Hist and Proj Operating Receipts FY 2011 2 17 2010 - DC Water

Hist and Proj Operating Receipts FY 2011 2 17 2010 - DC Water Hist and Proj Operating Receipts FY 2011 2 17 2010 - DC Water

07.01.2015 Views

RECENT & PROPOSED RATE & FEE CHANGES, cont. AVERAGE CAP CUSTOMER MONTHLY BILL FY2008 FY2009 FY2010 FY 2011 DC WASA Retail Rates (1) DC WASA IAC 35.93 37.53 - 1.24 40.94 2.20 46.09 3.45 DC WASA Customer Fee 2.01 2.01 2.01 3.86 Subtotal DC WASA Rates & Gharges $ 37.94 $ 40.78 $ 45.15 $ 53.40 lncrease / Decrease $ 1.88 $ 2.84 $ 4.37 $ 8.25 Percent lncrease in DG WASA Portion of Bill 5.2% 7.5% 10.7o/o 18.3o/o Districtof Columbia PILOT (1) $ 2.27 $ 2.61 $ 2.87 $ 3.28 Districtof Columbia Rightof Way Fee (1) $ 0.87 $ 0.87 $ 0.94 $ 0.94 District of Columbia Stormwater Fee Subtotal District of Columbia Charges $ 0.s8 3.72 $ 2.57 6.05 $ 2,57 6.38 $ 2.57 6.79 TotalAmount $ 41.66 $ 46.83 $ 51.53 $ 60.19 Less: CAP Discount (4 Ccf per month) (2), (3) (8.56) (22.44) (24.48) (30.08) Total AmountAppearing on DC WASA B¡ll 33.10 24.39 27.O5 30.1I lncrease / Decrease Over Prior Year GAP Customer Discount as a Percent of Total Bill (1) (2) (3) Assumes average monthly consumption of 6.69 Ccl or 5,004 gallons Extension of CAP program to first 4 Ccf of sewer services became effective in FY 2009 ln FY 2011 Board approved extension of CAP program to first 4 CcÍ ot PILOT and ROW in FY 2011 v-9

Fy20,0 RArE-:::il:=: PR,P'SED RA'E & FEE 'HANGES' cont' Effective October 2009 the Board increased rates and fees as follows: . Water and Sewer consumption rate increased by 9o/o. Water rate increase by $0.21 per Ccf from $2.30 per Ccf to $2.51 per Ccf Sewer rate increased by $0.30 per Ccf from $3.31 per Ccf to $3.61 per Ccf Monthly lmpervious Area Surface Charge increased by $0.96 from $1 .24 per ERU to $2.20 per ERU . Right of Way and PILOT fee - These fees increased to recover the full cost of the Right of Way and PILOT fees charged to DC WASA by the District of Columbia. lncrease of 9.6 percent in the Right of Way and PILOT fees: 10.3 percent PILOT &7.7 percent for ROW. . These changes increased the typical residential customer's total monthly bill by $4.70 or 10.0 percent. PROPOSED FY 2011 RATE & FEE CHANGES f ncluded in FY 2011 rateproposal is a planned implementation of a multi-tier rate structure as shown in the table below. Range fotal Monthly billwith I ERU fotal lllonthly ¡illwith :iered ERU Difference lompared lo I ERU rnethod 100 - 600 sq ft = 0.6 ERU 860.19 È57.78 È-2.41 200 - 2,000 = 1.0 ERU 860.19 860.19 80.00 2.100 - 3.000 = 2.4 ERU 060.19 F68.62 t8.43 1,100 - 7,000 = 3.8 ERU 860.19 È77.05 016.86 7,100 - 11,000 = 8.6 ERU E60.19 8105.94 È45.75 11,100 and more = 13.5 ERU 060.19 È135.44 i75.25 v- l0

Fy20,0 RArE-:::il:=:<br />

PR,P'SED RA'E & FEE<br />

'HANGES'<br />

cont'<br />

Effective October 2009 the Board increased rates <strong>and</strong> fees as follows:<br />

. <strong>Water</strong> <strong>and</strong> Sewer consumption rate increased by 9o/o.<br />

<strong>Water</strong> rate increase by $0.21 per Ccf from $2.30 per Ccf to $2.51 per Ccf<br />

Sewer rate increased by $0.30 per Ccf from $3.31 per Ccf to $3.61 per Ccf<br />

Monthly lmpervious Area Surface Charge increased by $0.96 from $1 .24 per ERU to $2.20 per ERU<br />

. Right of Way <strong>and</strong> PILOT fee - These fees increased to recover the full cost of the Right of Way <strong>and</strong> PILOT fees<br />

charged to <strong>DC</strong> WASA by the District of Columbia.<br />

lncrease of 9.6 percent in the Right of Way <strong>and</strong> PILOT fees: 10.3 percent PILOT &7.7 percent for ROW.<br />

. These changes increased the typical residential customer's total monthly bill by $4.70 or 10.0 percent.<br />

PROPOSED <strong>FY</strong> <strong>2011</strong> RATE & FEE CHANGES<br />

f ncluded in <strong>FY</strong> <strong>2011</strong> rateproposal is a planned implementation of a multi-tier rate structure as shown in the table below.<br />

Range<br />

fotal<br />

Monthly<br />

billwith I<br />

ERU<br />

fotal<br />

lllonthly<br />

¡illwith<br />

:iered ERU<br />

Difference<br />

lompared<br />

lo I ERU<br />

rnethod<br />

100 - 600 sq ft = 0.6 ERU 860.19 È57.78 È-2.41<br />

200 - 2,000 = 1.0 ERU 860.19 860.19 80.00<br />

2.100 - 3.000 = 2.4 ERU 060.19 F68.62 t8.43<br />

1,100 - 7,000 = 3.8 ERU 860.19 È77.05 016.86<br />

7,100 - 11,000 = 8.6 ERU E60.19 8105.94 È45.75<br />

11,100 <strong>and</strong> more = 13.5 ERU 060.19 È135.44 i75.25<br />

v- l0

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!