06.01.2015 Views

U.S. NAVY SALVAGE REPORT DEEPWATER HORIZON ... - ESSM

U.S. NAVY SALVAGE REPORT DEEPWATER HORIZON ... - ESSM

U.S. NAVY SALVAGE REPORT DEEPWATER HORIZON ... - ESSM

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Final Report, SONS Deepwater Horizon Oil Spill, Gulf of Mexico, 27 April — 24 September 2010<br />

The Class V Skimmers, and other SUPSALV equipment in Grand Isle, were in the process of<br />

decontamination, inventorying, and packaging for further transport. All transport of such gear to<br />

out-of-state locations was put on hold per ICP Houma.<br />

OSV MV Renee remained in Gulfport as the Class XI Skimmer System was being offloaded and<br />

restaged on the pier.<br />

Saturday–Monday, 21 –23 August 2010<br />

SUPSALV OSR equipment and 90 personnel were deployed and/or staged throughout GOMEX<br />

from Pensacola west to Grand Isle.<br />

SUPSALV continued coordinating response operations from Gulfport (at State Pier) as directed<br />

by the USCG FOSC.<br />

SUPSALV continued to assist the CNIC management team with maintenance, logistics, and<br />

demobilization.<br />

The total SUPSALV Oil Containment Boom in GOMEX was 98,000′ with 34,085′ of boom still<br />

deployed (18,040′ identified as beyond economical repair). GPC personnel continued to clean<br />

and inspect Oil Containment Boom as well as decontaminate the Class XI equipment and other<br />

SUPSALV equipment.<br />

The nine Class V Skimmers remained in port/ on board barges with assigned ICP Mobile Task<br />

Forces coordinating the decontamination of five of the assigned skimmers.<br />

OSV Bayou Bee recovered 330′ of stranded Oil Containment Boom from Cat Island.<br />

GPC Venice personnel conducted Oil Containment Boom recovery.<br />

The Class V Skimmers, and other SUPSALV equipment in Slidell, were cleaned and awaited<br />

transport to Gulfport.<br />

Four Class V Skimmers, and other SUPSALV equipment in Grand Isle, were in<br />

decontamination. Also, consolidating all SUPSALV equipment was in progress for transport.<br />

In Gulfport, OSV MV Renee offloaded; awaiting further tasking orders.<br />

Tuesday and Wednesday, 24–25 August 2010<br />

SUPSALV OSR equipment and 71 personnel were deployed and/or staged throughout GOMEX<br />

from Pensacola west to Grand Isle.<br />

SUPSALV continued coordinating response operations in Gulfport (at State Pier) as directed by<br />

the USCG FOSC.<br />

100

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!