Chapter 3: Tasking and Funding<br />

Picture documentation of the damage was also required to be submitted. The USCG Form<br />

213RR was used to document the equipment BER and certify replacement costs. However, no<br />

funding was provided for machinery depreciation. Although a case could be made that the<br />

MARCO skimmers were substantially worn over the period of use, they were not unusable at the<br />

end of the operation. USCG Form 213RR’s were used to replace key MARCO skimmer<br />

components including 18 bunker belts and 54 suction and discharge hoses that had been<br />

significantly worn and were beyond continued use. The Navy accepted this type of loss in<br />

exchange for the replacement of the major items (i.e. booms and NOFI skimmers).<br />

3-7 Replacement by SUPSALV vs Replacement in Kind<br />

A second challenge SUPSALV faced was to get the Coast Guard to accept the concept of<br />

providing funds to procure replacement equipment identified as BER. The suggested alternative,<br />

was to let the responsible party (BP) provide or procure replacement material also known as<br />

“replacement in kind”. SUPSALV was resistant to this alternative because the procured material<br />

needed to meet very specific Navy and Military Specifications. The Navy specs require first<br />

article testing, operational testing, and destructive testing. They include packaging requirements<br />

(to simplify deployment), specialized fittings and configuration for integration into the <strong>ESSM</strong><br />

System. The logical means to ensure the replacement material met these requirements was to<br />

allow SUPSALV to perform the procurement, conduct the testing to ensure the replacement<br />

items met Navy specifications and could be integrated into the <strong>ESSM</strong> system. The Coast Guard<br />

did accept the Navy position and authorized reimbursement for Navy procured replacement<br />

material.<br />