06.01.2015 Views

U.S. NAVY SALVAGE REPORT DEEPWATER HORIZON ... - ESSM

U.S. NAVY SALVAGE REPORT DEEPWATER HORIZON ... - ESSM

U.S. NAVY SALVAGE REPORT DEEPWATER HORIZON ... - ESSM

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

USCG DEEP WATER <strong>HORIZON</strong><br />

INVESTIGATION D.O. 0043<br />

Monday, 27 September<br />

AM Watch Summary<br />

Crew transited to the vessel and moved aboard. At 1135, ship was underway to the<br />

operations site.<br />

PM Watch Summary<br />

Started shifts.<br />

Tuesday, 28 September<br />

AM Watch Summary<br />

Started Dive #1.<br />

PM Watch Summary<br />

Ran counter bypass cable to correct failure in counter. Fixed Sonar on ROV. Fixed<br />

damaged Tygon on HD Camera. Started Dive #2.<br />

Wednesday, 29 September<br />

AM Watch Summary<br />

Completed Dive #2. Rigged Programmable Generic Transponder (PGT) beacon for seafloor<br />

deployment with ROV, Dive #3. ROV readied for Dive #3, seafloor beacon deployment.<br />

Stood by for SIMOPS permission to proceed. Dive #3, deployed seafloor beacon but,<br />

received no valid replies. Surveyed the area west of the rig.<br />

PM Watch Summary<br />

Flew over the rig to the east side. Located west pontoon and surveyed pylons. Cross beam<br />

to east pontoon and surveyed pylons. Surveyed area east of the rig and located a Conex box,<br />

derrick section, crane boom, and control room (north of the rig). Recovered ROV for xBot<br />

integration.<br />

Thursday, 30 September<br />

AM Watch Summary<br />

Moved the BC Q camera to the frame. Moved the old zoom to the pan and tilt. Completed<br />

xBot integration. Integrated the hydraulic cutter and secured in the port manipulator jaw. A<br />

steel awl was placed in the starboard manipulator jaw. Reviewed the Dive #3 video of the<br />

bridge section of the rig. Turned off FOG power inside Deep Drone. The 0500, xBot power<br />

turned on. Power consumption in sleep mode. Deep Drone/xBot pre-dive began. xBot<br />

locked down in cage, Dive #4. Maneuvered Deep Drone to the open bridge windows.<br />

Launched xBot and performed interior bridge survey. Recovered xBot to Deep Drone.<br />

Recovered Deep Drone to ship’s deck.<br />

PM Watch Summary<br />

Dive #5, Surveyed ROV containers (operations and maintenance) and bridge section.<br />

Vessel was repositioned over the main rig. Surveyed the middle of the main rig with Deep<br />

Drone and xBot. Recovered xBot and Deep Drone to the vessel deck.<br />

PIHI –10096<br />

2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!