Challenges for Sustainable Ironmaking at ArcelorMittal - ABM

Challenges for Sustainable Ironmaking at ArcelorMittal - ABM Challenges for Sustainable Ironmaking at ArcelorMittal - ABM

abmbrasil.com.br
from abmbrasil.com.br More from this publisher
06.01.2015 Views

Production via the “oxide route” - 2007 100 Number 80 60 40 32,1 Mt 90,5 Mt 82,5 Mt 96.5Mt 20 9,9 Mt 0 coke plant sinter plant blast furnace DRI Steel 05/10/2008 9

Eqv Coke Rate kg/thm Equivalent Coke Ratekg/t 900 850 800 750 700 650 600 550 500 3.5 2.5 1.5 Productivity Prod. t/m3/d 450 Work. Vol., m3 400 5 , 0 0 0 4 , 0 0 0 3 , 0 0 0 2 , 0 0 0 1 , 0 0 0 0 0.5 05/10/2008 10

Eqv Coke R<strong>at</strong>e kg/thm<br />

Equivalent Coke R<strong>at</strong>ekg/t<br />

900<br />

850<br />

800<br />

750<br />

700<br />

650<br />

600<br />

550<br />

500<br />

3.5<br />

2.5<br />

1.5<br />

Productivity Prod. t/m3/d<br />

450<br />

Work. Vol., m3<br />

400 5 , 0 0 0<br />

4 , 0 0 0<br />

3 , 0 0 0<br />

2 , 0 0 0<br />

1 , 0 0 0<br />

0<br />

0.5<br />

05/10/2008 10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!