more w¡dely disposed of at reduced costs; reduction in the carbon footprint of the existing lime stabilization process; <strong>and</strong>, the<br />

production of an estimated 1OMW of power that can be utilized on site. The reduced costs associated with this project should help<br />

provide some of the necessary long term funding needed for the improvements to the sewer <strong>and</strong> water infrastructure identified by the<br />

respective facility plans.<br />

Other long-term upgrade projects now under construction include:<br />

' Nitrification-Denitrification Facilities Upgrade - to upgrade the process <strong>and</strong>/or replace equipment that are at the end of their<br />

useful lives.<br />

' Raw Wastewater Pump Station 1 - Upgrade to the Raw Wastewater Pump Station to replace equipments that are at the end<br />

of their useful lives, <strong>and</strong> improve reliability.<br />

' Process Control System - will provide automated monitoring <strong>and</strong> control for the nitrification-denitrification process that will<br />

improve treatment, control <strong>and</strong> optimize chemical <strong>and</strong> power costs, <strong>and</strong> increase reliability of the facilities.<br />

' Biological Sludge Thickening Facilities- will upgrade the existing dissolved air floatation thickening units to restore integrity to<br />

this system <strong>and</strong> reduce sludge processing <strong>and</strong> chemical costs through improved efficiency.<br />

COMBINED SEWER<br />

The lifetime budget for the Combined Sewer Service Overflow (CSO) Service Area is $2.7 billion, which includes the twenty-year<br />

CSO Long Term Control Plan (CSO-LTCP). The benefits of this plan are significant. When fully implemented, combined sewer<br />

overflows will be reduced by a projected 96 percent (98 percent on the Anacostia River), resulting in improved water quality. The<br />

more than $400 million increase to this service area's lifetime budget is attributable to two items. First, $300 million related to the<br />

following: updated costs estimates of the recently completed facility plan of the project <strong>and</strong> transfer of certain projects from the Blue<br />

Plains Total Nitrogen program under the Wastewater service area; <strong>and</strong>, second approximately $100 million associated with the<br />

Northeast Boundary Sewer <strong>Proj</strong>ect ($18.Smillion), Tiber Creek Sewer Lining <strong>Proj</strong>ect ($16.5 million) <strong>and</strong> an increase in the costs for<br />

the Combined Sewers Under Buildings ($60.t million). The latter are projects recommended under the sewer facility plan <strong>and</strong> not<br />

related to the CSO-LTCP.<br />

It should be noted that additional risks <strong>and</strong> contingencies associated with the twenty-year LTCP program exist <strong>and</strong> will be evaluated<br />

over time. Given the long timeframe of this project <strong>and</strong> the uncertainties associated with tunneling projects, we will continue to<br />

monitor the costs <strong>and</strong> risks with the expectation of updating the projections when certain milestones have been reached. We have<br />

recommended the cunent change to the program budget based upon completion of one of the major milestones - the facilities plan<br />

for the Anacostia Tunnel. There will be similar milestones for the other portions of the CSO-LTCP in future years that will provide<br />

information that may require re-evaluation of future risks <strong>and</strong> costs associated with this project.<br />