06.01.2015 Views

Bridges on driven steel piles sheet pile cofferdams in periya ... - Movax

Bridges on driven steel piles sheet pile cofferdams in periya ... - Movax

Bridges on driven steel piles sheet pile cofferdams in periya ... - Movax

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<str<strong>on</strong>g>Bridges</str<strong>on</strong>g> <strong>on</strong> <strong>driven</strong> <strong>steel</strong> <strong><strong>pile</strong>s</strong><br />

Sheet <strong>pile</strong> <strong>cofferdams</strong> <strong>in</strong> Periya river <strong>in</strong> Kerala<br />

Renovati<strong>on</strong> of bridge over Krzywe Lake<br />

Sheet <strong><strong>pile</strong>s</strong> for fuel tank <strong>in</strong>stallati<strong>on</strong><br />

Sheet <strong>pile</strong> driv<strong>in</strong>g <strong>in</strong> Gothenburg city centre


Tasmania, Australia 2013<br />

<str<strong>on</strong>g>Bridges</str<strong>on</strong>g> <strong>on</strong> <strong>driven</strong> <strong>steel</strong> <strong><strong>pile</strong>s</strong><br />

BridgePro took delivery of a <strong>Movax</strong> SG-60V Side-Grip vibrator<br />

and an IH-25D <strong>pile</strong> hammer <strong>in</strong> January <strong>in</strong> Tasmania,<br />

Australia. BridgePro is a specialist bridge c<strong>on</strong>structi<strong>on</strong><br />

c<strong>on</strong>tractor specialis<strong>in</strong>g <strong>in</strong> precast modular bridges with<br />

spans between 6 and 21m. With the purchase of the pil<strong>in</strong>g<br />

equipment they have created a sister company called<br />

PilePro better reflect<strong>in</strong>g the new bus<strong>in</strong>ess opportunities<br />

created by the vibrator and hammer.<br />

The comb<strong>in</strong>ati<strong>on</strong> of the SG-60V vibrator and IH-25D<br />

hammer was chosen after an extensive worldwide<br />

search to f<strong>in</strong>d the most versatile and productive pil<strong>in</strong>g<br />

system to complement their <strong>in</strong>novative precast bridge<br />

system. With jobs generally small <strong>in</strong> size and transport<br />

a key c<strong>on</strong>siderati<strong>on</strong>, the relative light weight of the two<br />

attachments and suitability to operate off a moderately<br />

sized excavator made the comb<strong>in</strong>ati<strong>on</strong> the right choice.<br />

“We were impressed with the modular nature of the SG<br />

model vibrator giv<strong>in</strong>g us the ability to <strong>in</strong>stall <strong>sheet</strong>, tube,<br />

timber and h-<strong><strong>pile</strong>s</strong> all with the <strong>on</strong>e mach<strong>in</strong>e” said Aar<strong>on</strong><br />

Brimfield, Director of BridgePro.<br />

BridgePro director commented they have had a lot of<br />

experience with excavator mounted hammers and f<strong>in</strong>d<br />

the functi<strong>on</strong>ality, simplicity and relative lightweight nature<br />

of the IH-25D to be of significant advantage over<br />

alternatives. It seamlessly <strong>in</strong>tegrates with the <strong>Movax</strong><br />

computer and provides the operator essential feedback<br />

<strong>on</strong> the impact energy be<strong>in</strong>g applied.<br />

For bridge and other structural foundati<strong>on</strong>s, the ability<br />

to drive the <strong>pile</strong> <strong>in</strong>to harder layers and ‘hit’ the <strong>pile</strong> to<br />

dem<strong>on</strong>strate load capacity is essential. Once the <strong>pile</strong> is<br />

stood and vibrated to refusal, they are able to attach<br />

the impact hammer, and c<strong>on</strong>t<strong>in</strong>ue to drive the <strong>pile</strong> to<br />

the required structural capacity.<br />

“Although <strong>on</strong>ly newly acquired, we are excited about the<br />

possibilities the comb<strong>in</strong>ati<strong>on</strong> of the vibrator and hammer<br />

provide” Aar<strong>on</strong> Brimfield, BridgePro.


