OVERVIEW<br />

<strong>FY</strong> <strong>2010</strong> Major Recommended<br />

Activities <strong>and</strong> Changes<br />

• Lead, manage timely, <strong>and</strong> ensure in-budget implementation of the Capital Improvement Program (CIP)<br />

• Continue development of Engineering St<strong>and</strong>ards<br />

• Continue High Priority Rehabilitation Program for Blue Plains<br />

• Continue development of St<strong>and</strong>ard <strong>Operating</strong> Procedures (SOP's)<br />

• Continue design of Total Nitrogen (TN) project at Blue Plains<br />

• Continue design of Biosolids Management Plan projects<br />

• Implement in-house management of the Geographic Information System (GIS)<br />

• Begin implementation of increased design capability in-house<br />

• Develop terms <strong>and</strong> conditions for Design-Build contracts<br />

• Implement upgraded project portfolio management system<br />

• Ensure EPA Fair Share Objectives are met or exceeded<br />

• Submit <strong>DC</strong> WASA's availability analysis to EPA for determination of Fair Share Objectives for <strong>FY</strong> <strong>2010</strong> through <strong>FY</strong> 2013<br />

• Ensure all grant funding is obligated in accordance with grant requirements<br />

• Meet all required ARRA (Stimulus) project requirements<br />

<strong>FY</strong> <strong>2011</strong> Major Recommended<br />

Activities <strong>and</strong> Changes<br />

• Continue to lead, manage timely, <strong>and</strong> ensure in-budget implementation of the CIP<br />

• Maintain as-built <strong>and</strong> mapping system with in-house staff<br />

• Begin implementation of the projects resulting from the sewer system condition assessment program.<br />

• Continue implementation of TN project at Blue Plains<br />

• Continue implementation of Biosolids Management Plan projects<br />

• Continue to grow in-house design capability<br />

Impact of Capital <strong>Proj</strong>ects on <strong>FY</strong> <strong>2010</strong> <strong>and</strong> <strong>FY</strong> <strong>2011</strong> <strong>Operating</strong> Expenditures<br />

• Additional staffing to support the $3.8 billion CIP for <strong>FY</strong> 2009 - 2018