Deepwater Horizon Oil Spill Response<br />
TABLE OF FIGURES<br />
FIGURE 1-1- KEY EVENT TIMELINE ....................................................................................................................................... 1-2<br />
FIGURE 1-2. OIL CONTAINMENT BOOM WASHED UP ON THE SHORE OF EAST BAY. THIS BOOM WAS BLOWN FROM ITS MOORINGS (TIED TO<br />
WELL HEADS) AFTER AN AUGUST STORM ON THE GULF. ................................................................................................... 1-6<br />
FIGURE 1-3. RESOLVE SPUD BARGE WITH 2 MARCO CLASS V SKIMMERS ON DECK DEPARTING GULFPORT. BARGES PROVIDED SECURE<br />
STORAGE FOR THE SKIMMERS AND THEIR CREW WHEN WEATHER CONDITIONS EXCEEDED THEIR SEAKEEPING CAPABILITY. .............. 1-7<br />
FIGURE 2-1. <strong>ESSM</strong> PROGRAM MANAGER, MR. LLOYD SANER CONDUCTING THE MORNING BRIEF AT THE STATE PIER, GULFPORT, MS. . 2-3<br />
FIGURE 4-1. <strong>ESSM</strong> EQUIPMENT SITTING ON TRAILERS RECENTLY ARRIVED AT STATE PIER, GULFPORT, MS ON 2 MAY WAITING TO BE<br />
UNLOADED. ............................................................................................................................................................ 4-1<br />
FIGURE 4-2. MAY 11, 2010 IMAGE OF SAILORS UNLOADING <strong>ESSM</strong> ALASKA OIL CONTAINMENT EQUIPMENT FROM AN AIR FORCE C-17<br />
TRANSPORT AIRCRAFT AT NAVAL AIR STATION JOINT RESERVE BASE NEW ORLEANS. ............................................................ 4-2<br />
FIGURE 5-1. OVERHEAD VIEW OF STATE PIER, GULFPORT MS WITH AREA ALLOCATED FOR <strong>NAVY</strong> USE DURING DWH OPERATION<br />
HIGHLIGHTED IN GREEN. ............................................................................................................................................ 5-2<br />
FIGURE 5-2. SHOP VANS AND COMMAND VANS ARRANGED FOR USE IN STATE PIER, GULFPORT MS. ............................................... 5-3<br />
FIGURE 5-3. MANNING BY <strong>ESSM</strong> CONTRACTOR (INCLUDING SUBCONTRACTED NATIONAL RESPONSE CORPORATION PERSONNEL. ......... 5-4<br />
FIGURE 5-4. EQUIPMENT DEPLOYED IN SUPPORT OF ICP HOUMA AS OF WEEK OF 14 JUNE 2010. .................................................. 5-5<br />
FIGURE 5-5. EQUIPMENT DEPLOYED IN SUPPORT OF ICP MOBILE AS OF 14 JUNE 2010. ............................................................... 5-5<br />
FIGURE 5-6. MARCO CLASS V BEING TOWED BY ITS BOOMS BY TWO GULF SHRIMPERS. ................................................................ 5-6<br />
FIGURE 5-7. MARCO CLASS V LOADED ON JACK-UP BARGE MANTA RAY ON 9 MAY 2010. THE JACK-UP BARGES WERE INSTRUMENTAL IN<br />
FORWARD DEPLOYING THE NEAR SHORE SKIMMERS TO REMOTE LOCATIONS SUCH AS DAUPHIN ISLAND. .................................... 5-7<br />
FIGURE 5-8. STERN DECK OF OSV BAYOU BEE CONFIGURED WITH CRANE AND SHOP VANS TO PROVIDE MOBILE MARCO CLASS V<br />
SKIMMER MAINTENANCE. .......................................................................................................................................... 5-8<br />
FIGURE 5-9. VOSS CLASS XI SORBENT BELT OIL SKIMMER DEPLOYED ON OSV RENE PULLING THROUGH A THICK POCKET OF OIL. ...... 5-10<br />
FIGURE 5-10. OSV VANGUARD PULLING TWO NOFI HIGH SPEED CURRENT BUSTERS ON THE AFTERNOON OF 28 MAY, 2010. THE<br />
PORT SIDE NOFI IS DEPLOYED WITH AN OUTRIGGER ASSEMBLY AND THE STARBOARD SIDE NOFI IS EMPLOYING A PARAVANE TO HOLD<br />
THE BOOM OPEN. ................................................................................................................................................... 5-11<br />
FIGURE 5-11. OSV JOHN COGHILL’S HIGH SPEED CURRENT BUSTER WEIR PULLED FROM WATER TO ALLOW CLEANING OF DEBRIS WHICH<br />
WAS CLOGGING SUCTION. ........................................................................................................................................ 5-12<br />
FIGURE 5-12. SUPSALV CREW MAINTAINING THE PROPER ATTITUDE WHILE CLEANING DEBRIS FROM THE BELT OF THE CLASS XI SKIMMER<br />
WHILE DEPLOYED ON OSV RENE (11 JUNE 2010) ...................................................................................................... 5-13<br />
FIGURE 5-13. OUTRIGGER ASSEMBLY SUSPENDED OVER THE SIDE RAIL USED TO SERVICE THE PUMP IN THE POCKET OF THE HIGH SPEED<br />
CURRENT BUSTER .................................................................................................................................................. 5-14<br />
FIGURE 5-14. CONCEPT OF SIDEWAYS MOTION OF OSV TO HELP CONCENTRATE OIL WHICH ALLOWS QUICK DERIGGING TO ALLOW FOR RAPID<br />
TRAVEL TO A NEW SITE. ........................................................................................................................................... 5-16<br />
FIGURE 5-15. JUNE 6 2010 IMAGE OF CREWS ON OSV WES BORVELON PREPARING BOOM FOR DEPLOYMENT IN VICINITY OF HALF<br />
MOON ISLAND, LA WHERE PILINGS WERE DRIVEN AS BOOM ATTACHMENT POINTS. ............................................................. 5-18<br />
FIGURE 5-16. MOBILE BAY SHIP CHANNEL INITIAL OIL CONTAINMENT BOOM DEPLOYMENT PLAN THAT LEAD TO BOOM FAILURE. ......... 5-19<br />
FIGURE 5-17. BOOMING OPERATIONS OFF OF EAST BAY, LA ON JUNE 22, 2010 DEMONSTARTING USE OF WELL HEADS AS ANCHORING<br />
POINT FOR BOOM. .................................................................................................................................................. 5-20<br />