07.01.2015 Views

Hist and Proj Operating Receipts FY 2011 2 17 2010 - DC Water

Hist and Proj Operating Receipts FY 2011 2 17 2010 - DC Water

Hist and Proj Operating Receipts FY 2011 2 17 2010 - DC Water

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

OVERVIEW<br />

<strong>FY</strong> <strong>2010</strong> Major Recommended Activities <strong>and</strong> Changes<br />

• Replace slate roofing for historic building at Fort Reno reservoir<br />

• Roof Replacement for head houses <strong>and</strong> pumping stations<br />

• Design, repair, <strong>and</strong> replace glass atrium at Central Maintenance Facilities<br />

• Upgrade bathrooms in the Central Maintenance Facilities to ensure ADA compliance<br />

• Heating, Ventilating, <strong>and</strong> Air Conditioning (HVAC) coil replacement of the Central Operation Facility<br />

<strong>FY</strong> <strong>2011</strong> Major Recommended<br />

• Paint the Central Operation Facility<br />

• Upgrade warehouse at Blue Plains<br />

Activities <strong>and</strong> Changes<br />

Impact of Capital <strong>Proj</strong>ects on <strong>FY</strong> <strong>2010</strong> <strong>and</strong> <strong>FY</strong> <strong>2011</strong> <strong>Operating</strong><br />

Expenditures<br />

• Ongoing maintenance costs for all major activities are anticipated to be reduced<br />

• Energy <strong>and</strong> operational cost savings will be realized by the glass atrium <strong>and</strong> HVAC coil replacement

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!