OVERVIEW<br />

<strong>FY</strong> <strong>2010</strong> Major Recommended Activities <strong>and</strong> Changes<br />

• Continue design <strong>and</strong> implementation of the 20 year Combined Sewer Overflow - Long Term Control Plan (CSO LTCP)<br />

• Develop Blue Plains Tunnel design report for use by design-build team<br />

• Complete design <strong>and</strong> begin construction of the Blue Plains tunnel site preparation at the Blue Plains facility<br />

• Secure engineering <strong>and</strong> construction services for the Blue Plains tunnel through design-build service delivery<br />

• Begin design of new CSO 19 outfall structure near RFK stadium that will h<strong>and</strong>le excess flow from the new Northeast<br />

Boundary Tunnel<br />

• Develop design-build procurement procedures <strong>and</strong> qualifications protocol for <strong>DC</strong> WASA projects<br />

• Develop <strong>and</strong> make recommendation for risk allocation for design-build contracts<br />

• Begin design of CSO at M Street near the Navy Yard area <strong>and</strong> Southside of the Anacostia River<br />

<strong>FY</strong> <strong>2011</strong> Major Recommended Activities <strong>and</strong> Changes<br />

• Continue design <strong>and</strong> implementation of the 20 year CSO LTCP<br />

• Complete construction of the Blue Plains Tunnel Site Preparation project at the Blue Plains facility<br />

• Begin construction of the Blue Plains tunnel that is approximately 4 miles long <strong>and</strong> 23 feet inside diameter. The tunnel will<br />

extend from Blue Plains Wastewater Treatment Facility to the Main Street Pumping Station near the Washington Nationals<br />

Stadium<br />

• Secure engineering <strong>and</strong> construction services for the Blue Plains Tunnel through design-build service delivery<br />

• Complete design for new CSO 19 outfall structure near RFK stadium to h<strong>and</strong>le excess flow from the new North East<br />

Boundary Tunnel<br />

• Complete design of CSO at M Street near the Navy Yard area <strong>and</strong> Southside of the Anacostia River