Hist and Proj Operating Receipts FY 2011 2 17 2010 - DC Water
Hist and Proj Operating Receipts FY 2011 2 17 2010 - DC Water Hist and Proj Operating Receipts FY 2011 2 17 2010 - DC Water
I Others ·FY 2009 - Sewer Pumping ·FY 2009 water Pumping ·FY 2009 e waste Water Treatment ·FY 2009 ~ 20,000,000 ~ ~ e.. 15,000,000 o Oct No\/' Dee Jan Feb Mar Apr May Jun Jul Aug Sep As a part of the energy management strategy the Department of Engineering and Technical Services has confirmed its initial evaluation of the economic and carbon footprint benefits of on-site generation of power with a combined heat cycle in conjunction with the biosolids management technologies being considered. As noted in the chart above, the majority of our power use is at the Blue Plains, so those activities that can help reduce electric consumption on the Plant will produce significant impacts on the reduction of our carbon footprint. DC WASA continues its environmental stewardship implementing environmentally responsive and responsible polices and programs. These actions protect the region's waterways, air, and land. In FY 2009, DC WASA established a Carbone Footprint Steering Committee and an Energy Steering Team each led by the Energy Manager. The Carbon Footprint Steering Committee was established to formulate and provide guidance for the Authority's carbon footprint (greenhouse gases) inventory and reduction objectives and to serve as a resource in evaluating opportunities and challenges associated with evolving federal and regional Budget Overview and Performance 11-40
carbon footprint legislation and regulation. At the end of FY 2009, DC WASA has completed its carbon footprint inventory as a part of the District of Columbia governmental sector carbon footprint inventory using 2006 as the base year. Additionally, DC WASA has completed its carbon footprint inventories for 2007 and 2008, respectively, in compliance with The Climate Registry's General Reporting Protocol. These inventories will serve as the baseline in establishing carbon footprint reduction goals, a specific Board strategic critical success factor. The Energy Steering Team provides input into the development of a ten-year energy management plan and will playa vital role in the conduct of DC WASA's comprehensive energy audit planned for completion in FY 2010. The energy audit will provide a technical energy savings analysis of DC WASA assets, development of a methodology for measurement and verification of savings projections and evaluation of cost/benefit of implementation of recommendations. Additionally, the Authority will seek and analyze opportunities to engage in peak load curtailment and load shedding programs through PJM (Pennsylvania, Jersey and Maryland) to reduce cost and earn payment for such actions. During FY 2009, DC WASA completed a Sewer System Facility assessment. This document culminated a five year effort involving sewer inspection and condition assessment, development of a sewer GIS and database, hydraulic monitoring and modeling to assess system capacity and the development of a prioritized activities for system improvement. This Sewer System Facility assessment identified approximately $537 million (lifetime funding) for sewer infrastructure improvements. As recommended in the assessment, the current CIP includes funds for an ongoing, annual sewer inspection program, which may identify the need for additional work. • Generally speaking, major sewer pipe infrastructure can meet current and future population needs; however, continued investment in upgrades to major infrastructure elements is needed. • 88% of the sewers inspected had some defects, 60% of which could be addressed using localized repair and the remaining require mainly lining. • 94% of the manholes inspected were found to have one or more defects. • The number and severity of pipe defects indicates an expected increase in problems in pipes greater than 75 years old. Older pipes can be in good condition (and younger ones can be in poor condition), but at the 75 year mark, DC WASA can assume more extensive and frequent inspection is needed. • There are approximately 210 miles of sewers in stream valleys and about 12.3 miles of these sewers were found to need some type of repair. • There are about 364,000 linear feet of sewers with some portion under buildings; of those inspected, a preliminary list was been developed of buildings over sewers found to have multiple and/or significant defects warranting rehabilitation or replacement. Budget Overview and Performance 11-41
- Page 11 and 12: DISTRICT OF COLUMBIA WATER AND SEWE
- Page 13 and 14: . lncrease the rate of main replace
- Page 15 and 16: R AND SEWER SOOO OVERLOOK AVENUE, S
- Page 17 and 18: FY 2010 Budget Major Reductions (¡
- Page 19 and 20: A Strong Track Record of Capital lm
- Page 21 and 22: Budgeting for Performance - Ensurin
- Page 23 and 24: DC WASA successfully completed anot
- Page 25 and 26: High Use Notification Application (
- Page 27 and 28: PCI Standards - DC WASA implemented
- Page 29 and 30: Website Enhancements - Continuing t
- Page 31 and 32: District. In FY 2009, we commenced
- Page 33 and 34: • Water Quality Library, to be de
- Page 35 and 36: services we provide. In FY 2010, we
- Page 37 and 38: Boys Town of Washington, DC - Durin
- Page 39 and 40: CI> E! $25.00 .s::. ••• U ~ $
- Page 41 and 42: This Strategic Plan Critical Succes
- Page 43 and 44: FY 2010 & FY 2011 Operating (In 000
