06.01.2015 Views

U.S. NAVY SALVAGE REPORT DEEPWATER HORIZON ... - ESSM

U.S. NAVY SALVAGE REPORT DEEPWATER HORIZON ... - ESSM

U.S. NAVY SALVAGE REPORT DEEPWATER HORIZON ... - ESSM

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Final Report, SONS Deepwater Horizon Oil Spill, Gulf of Mexico, 27 April — 24 September 2010<br />

Saturday, 7 August 2010<br />

SUPSALV OSR equipment and 122 personnel were positioned throughout Pensacola, Mobile,<br />

Bayou La Batre, Pascagoula, Gulfport, Ship Island, Slidell, Venice, and Port Fourchon/Grand<br />

Isle.<br />

SUPSALV continued coordinating operations from Gulfport (at State Pier) positioning,<br />

maintaining, and operating SUPSALV OSR equipment assets as directed by the USCG FOSC.<br />

SUPSALV continued to assist the CNIC management team.<br />

The total SUPSALV Oil Containment Boom in GOMEX was 98,000′ with 43,350′ of boom still<br />

deployed (11,280′ identified as being beyond economical repair).<br />

Note: Total oil recovered to date: VOSS offshore - 21,176 barrels and Class V Skimmers nearshore<br />

- 2029 barrels.<br />

Four spud/jack-up barges with seven Class V Skimmers on board (assigned to near-shore Task<br />

Force under ICP Mobile) operated between Pascagoula and Pensacola as directed. No oil was<br />

encountered.<br />

OSV Bayou Bee returned the Class V Skimmer USN #99 from the decontamination yard in<br />

Theodore to Gulfport.<br />

GPC Venice personnel continued removing Oil Containment Boom at East Bay.<br />

In Slidell, the Class V Skimmers remained on standby.<br />

Grand Isle deployed skimming equipment, but no oil was encountered.<br />

OSVs AHTS Vanguard and Vantage were in Theodore in undergoing decontamination. All<br />

SUPSALV equipment was offloaded from Vantage.<br />

Sunday, 8 August 2010<br />

SUPSALV OSR equipment and 118 personnel were positioned throughout Pensacola, Mobile,<br />

Bayou La Batre, Pascagoula, Gulfport, Ship Island, Slidell, Venice, and Port Fourchon/Grand<br />

Isle.<br />

SUPSALV continued coordinating operations from Gulfport (at State Pier) positioning,<br />

maintaining, and operating SUPSALV OSR equipment assets as directed by the USCG FOSC.<br />

SUPSALV continued to assist the CNIC management team.<br />

The total SUPSALV Oil Containment Boom in GOMEX was 98,000′ with 43,350′ of boom still<br />

deployed (11,280′ identified as beyond economical repair).<br />

92

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!