06.01.2015 Views

site vicinity map site development plan perspective - UP Baguio

site vicinity map site development plan perspective - UP Baguio

site vicinity map site development plan perspective - UP Baguio

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

G<br />

---<br />

A<br />

A107<br />

A<br />

B<br />

13,218 19,828<br />

1<br />

SETOUT POINT<br />

<strong>UP</strong><br />

E<br />

A107<br />

2<br />

3<br />

4<br />

8,986<br />

8,936 2,979 2,979 3,029<br />

GALERYA (EXISTING )<br />

508,360<br />

2,100<br />

510,700<br />

510,550<br />

510,700<br />

<strong>UP</strong><br />

510,700<br />

3<br />

1 A104<br />

2<br />

CHB1<br />

<strong>UP</strong><br />

GALLERY 2<br />

507,070<br />

1,305 2,099 2,099 7,190<br />

SW2<br />

1,949<br />

1,849<br />

2,199<br />

SW1<br />

10,896<br />

SW2<br />

RW4<br />

RW5<br />

RW5<br />

B<br />

A106<br />

RW5<br />

C<br />

A106<br />

SHAFT OPENING<br />

5<br />

D<br />

A106<br />

4,000<br />

SW2<br />

510,700<br />

FL - 01<br />

GALLERY ENTRANCE<br />

LOBBY<br />

510,470<br />

FL - 01<br />

CAFETERIA<br />

RW5<br />

8<br />

RAMP <strong>UP</strong><br />

510,650<br />

510,370<br />

RAMP <strong>UP</strong><br />

5,449<br />

1,000 160<br />

2,100<br />

510,370 510,370<br />

6<br />

2056<br />

2909<br />

510,370<br />

RAMP <strong>UP</strong><br />

510,220<br />

3762<br />

510,272<br />

4614<br />

5467<br />

2,000<br />

<strong>UP</strong><br />

510,320<br />

FL - 01<br />

1<br />

510,370<br />

A105<br />

THEATER (EXISTING )<br />

510,370<br />

510,470<br />

6,609 13,218 6,609 6,609<br />

33,046<br />

A<br />

A' D E F<br />

1<br />

A102<br />

MUSEUM SECOND BASEMENT FLOOR PLAN<br />

1 : 100<br />

0 5<br />

10 M<br />

PROJECT NO.<br />

PROJECT TITLE<br />

DATE REVISION DESCRIPTION OWNER SHEET CONTENTS SHEET NUMBER<br />

PRC NO:<br />

PTR NO:<br />

PLACE:<br />

ARISTOTLE MARC J. GO<br />

ARCHITECT<br />

TIN NO:<br />

DATE:<br />

PRC NO:<br />

PTR NO:<br />

PLACE:<br />

TIN NO:<br />

DATE:<br />

CHECKED BY<br />

0000 RENOVATION/REPAIR OF AUDITORIUM &<br />

SECOND BASEMENT LEVEL PLAN<br />

UNIVERSITY OF THE<br />

EXTENSION & REPAINTING OF GALERYA<br />

PHILIPPINES BAGUIO<br />

KORDILYERA<br />

Checker<br />

LOCATION<br />

GOVERNMENT CENTER ROAD, BAGUIO CITY<br />

13/11/2012 08:06:23<br />

SCALE :<br />

1 : 100<br />

@ A1<br />

A102<br />

13/11/2012 08:06:23<br />

THIS DOCUMENT IS THE COPYRIGHT OF 90 DESIGN STUDIO. ALL DIMENSIONS AND SITE CONDITIONS TO BE VERIFIED ON SITE PRIOR TO COMMENCEMENT OF ANY WORK OR PREPARATION OF SHOP DRAWINGS AND/OR THE FABRICATION OF ANY<br />

COMPONENTS. SHOULD THERE BE ANY DISCREPANCIES REFER TO ARCHITECT PRIOR TO COMMENCEMENT OF THE WORK. DO NOT SCALE DRAWINGS - REFER TO FIGURED DIMENSIONS ONLY. DRAWINGS TO BE READ IN CONJUNCTION WITH RELEVENT<br />

DOCUMENTATION FROM ENGINEER AND OTHER SPECIALIST SUB CONSULTANTS. THIS DOCUMENT DESCRIBES THE DESIGN INTENT, DESIGN DETAILS AND / OR FINISHES, SIZES AND RELATIONSHIPS OF ROOMS, BUILDING ENVELOPE AND ARCHITECTURAL<br />

EXPRESSION.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!