- Page 45 and 46: Overtime History Dollars and Hours
- Page 47 and 48: In FY 2009, we completed a study of
- Page 49 and 50: DC WASA's ten-year capital improvem
- Page 51 and 52: • Local and Minority Business Rev
- Page 53 and 54: target for replacement of non-stand
- Page 55 and 56: DC WASA continues to invest in wate
- Page 57 and 58: Anacostia and Rock Creek Park, and
- Page 59 and 60: modification to the permit reducing
- Page 61: ELECTRICITY PRICING (ALL-IN-COST) $
- Page 65 and 66: • Automated Fuel Tracking - to fa
- Page 67 and 68: (AWWA) verifies that the growing re
- Page 69 and 70: Total Rewards Statements - During F
- Page 71 and 72: People Working Together to Make A D
- Page 73 and 74: DC WASA's contractor lost workday c
- Page 75 and 76: District of Columbia Water and Sewe
- Page 77 and 78: District of Columbia Water and Sewe
- Page 79 and 80: Regional Macro-Economics DC WASlt's
- Page 81 and 82: KEY FACTS There appears to be a dir
- Page 83 and 84: FY 2010 Revised Budget ($ooo's¡ CA
- Page 85 and 86: Comoarative Exoenditures ($000's) F
- Page 87 and 88: ACCOUNTING AND BUDGET PROCESSES Bas
- Page 89 and 90: FY 2O1l Budget Galendar Month Event
- Page 91 and 92: WASA Key Flr,ltr,¡cnl PorlctEs DEB
- Page 93 and 94: Financing and Reserue Policies ln F
- Page 95 and 96: Gustomer Demand and Demographics -
- Page 97 and 98: DCCommercialWater Denund rr. Commer
- Page 99 and 100: and implementation of successful pr
- Page 101 and 102: - DC WASA changed banks on Septembe
- Page 103 and 104: Raúes. The proposed rate and fee a
- Page 105 and 106: The proposed monthly IAC charge for
- Page 107 and 108: under the program by DDOE and to mi
- Page 109 and 110: CSO LTCP Spending by Year 123.3 y4.
- Page 111 and 112: 14. Projected decrease in IAC reven
carbon footprint legislation <strong>and</strong> regulation. At the end of <strong>FY</strong> 2009, <strong>DC</strong> WASA has completed its carbon footprint inventory as a part of<br />
the District of Columbia governmental sector carbon footprint inventory using 2006 as the base year. Additionally, <strong>DC</strong> WASA has<br />
completed its carbon footprint inventories for 2007 <strong>and</strong> 2008, respectively, in compliance with The Climate Registry's General<br />
Reporting Protocol. These inventories will serve as the baseline in establishing carbon footprint reduction goals, a specific Board<br />
strategic critical success factor. The Energy Steering Team provides input into the development of a ten-year energy management<br />
plan <strong>and</strong> will playa vital role in the conduct of <strong>DC</strong> WASA's comprehensive energy audit planned for completion in <strong>FY</strong> <strong>2010</strong>. The<br />
energy audit will provide a technical energy savings analysis of <strong>DC</strong> WASA assets, development of a methodology for measurement<br />
<strong>and</strong> verification of savings projections <strong>and</strong> evaluation of cost/benefit of implementation of recommendations. Additionally, the<br />
Authority will seek <strong>and</strong> analyze opportunities to engage in peak load curtailment <strong>and</strong> load shedding programs through PJM<br />
(Pennsylvania, Jersey <strong>and</strong> Maryl<strong>and</strong>) to reduce cost <strong>and</strong> earn payment for such actions.<br />
During <strong>FY</strong> 2009, <strong>DC</strong> WASA completed a Sewer System Facility assessment. This document culminated a five year effort involving<br />
sewer inspection <strong>and</strong> condition assessment, development of a sewer GIS <strong>and</strong> database, hydraulic monitoring <strong>and</strong> modeling to<br />
assess system capacity <strong>and</strong> the development of a prioritized activities for system improvement. This Sewer System Facility<br />
assessment identified approximately $537 million (lifetime funding) for sewer infrastructure improvements. As recommended in the<br />
assessment, the current CIP includes funds for an ongoing, annual sewer inspection program, which may identify the need for<br />
additional work.<br />
• Generally speaking, major sewer pipe infrastructure can meet current <strong>and</strong> future population needs; however, continued<br />
investment in upgrades to major infrastructure elements is needed.<br />
• 88% of the sewers inspected had some defects, 60% of which could be addressed using localized repair <strong>and</strong> the remaining<br />
require mainly lining.<br />
• 94% of the manholes inspected were found to have one or more defects.<br />
• The number <strong>and</strong> severity of pipe defects indicates an expected increase in problems in pipes greater than 75 years old.<br />
Older pipes can be in good condition (<strong>and</strong> younger ones can be in poor condition), but at the 75 year mark, <strong>DC</strong> WASA can<br />
assume more extensive <strong>and</strong> frequent inspection is needed.<br />
• There are approximately 210 miles of sewers in stream valleys <strong>and</strong> about 12.3 miles of these sewers were found to need<br />
some type of repair.<br />
• There are about 364,000 linear feet of sewers with some portion under buildings; of those inspected, a preliminary list was<br />
been developed of buildings over sewers found to have multiple <strong>and</strong>/or significant defects warranting rehabilitation or<br />
replacement.<br />
Budget Overview <strong>and</strong> Performance<br />
11-41