Fuel Distribution System NATURAL GAS T.R.T STEEL MAKING PLANT GAS HOLDER BFG BFG FLARE 1, 2 , 3 and 4 BFG BLAST FURNACE 1 , 2 and 3 LDG GAS HOLDER LDG NG DISTRIBUTION STATION NG T 66 MW VAPOR (26 t/h) G 72 MVA 72 MVA S CALCINAÇÃO 1 e 2 TORPEDO CAR TAR STORAGE T 66 MW G 72 MVA S VAPOR (26 t/h) HSM SALES T 68 MW VAPOR (50 t/h) G 80 MVA IRON CASTING MACHINE T 68 MW G 80 MVA Futuro BRIQUET PLANT VAPOR (50 t/h) COKE PLANT TAR COG FLARE COG GAS HOLDER SINTER PLANT GAS MIXER STATION SHOP FOUDRI, PCI,RH COG COG STEAM 05/10/2008 35 MG PLANT
Fuel Recovery Index Gas Fuel is produced at Coke Plant, Blast Furnace and Steel Making Plant. Recovery all that Energy is our target to have a high productivity and low costs. Fuel Recovery Index (%) Foreseen Accomplished The Fuel Recovery Index has reduced in middle 2007 due to new energy fuel sources after the 7,5 Mt/y start up (new Blast Furnace and Steel Converter). It is foreseen that in begin of 2009 after the new Hot Strip Mill furnace start up this index to be recovered to values above 95%. 05/10/2008 36
- Page 1 and 2: Challenges for Sustainable Ironmaki
- Page 3 and 4: The inside cover - Not in this mill
- Page 5 and 6: Outline • Ironmaking at ArcelorMi
- Page 7 and 8: Global Iron and Steel Production Tr
- Page 9 and 10: Ironmaking facilities are “integr
- Page 11 and 12: Eqv Coke Rate kg/thm Equivalent Cok
- Page 13 and 14: 700 80 600 70 500 60 Effective Grat
- Page 15 and 16: And highly vertically integrated 05
- Page 17 and 18: • Ironmaking at ArcelorMittal An
- Page 19 and 20: Sustainability Challenges 05/10/200
- Page 21 and 22: Sustainability A vertical vision, i
- Page 23 and 24: Three Axes of Action 05/10/2008 22
- Page 25 and 26: Knowledge Organization To move glob
- Page 27 and 28: Knowledge Organization Increase our
- Page 29 and 30: Knowledge Organization Increase our
- Page 31 and 32: Energy / Environment IH No. 7 Blast
- Page 33 and 34: Energy / Environment A process - pr
- Page 35: ArcelorMittal Tubarão Energy Model
- Page 39 and 40: Profit / Innovation 05/10/2008 38
- Page 41 and 42: Profit /Innovation Asset Longevity
- Page 43 and 44: Tubarao No. 1 BF Equipment Control
- Page 45 and 46: Tubarao No. 1 BF BF - SHELL DEGRADA
- Page 47 and 48: Tubarao No. 1 BF Total Fuel Rate (n
- Page 49 and 50: Profit /Innovation Design tools for
- Page 51 and 52: Profit /Innovation Know your proces
- Page 53 and 54: Profit /Innovation Know your proces
- Page 55 and 56: Profit /Innovation Push the limits
- Page 57 and 58: Profit /Innovation Push the Limits
- Page 59 and 60: Profit /Innovation Improve Value-in
- Page 61 and 62: Profit /Innovation Enhanced use of
- Page 63 and 64: Lisakovsky de-P flowsheet Gravity M
- Page 65 and 66: Profit /Innovation Use lower cost r
- Page 67 and 68: Concluding Remarks The New Cover -
- Page 69 and 70: The Ironmaking plant - Innovation a
Fuel Recovery Index<br />
Gas Fuel is produced <strong>at</strong> Coke Plant, Blast Furnace and Steel Making Plant.<br />
Recovery all th<strong>at</strong> Energy is our target to have a high productivity and low costs.<br />
Fuel Recovery Index (%)<br />
Foreseen<br />
Accomplished<br />
The Fuel Recovery Index has reduced in middle 2007 due to new energy fuel sources after the 7,5 Mt/y<br />
start up (new Blast Furnace and Steel Converter). It is <strong>for</strong>eseen th<strong>at</strong> in begin of 2009 after the new Hot<br />
Strip Mill furnace start up this index to be recovered to values above 95%.<br />