Final Report, SONS Deepwater Horizon Oil Spill, Gulf of Mexico, 27 April — 24 September 2010 ready for tasking by the USCG. All the teams conducted training and drills. The spud barge, with two Class V Vessel Skimmers on board in Gulfport, was re-positioned near Cat Island. Two Class V Skimmer Systems were on a barge at Rigolets in Slidell for better positioning to protect the entrances to Lake Ponchartrain. Oil Containment Boom and Boom Mooring Systems removal operations were in progress at Mobile Bay. The OSV Wes Bordelon (in Venice) deployed 3000′ of USS-26″ Oil Containment Boom and Boom Mooring Systems at the North Pass. The Grand Isle SUPSALV onshore crew deployed another 1000′ of USS-26″ Oil Containment Boom near-shore at the bridge to Grand Isle. The OSV AHTS Vanguard, equipped two Current Buster VOSS onsite at MC252, recovered 1908 barrels of product total cumulative to date. There was a reduction in recovered product after decanting or stripping 337 barrels of water, which reflected a first-rate estimated recovery efficiency of 83 percent. ICP Houma requested the loading of two High Speed Current Buster VOSS and one Class XI Skimmer onto three separate vessels of opportunity (VOO). SUPSALV advised ICP Houma that the two High Speed Current Buster VOSS would be more effective on a single larger VOO with internal tanks, same configuration used on board the OSV AHTS Vanguard. This configuration primarily eliminated the requirement to pump recovered oil into a Spill Recovery Bladder, and then manage offloading to larger capacity barges (double handling). ICP Houma operations understood this, but priorities were driving multiple smaller vessels skimming with SUPSALV equipment. Eventually ICP Houma agreed, and two High Speed Skimmers were loaded on the OSV MV John Coghill and a different OSV would be provided for the Class XI System. Sunday, 23 May 2010 Having continued coordinating authority over the majority of SUPSALV OSR equipment, the Federal Reserve Asset Staging Unit in Gulfport (State Pier West) anticipated additional positioning per the USCG FOSC direction. Indications were that most, if not all, Class V Skimmer Systems awaiting assignment in Gulfport would be directed to Louisiana. Twelve Class V Vessel Skimmers with full crews were still pre-positioned as follows: Rigolets (qty 4), Cat Island (qty 2), Pascagoula (qty 2), Bayou La Batre (qty 1), and Pensacola (qty 1), all ready for tasking by the USCG. The teams conducted training and drills. SUPSALV Oil Containment Boom and Boom Mooring removal operations were in progress at Mobile Bay. The OSV Wes Bordelon left Venice and deployed 2000′ of USS-26″ Oil Containment Boom with Boom Mooring Systems at the North Pass for a total of 5000′ of Oil Containment Boom in that location. 24
Final Report, SONS Deepwater Horizon Oil Spill, Gulf of Mexico, 27 April — 24 September 2010 GPC personnel onshore in Grand Isle continued to support near-shore oil recovery and protection. The OSV AHTS Vanguard, operating two High Speed Current Buster VOSS, was onsite at MC252. The AHTS Vanguard offloaded recovered product onto a barge. Note: Total oil recovered to date was 3031 barrels. The OSV MV John Coghill completed recovery of the Oil Containment Boom and Boom Mooring Systems at Mobile Bay. The OSV MV John Coghill arrived at Gulfport to begin installation of two Current Buster VOSS Skimming Systems. Monday, 24 May 2010 With continued coordination authority over the bulk of SUPSALV OSR equipment assets, the Federal Reserve Asset Staging Unit in Gulfport (State Pier West) anticipated additional positioning per the USCG FOSC direction. Preparations were made to move six Class V Skimmer Systems (with support equipment) from the Gulfport staging area, along with all USS- 42″ Oil Containment Boom from Amelia staging area, to the Port Fourchon/Grand Isle area. The move took several days. The two Class V Vessel Skimmers arrive from Alaska. All SUPSALV Oil Containment Boom recovered from Mobile Bay was sent to Gulfport to be refurbished. The OSV Wes Bordelon (in Venice) loaded USS-42″ Oil Containment Boom. The target area was not identified at the time of this boom deployment. GPC personnel onshore in Grand Isle continued to support near-shore recovery. The OSV AHTS Vanguard, equipped with two High Speed Current Buster VOSS, moved to the barge collection area and offloaded mud tanks. The OSV AHTS Vanguard got underway to MC252 to redeploy both VOSS and continued skimming operations. The OSV MV John Coghill began loading two Current Buster VOSS Skimming Systems while pierside in Gulfport. A Sea Scout Program vessel (OSV Gulf Scout), in port at Gulfport, was assigned to receive the Class XI VOSS. 25
- Page 46 and 47: Chapter 5: Operations Figure 5-14.
- Page 48 and 49: Chapter 5: Operations Ship Island,
- Page 50 and 51: Chapter 5: Operations used alternat
- Page 52 and 53: Chapter 5: Operations Remotely Oper
- Page 54 and 55: Chapter 5: Operations 5-6.2 Evidenc
- Page 56 and 57: Chapter 5: Operations Figure 5-21.
