07.01.2015 Views

Hist and Proj Operating Receipts FY 2011 2 17 2010 - DC Water

Hist and Proj Operating Receipts FY 2011 2 17 2010 - DC Water

Hist and Proj Operating Receipts FY 2011 2 17 2010 - DC Water

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CHIEF ENGINEER<br />

Deputy General<br />

Manager<br />

I<br />

POSITIONS<br />

CURRENT<br />

Average Year-End<br />

Positions Positions<br />

Authorized Filled Filled <strong>FY</strong> <strong>2010</strong> <strong>FY</strong> <strong>2011</strong><br />

3 3<br />

<strong>FY</strong> <strong>2011</strong> Budget<br />

$704,000<br />

PERMIT<br />

OPERATIONS<br />

3 - Positions<br />

• Manage <strong>DC</strong> WASA's permit functions<br />

• Perform engineering review of major development<br />

projects from conception to construction<br />

• Coordinate with <strong>DC</strong>RA in support of the District's<br />

permit operations<br />

• Collaborate with DETS on modifications to the<br />

Authority's design st<strong>and</strong>ards<br />

• Review <strong>and</strong> approve water <strong>and</strong> sewer availability<br />

certificates<br />

• Coordinate construction with DETS <strong>Water</strong> <strong>and</strong><br />

Sewer Construction Branch

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!