U.S. NAVY SALVAGE REPORT DEEPWATER HORIZON ... - ESSM

U.S. NAVY SALVAGE REPORT DEEPWATER HORIZON ... - ESSM U.S. NAVY SALVAGE REPORT DEEPWATER HORIZON ... - ESSM

06.01.2015 Views

Final Report, SONS Deepwater Horizon Oil Spill, Gulf of Mexico, 27 April — 24 September 2010 APPENDIX G – OFFSHORE SUPPLY VESSELS USED 1. John Coghill 265′ Assigned 29 April 2010. Used for deploying boom offshore, at Ship Island, MS and Mobile Bay, AL as well as for skimming operations with two High Speed Current Busters offshore. 2. Seacor Vanguard 255′ Assigned 5 May 2010. Used for skimming operations with two High Speed Current Busters offshore. 3. Seacor Vantage 221′ Assigned 2 July 2010. Used as replacement for the Seacor Vanguard which had another mission. Two High Speed Current Busters were transferred from the Vanguard to her and she operated offshore skimming. 4. Bayou Bee 195′ Assigned 12 June 2010. Set up with maintenance equipment, crane, and used to visit various skimmer systems to perform maintenance on skimmers. 5. Wes Bordelon 150′ Assigned 8 May 2010. Used out of Venice, LA. To deploy Oil Containment Boom around several islands and between old well heads in East Bay, LA. 6. Caspian Sea 64′ Assigned 27 June 2010. Used to replace the Wes Bordelon (who broke down) Caspian Sea was performing the same functions. 7. Renee 195′ Assigned 2 June 2010. Class XI Skimming system was installed and used in offshore skimming operations. G-1

Appendix B Tasking and Funding Documents Table of Contents Cost of Operations and Cost of Replacement Items Beyond Economical Repair Tables ......... B-2 28 April USCG Tasking Message ............................................................................................ B-3 RFA (No Number) issued 2 May with initial $3.5M. ................................................................... B-4 RFA (No Number) issued 8 and 9 May addressing Anchorage Equip. ..................................... B-5 RFA (006) issued 21 May authorizing additional $3.75M in funds ............................................ B-6 RFA 006B issued on or about 18 June authorizing 5.5M in funds .......................................... B-7 RFA 121 issued about 2 July funding IATAP activities for PCCI. ..................... (not included here) RFA 006C issued 21 July authorizing additional $8.524M in funds .......................................... B-8 RFA 006D issued 18 September extending operation to 15 October 2010. ............................... B-9 RFA 006E issued 06 October extending operation to 15 December 2010 ............................. B-10 RFA 141 issued 11 August authorizing replacement of 42 inch boom ................................... B-11 RFA 142 issued 11 August authorizing replacement of Current Busters ................................ B-12 RFA 145 issued 21 August authorizing replacement of Marco skimmer bunker oil belts ........ B-14 RFA 146 issued 20 August authorizing replacement of Marco skimmer hoses ...................... B-15 RFA 147 issued (undated) authorizing replacement of 1 50,000 gal bladder ......................... B-16 RFA 151 issued 30 August authorizing replacement of 26" boom ......................................... B-17 RFA 154 issued 27 September authorizing replacement of 25K gal bladders ........................ B-18 B-1

Appendix B<br />

Tasking and Funding Documents<br />

Table of Contents<br />

Cost of Operations and Cost of Replacement Items Beyond Economical Repair Tables ......... B-2<br />

28 April USCG Tasking Message ............................................................................................ B-3<br />

RFA (No Number) issued 2 May with initial $3.5M. ................................................................... B-4<br />

RFA (No Number) issued 8 and 9 May addressing Anchorage Equip. ..................................... B-5<br />

RFA (006) issued 21 May authorizing additional $3.75M in funds ............................................ B-6<br />

RFA 006B issued on or about 18 June authorizing 5.5M in funds .......................................... B-7<br />

RFA 121 issued about 2 July funding IATAP activities for PCCI. ..................... (not included here)<br />

RFA 006C issued 21 July authorizing additional $8.524M in funds .......................................... B-8<br />

RFA 006D issued 18 September extending operation to 15 October 2010. ............................... B-9<br />

RFA 006E issued 06 October extending operation to 15 December 2010 ............................. B-10<br />

RFA 141 issued 11 August authorizing replacement of 42 inch boom ................................... B-11<br />

RFA 142 issued 11 August authorizing replacement of Current Busters ................................ B-12<br />

RFA 145 issued 21 August authorizing replacement of Marco skimmer bunker oil belts ........ B-14<br />

RFA 146 issued 20 August authorizing replacement of Marco skimmer hoses ...................... B-15<br />

RFA 147 issued (undated) authorizing replacement of 1 50,000 gal bladder ......................... B-16<br />

RFA 151 issued 30 August authorizing replacement of 26" boom ......................................... B-17<br />

RFA 154 issued 27 September authorizing replacement of 25K gal bladders ........................ B-18<br />