Final Report, SONS Deepwater Horizon Oil Spill, Gulf of Mexico, 27 April — 24 September 2010<br />

SUPSALV continued coordinating operations from Gulfport (at State Pier) positioning,<br />

maintaining, and operating SUPSALV OSR equipment assets as directed by the USCG FOSC.<br />

SUPSALV continued to assist the CNIC management team.<br />

The total SUPSALV Oil Containment Boom in GOMEX to date was 98,000′ with 60,700′ of<br />

boom deployed.<br />

Note: Total oil recovered to date: VOSS offshore - 21,151 barrels and Class V Skimmers nearshore<br />

- 1983 barrels.<br />

Pecos barge, with two Class V Skimmers and four spud/jack-up barges with seven Class V<br />

Skimmers on board (assigned to near-shore Task Force under ICP Mobile), operated between<br />

Pascagoula and Pensacola as directed. No oil was encountered.<br />

OSV Bayou Bee in area continued Class V skimmer service operations.<br />

GPC personnel continued removing, cleaning, and evaluating damaged Oil Containment Boom<br />

and Boom Mooring Systems from Ship Island.<br />

GPC personnel with OSV Caspian remained in Venice preparing for boom servicing operations.<br />

Skimmer operations and equipment training were conducted at the Slidell operations site.<br />

GPC personnel in Grand Isle continued conducting shoreline and near-shore skimming<br />

operations. No oil was encountered.<br />

OSVs AHTS Vanguard and Vantage with VOSS got underway at MC252 site. No recoverable<br />

oil was encountered.<br />

The new crane arrived and was installed on the OSV Renee in Gulfport.<br />

Wednesday, 21 July 2010<br />

SUPSALV OSR equipment and 133 personnel were positioned throughout Pensacola, Mobile,<br />

Bayou La Batre, Pascagoula, Gulfport, Ship Island, Slidell, Venice, and Port Fourchon/Grand<br />

Isle.<br />

SUPSALV continued coordinating operations from Gulfport (at State Pier) positioning,<br />

maintaining, and operating SUPSALV OSR equipment assets as directed by the USCG FOSC.<br />

SUPSALV continued to assist the CNIC management team.<br />

77