External Audit - <strong>FY</strong> 2008 marked our twelfth consecutive unqualified audit opinion on our audited financial statements, <strong>and</strong> the<br />

eleventh consecutive year that the Comprehensive Annual Financial Report received the Certificate of Achievement for Excellence in<br />

Financial Reporting from the Government Finance Officers Association (GFOA). We have submitted application for consideration for<br />

a similar award for <strong>FY</strong> 2009. We also received the Distinguished Budget Presentation Award for our <strong>FY</strong> 2009 Budget document.<br />

Cost of Service Study - A Cost of Service Study (COS) was conducted in <strong>FY</strong> 2009 in accordance with <strong>DC</strong> WASA policy. The study<br />

reviewed revenue sufficiency, rate equity, analysis of alternative rate structures <strong>and</strong> miscellaneous charges. While the study<br />

indicated that the existing retail rate structure scored well on most pricing objectives, several recommendations were made that have<br />

been evaluated by <strong>DC</strong> WASA <strong>and</strong> are either included later within this proposal or will be studied further for future recommendations.<br />

Insurance Review - In <strong>FY</strong> 2009, we successfully renewed all of our insurance coverage at essentially the same coverage <strong>and</strong><br />

terms, with slightly higher costs than last year. Our use of multiple, qualified brokers last year improved competition <strong>and</strong> rendered<br />

favorable results in the cost of our property <strong>and</strong> associated insurance coverage. Total insurance costs for the 2009/<strong>2010</strong> insurance<br />

year including the additional terrorism charge <strong>and</strong> all broker fees are 4 percent higher than prior-year actual costs.<br />

Rolling Owner-Controlled Insurance Program II (ROCIP II) - In <strong>FY</strong> 2004 <strong>and</strong> <strong>FY</strong> 2005, we implemented another "industry-best<br />

practice" with our ROCIP program, under which <strong>DC</strong> WASA procures broad insurance coverage for most construction contractors.<br />

The result is substantially higher insurance coverage levels for all contracts; the ability to qualify more small, LSDBE, MBEIWBE<br />

contractors <strong>and</strong> subcontractors who may have trouble obtaining insurance at levels required by <strong>DC</strong> WASA; potential cost savings;<br />

<strong>and</strong> implementation of a uniformly strong safety program for all <strong>DC</strong> WASA contractors. At the end of <strong>FY</strong> 2009, 68 projects, <strong>and</strong> 2<strong>17</strong><br />

contractors had been enrolled in the ROCIP program (including most of the lead service line replacement contracts), <strong>and</strong> preliminary<br />

savings estimates exceed $1 million. As of <strong>FY</strong> 2009, the dollar value for all ROCIP contracts totaled $595 million. Twenty-six of 58<br />

prime contractors are MBE/LSDBE participants. Over the five-year program, <strong>DC</strong> WASA anticipates an estimated savings in the $4 to<br />

$5 million range.<br />

Given the success of the first ROCIP, <strong>DC</strong> WASA moved forward with a second ROCIP beginning October 15,2009. The ROCIP II is<br />

a three year insurance program that will support $1.3 billion of planned construction completion. We anticipate similar results with<br />

this new program.<br />

Internal Audit - During <strong>FY</strong> 2009, Internal Audit Office set out to continue its focus for carrying out of its Annual Audit Plan as<br />

approved by the Board's Audit Committee. The Office completed the following two reviews:<br />

Budget Overview <strong>and</strong> Performance<br />

II - 28