- Page 59 and 60: Deepwater Horizon Oil Spill Respons
- Page 61 and 62: Deepwater Horizon Oil Spill Respons
- Page 63: Deepwater Horizon Oil Spill Respons
- Page 66 and 67: Chapter 7: Lessons Learned • MARC
- Page 68 and 69: Chapter 7: Lessons Learned unaware
- Page 70 and 71: Final Report, SONS Deepwater Horizo
- Page 72 and 73: Final Report, SONS Deepwater Horizo
- Page 74 and 75: Final Report, SONS Deepwater Horizo
- Page 76 and 77: Final Report, SONS Deepwater Horizo
- Page 78 and 79: Final Report, SONS Deepwater Horizo
- Page 80 and 81: Final Report, SONS Deepwater Horizo
- Page 82 and 83: Final Report, SONS Deepwater Horizo
- Page 84 and 85: Final Report, SONS Deepwater Horizo
- Page 86 and 87: Final Report, SONS Deepwater Horizo
- Page 88 and 89: Final Report, SONS Deepwater Horizo
- Page 90 and 91: Final Report, SONS Deepwater Horizo
- Page 92 and 93: Final Report, SONS Deepwater Horizo
- Page 94 and 95: Final Report, SONS Deepwater Horizo
- Page 98 and 99: Final Report, SONS Deepwater Horizo
- Page 100 and 101: Final Report, SONS Deepwater Horizo
- Page 102 and 103: Final Report, SONS Deepwater Horizo
- Page 104 and 105: Final Report, SONS Deepwater Horizo
- Page 106 and 107: Final Report, SONS Deepwater Horizo
- Page 108 and 109: Final Report, SONS Deepwater Horizo
- Page 110 and 111: Final Report, SONS Deepwater Horizo
- Page 112 and 113: Final Report, SONS Deepwater Horizo
- Page 114 and 115: Final Report, SONS Deepwater Horizo
- Page 116 and 117: Final Report, SONS Deepwater Horizo
- Page 118 and 119: Final Report, SONS Deepwater Horizo
- Page 120 and 121: Final Report, SONS Deepwater Horizo
- Page 122 and 123: Final Report, SONS Deepwater Horizo
- Page 124 and 125: Final Report, SONS Deepwater Horizo
- Page 126 and 127: Final Report, SONS Deepwater Horizo
- Page 128 and 129: Final Report, SONS Deepwater Horizo
- Page 130 and 131: Final Report, SONS Deepwater Horizo
- Page 132 and 133: Final Report, SONS Deepwater Horizo
- Page 134 and 135: Final Report, SONS Deepwater Horizo
- Page 136 and 137: Final Report, SONS Deepwater Horizo
- Page 138 and 139: Final Report, SONS Deepwater Horizo
- Page 140 and 141: Final Report, SONS Deepwater Horizo
- Page 142 and 143: Final Report, SONS Deepwater Horizo
- Page 144 and 145: Final Report, SONS Deepwater Horizo
Final Report, SONS Deepwater Horizon Oil Spill, Gulf of Mexico, 27 April — 24 September 2010<br />
GPC personnel onshore in Grand Isle continued to support near-shore oil recovery and<br />
protection.<br />
The OSV AHTS Vanguard, operating two High Speed Current Buster VOSS, was onsite at<br />
MC252. The AHTS Vanguard offloaded recovered product onto a barge.<br />
Note: Total oil recovered to date was 3031 barrels.<br />
The OSV MV John Coghill completed recovery of the Oil Containment Boom and Boom<br />
Mooring Systems at Mobile Bay. The OSV MV John Coghill arrived at Gulfport to begin<br />
installation of two Current Buster VOSS Skimming Systems.<br />
Monday, 24 May 2010<br />
With continued coordination authority over the bulk of SUPSALV OSR equipment assets, the<br />
Federal Reserve Asset Staging Unit in Gulfport (State Pier West) anticipated additional<br />
positioning per the USCG FOSC direction. Preparations were made to move six Class V<br />
Skimmer Systems (with support equipment) from the Gulfport staging area, along with all USS-<br />
42″ Oil Containment Boom from Amelia staging area, to the Port Fourchon/Grand Isle area. The<br />
move took several days. The two Class V Vessel Skimmers arrive from Alaska.<br />
All SUPSALV Oil Containment Boom recovered from Mobile Bay was sent to Gulfport to be<br />
refurbished.<br />
The OSV Wes Bordelon (in Venice) loaded USS-42″ Oil Containment Boom. The target area<br />
was not identified at the time of this boom deployment.<br />
GPC personnel onshore in Grand Isle continued to support near-shore recovery.<br />
The OSV AHTS Vanguard, equipped with two High Speed Current Buster VOSS, moved to the<br />
barge collection area and offloaded mud tanks.<br />
The OSV AHTS Vanguard got underway to MC252 to redeploy both VOSS and continued<br />
skimming operations.<br />
The OSV MV John Coghill began loading two Current Buster VOSS Skimming Systems while<br />
pierside in Gulfport.<br />
A Sea Scout Program vessel (OSV Gulf Scout), in port at Gulfport, was assigned to receive the<br />
Class XI VOSS.<br />