. • 94% of the manholes inspected were found to have one or more defects. • The number and severity of pipe defects indicates an expected increase in problems in pipes greater than 75 years old. Older pipes can be in good condition (and younger ones can be in poor condition), but at the 75 year mark, DC WASA can assume more extensive and frequent inspection is needed. • There are approximately 210 miles of sewers in stream valleys and about 12.3 miles of these sewers were found to need some type of repair. • There are about 364,000 linear feet of sewers with some portion under buildings; of those inspected, a preliminary list was been developed of buildings over sewers found to have multiple and/or significant defects warranting rehabilitation or replacement. Budget Overview and Performance 11-41

carbon footprint legislation <strong>and</strong> regulation. At the end of <strong>FY</strong> 2009, <strong>DC</strong> WASA has completed its carbon footprint inventory as a part of<br />

the District of Columbia governmental sector carbon footprint inventory using 2006 as the base year. Additionally, <strong>DC</strong> WASA has<br />

completed its carbon footprint inventories for 2007 <strong>and</strong> 2008, respectively, in compliance with The Climate Registry's General<br />

Reporting Protocol. These inventories will serve as the baseline in establishing carbon footprint reduction goals, a specific Board<br />

strategic critical success factor. The Energy Steering Team provides input into the development of a ten-year energy management<br />

plan <strong>and</strong> will playa vital role in the conduct of <strong>DC</strong> WASA's comprehensive energy audit planned for completion in <strong>FY</strong> <strong>2010</strong>. The<br />

energy audit will provide a technical energy savings analysis of <strong>DC</strong> WASA assets, development of a methodology for measurement<br />

<strong>and</strong> verification of savings projections <strong>and</strong> evaluation of cost/benefit of implementation of recommendations. Additionally, the<br />

Authority will seek <strong>and</strong> analyze opportunities to engage in peak load curtailment <strong>and</strong> load shedding programs through PJM<br />

(Pennsylvania, Jersey <strong>and</strong> Maryl<strong>and</strong>) to reduce cost <strong>and</strong> earn payment for such actions.<br />

During <strong>FY</strong> 2009, <strong>DC</strong> WASA completed a Sewer System Facility assessment. This document culminated a five year effort involving<br />

sewer inspection <strong>and</strong> condition assessment, development of a sewer GIS <strong>and</strong> database, hydraulic monitoring <strong>and</strong> modeling to<br />

assess system capacity <strong>and</strong> the development of a prioritized activities for system improvement. This Sewer System Facility<br />

assessment identified approximately $537 million (lifetime funding) for sewer infrastructure improvements. As recommended in the<br />

assessment, the current CIP includes funds for an ongoing, annual sewer inspection program, which may identify the need for<br />

additional work.<br />

• Generally speaking, major sewer pipe infrastructure can meet current <strong>and</strong> future population needs; however, continued<br />

investment in upgrades to major infrastructure elements is needed.<br />

• 88% of the sewers inspected had some defects, 60% of which could be addressed using localized repair <strong>and</strong> the remaining<br />

require mainly lining.<br />

• 94% of the manholes inspected were found to have one or more defects.<br />

• The number <strong>and</strong> severity of pipe defects indicates an expected increase in problems in pipes greater than 75 years old.<br />

Older pipes can be in good condition (<strong>and</strong> younger ones can be in poor condition), but at the 75 year mark, <strong>DC</strong> WASA can<br />

assume more extensive <strong>and</strong> frequent inspection is needed.<br />

• There are approximately 210 miles of sewers in stream valleys <strong>and</strong> about 12.3 miles of these sewers were found to need<br />

some type of repair.<br />

• There are about 364,000 linear feet of sewers with some portion under buildings; of those inspected, a preliminary list was<br />

been developed of buildings over sewers found to have multiple <strong>and</strong>/or significant defects warranting rehabilitation or<br />

replacement.<br />

Budget Overview <strong>and</strong> Performance<br />

11-41