07.01.2015 Views

Hist and Proj Operating Receipts FY 2011 2 17 2010 - DC Water

Hist and Proj Operating Receipts FY 2011 2 17 2010 - DC Water

Hist and Proj Operating Receipts FY 2011 2 17 2010 - DC Water

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

CHIEF ENGINEER<br />

Deputy General<br />

Manager<br />

I<br />

Authorized<br />

CURR ENT<br />

Average<br />

Positions<br />

Filled<br />

Year-End<br />

Positions<br />

Filled<br />

1<br />

<strong>FY</strong> <strong>2011</strong> Budget<br />

$583,000<br />

I<br />

CSO LONG TERM<br />

CONTROL PLAN<br />

2 - Positions<br />

I<br />

CSO Planning <strong>and</strong><br />

Design Branch<br />

CSO Construction<br />

Branch<br />

5 - Position ~--<br />

..<br />

• Management <strong>and</strong> oversight of the planning <strong>and</strong> design<br />

phase of the $2.4 billion, 20 year, CSO LTCP<br />

• Oversee the program consultants' management of design<br />

contracts, consent decree driven schedules, budgets <strong>and</strong><br />

program planning<br />

• Ensure adherence to all design related consent decree<br />

milestones<br />

• Oversee <strong>and</strong> guide value engineering efforts to improve<br />

the quality <strong>and</strong> cost effectiveness of designs<br />

• Coordinate the interaction between the CSO LTCP<br />

Department <strong>and</strong> other departments within <strong>DC</strong> WASA<br />

• Review, oversee <strong>and</strong> ensure compliance with quality<br />

assurance/quality control procedures<br />

• Develop risk mitigation strategies for all CSO LTCP projects,<br />

with emphasis on bringing quality projects online, on time<br />

<strong>and</strong> within budget<br />

• Manage <strong>and</strong> oversee the construction phase of the 20 year, CSO LTCP<br />

• Ensure adherence to all construction related consent decree requirements<br />

• Guide constructability review efforts<br />

• Identify <strong>and</strong> mitigate potential sources of project delay <strong>and</strong> scope growth<br />

• Develop risk mitigation strategies for all CSO LTCP projects<br />

• Inspect tunnel construction <strong>and</strong> other CSO abatement facilities<br />

• Review, oversee <strong>and</strong> ensure compliance with quality assurance/quality control<br />

procedures

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!