Final Report, SONS Deepwater Horizon Oil Spill, Gulf of Mexico, 27 April — 24 September 2010<br />

SECTION F – EQUIPMENT EVALUATIONS<br />

Various:<br />

Boat operators needed an air conditioner in the workboat cabs in very hot<br />

weather experienced during this operation.<br />

Recommendation: Small portable A/C unit designed for forklifts were procured and installed<br />

in some of the Class V skimmers. Due to the limited availability of the<br />

A/C units, not all the skimmers were outfitted at all sites. Continue to<br />

install A/C units during refurbishment or maintenance as funds become<br />

available. Install A/C units on all workboats with cabs. Also add at least<br />

two shade devices to each skimmer.<br />

SK0050:<br />

The High Speed Current Buster’s exterior covering started deteriorating<br />

and bladders began leaking. Ordered replacement bladders, however<br />

exterior covering was not available. Had to sew covering together with<br />

sail twine to make it last.<br />

Recommendation: Review a heavier upgrade and more durable fabric for the covers.<br />

OA0010:<br />

The aluminum pulley on the lower part of outrigger’s king post where<br />

towline goes through is too small, and line would hang up between it and<br />

the framework causing the line to chafe and cut through.<br />

Recommendation: Replace the aluminum pulley with larger Delrin roller.<br />

SK0050:<br />

Weir Skimmer bellows continued to come off the skimmer pocket.<br />

Recommendation: Install bolts and washers in several locations through the mount point.<br />

SK0711:<br />

The Class V Skimmers’ offloading pumps continually froze up and had to<br />

be worked on. These pumps are old, and parts are not readily available.<br />

Recommendation: Replace with newer hydraulic submersible pumps.<br />

Various:<br />

The Class V Skimmers’ skimmer-to-boom attachment tow points<br />

(aluminum female intrusions) were wearing to the point that the boom-toskimmer<br />

attachment tow points (male extrusion) detached on several<br />

skimmers. The skimmers had to be removed from the water to weld the<br />

female intrusion.<br />

Recommendation: Need to design a permanent attachment setup.<br />

Various:<br />

The Boom Mooring Systems for 42″ boom were adequate; however,<br />

SUPSALV’s inventory did not have enough systems to support all the Oil<br />

Containment Boom on hand.<br />

Recommendation: Procure to the inventory objective as a priority<br />