CAPITAL AUTHORITY<br />

As part of <strong>DC</strong> WASA's enabling legislation, Congressional appropriation authority is required before any capital design or<br />

construction contract can be entered into. The <strong>FY</strong> <strong>2011</strong> request totals $382.3 million, <strong>and</strong> reflects the following:<br />

. Remaining authority from prior years' appropriations;<br />

. <strong>Proj</strong>ected commitments in <strong>FY</strong> <strong>2010</strong> <strong>and</strong> <strong>FY</strong> <strong>2011</strong>;<br />

' Planned <strong>FY</strong> 2012 <strong>and</strong> <strong>FY</strong> 2013 commitments, to ensure adequate authority exists, in the event that any projects are<br />

accelerated.<br />

Due to the timing of the Congressional appropriations process, authority requests must be made well in advance of commitment<br />

execution. Including projected <strong>FY</strong> 2012 <strong>and</strong> <strong>FY</strong> 2013 commitments (a 24-month 'look ahead') allows us adequate flexibility to<br />

continue with contract commitments in the event that the U.S Congress delays budget approval <strong>and</strong> allows us to quickly accelerate<br />

or reprioritize projects into earlier years as approved by the Board. While this gives us flexibility to reprioritize projects, it should be<br />

noted that such changes <strong>and</strong> execution of any contract still require General Manager's approval, with major projects <strong>and</strong> contracts<br />

requiring Board approval.<br />

MAJOR ASSUMPTIONS<br />

lnflation: All project costs are typically inflated at three percent annually to the mid-point of construction.<br />

Gontingency: <strong>DC</strong> WASA capital projects include project contingencies ranging from five. to fifteen percent, based on the size of the<br />

project.<br />

PROJECT PAGES<br />

This document contains individual sections for each of <strong>DC</strong> WASA's seven service areas. Each service area is made up of specific<br />

projects. Within each service area section in this document, there are individual project sheets for each current capital project in that<br />

section. The capital project sheets contain general information for each project. The following information is included:<br />

Service Area Title - currently, there are seven defined project service areas in <strong>DC</strong> WASA's ClP. The seven service areas<br />

include: Wastewater Treatment, Combined Sewer OverflodLTCP, Stormwater, Sanitary Sewer, <strong>Water</strong>, Washington<br />

Aqueduct <strong>and</strong> Capital Equipment. The service area categorization groups together similar projects based on facility location<br />

<strong>and</strong> type of work being done in the project. Congressional capital authority is requested at this level.<br />

vl -10