Final Report, SONS Deepwater Horizon Oil Spill, Gulf of Mexico, 27 April — 24 September 2010<br />

Friday, 18 June 2010<br />

SUPSALV OSR equipment and 129 personnel were positioned throughout Pensacola, Mobile,<br />

Bayou La Batre, Pascagoula, Gulfport, Ship Island, Slidell, Venice, and Port Fourchon/Grand<br />

Isle.<br />

SUPSALV continued coordinating operations from Gulfport (at State Pier) positioning,<br />

maintaining, and operating SUPSALV OSR equipment assets as directed by the USCG FOSC.<br />

The total SUPSALV Oil Containment Boom in GOMEX to date was 98,000′ with 63,200′ of<br />

boom deployed.<br />

All eighteen Class V Skimming Systems, one Class XI Skimmer System, and four High Speed<br />

Current Buster VOSS with crews were positioned at the USCG designated locations. This<br />

includes the one Class V out of commission undergoing decontamination.<br />

Note: Total oil recovered to date: VOSS offshore - 12,740 barrels and Class V Skimmers nearshore<br />

- 1226 barrels.<br />

The Pecos barge, with two Class V Skimmers on board and four spud/jack-up barges with five<br />

Class V Skimmers on board (assigned to near-shore Task Force under ICP Mobile), operated<br />

between Pascagoula and Pensacola skimming sporadic oil pockets and streams.<br />

OSV Bayou Bee conducted skimmer maintenance.<br />

The previously overturned skimmer was still in decontamination.<br />

Thursday’s request to move two Class V Skimmers from the pier at Port Fourchon to Grand Isle<br />

was changed. SUPSALV was redirected to send one to replace the skimmer that was overturned<br />

in Mobile. The other skimmer’s destination would be determined later.<br />

GPC personnel onshore in Grand Isle continued to support near-shore recovery operations. The<br />

Class V Skimmers reported no oil was recovered.<br />

OSVs MV John Coghill and AHTS Vanguard, operating two High Speed Current Buster VOSS<br />

each, continued skimming operations near the Deepwater Horizon site.<br />

Saturday, 19 June 2010<br />

SUPSALV OSR equipment and 129 personnel were positioned throughout Pensacola, Mobile,<br />

Bayou La Batre, Pascagoula, Gulfport, Ship Island, Slidell, Venice, and Port Fourchon/Grand<br />

Isle.<br />

SUPSALV continued coordinating operations from Gulfport (at State Pier) positioning,<br />

maintaining, and operating SUPSALV OSR equipment assets as directed by the USCG FOSC.<br />

47