Kerala, India 2013<br />

Sheet <strong>pile</strong> <strong>cofferdams</strong> <strong>in</strong> Periya river <strong>in</strong> Kerala<br />

Marymatha C<strong>on</strong>structi<strong>on</strong> company has secured a job for<br />

c<strong>on</strong>structi<strong>on</strong> of regulator-cum-bridge <strong>on</strong> Periyar river <strong>in</strong><br />

Indian state of Kerala. Dur<strong>in</strong>g high tide the water level<br />

<strong>in</strong> sea rises and because of this the sea water starts<br />

flow<strong>in</strong>g back <strong>in</strong>to river. New structure will permit c<strong>on</strong>trol<br />

over the water flow to the river. This project is go<strong>in</strong>g to<br />

be helpful <strong>in</strong> solv<strong>in</strong>g some envir<strong>on</strong>mental and potable<br />

water issues and scarcity of water for agriculture <strong>in</strong><br />

places adjacent to the bridge.<br />

C<strong>on</strong>tractor has to c<strong>on</strong>struct a two-lane bridge of 7.50<br />

metre each side and a regulator at a length of 180 metres<br />

across the river. The project <strong>in</strong>cludes three <strong>sheet</strong><br />

<strong>pile</strong> <strong>cofferdams</strong> <strong>in</strong> stages of 60 m each for dewater<strong>in</strong>g<br />

and c<strong>on</strong>structi<strong>on</strong>.<br />

Kerala based Marymatha purchased a <strong>Movax</strong> SP-50F<br />

Side-Grip vibro for c<strong>on</strong>struct<strong>in</strong>g the <strong>cofferdams</strong>. Sheet<br />

<strong><strong>pile</strong>s</strong> of 8 to 12 M length are <strong>driven</strong> with the Side-Grip<br />

<strong>sheet</strong> <strong>pile</strong>r <strong>on</strong> JCB 210 excavator mounted <strong>on</strong> a barge<br />

to allow operati<strong>on</strong> across the river.<br />

The works are likely to be completed <strong>in</strong> two years.<br />

On the cover:<br />

Renovati<strong>on</strong> of bridge over Krzywe Lake<br />

Poland´s first SG-60 series <strong>Movax</strong> <strong>pile</strong> driver was delivered<br />

to Bialystok based company called Hydrobud. It<br />

has been first put <strong>in</strong>to work at bridge renovati<strong>on</strong> site.<br />

Renovati<strong>on</strong> of the bridge over Krzywe Lake <strong>in</strong> Suwalki<br />

demanded 16 number of tubular <strong>steel</strong> <strong><strong>pile</strong>s</strong> with end<br />

caps <strong>driven</strong> 24 metres <strong>in</strong>to the lake bed. The <strong><strong>pile</strong>s</strong> were<br />

re<strong>in</strong>forced with c<strong>on</strong>crete to create solid and l<strong>on</strong>g last<strong>in</strong>g<br />

base for the renewed bridge.<br />

Company HYDROBUD is mostly build<strong>in</strong>g bridges and hydroeng<strong>in</strong>eer<strong>in</strong>g<br />

c<strong>on</strong>structi<strong>on</strong>s. www.hydrobud.bialystok.pl<br />

Suwalki, Poland 2012


Sheet <strong><strong>pile</strong>s</strong> for fuel tank <strong>in</strong>stallati<strong>on</strong><br />

Installati<strong>on</strong> of a new fuel tank at a petrol stati<strong>on</strong> near<br />

Gothenburg city required <strong>sheet</strong> <strong>pile</strong>d cofferdam. The<br />

<strong>sheet</strong> <strong><strong>pile</strong>s</strong> were <strong>driven</strong> to bed rock, so the length of<br />

the <strong><strong>pile</strong>s</strong> varied. Work was carried out with <strong>Movax</strong><br />

Side-Grip <strong>sheet</strong> <strong>pile</strong>r fitted <strong>on</strong> to Volvo 240 excavator<br />

that is also equipped with a Power Pack. Sheet pil<strong>in</strong>g<br />

c<strong>on</strong>tractor <strong>in</strong> this c<strong>on</strong>structi<strong>on</strong> project was Trailer Bengt.<br />

Sheet <strong>pile</strong> driv<strong>in</strong>g <strong>in</strong> Gothenburg city<br />

centre<br />

Library build<strong>in</strong>g <strong>in</strong> Gothenburg city centre was enlarged<br />

In 2012. At the c<strong>on</strong>structi<strong>on</strong> site <strong>sheet</strong> <strong>pile</strong>d reta<strong>in</strong><strong>in</strong>g<br />

wall was made with 150 number of <strong>sheet</strong>s of which<br />

most of were taken away as the build<strong>in</strong>g proceeded.<br />

Small porti<strong>on</strong> of the <strong>sheet</strong> <strong><strong>pile</strong>s</strong> were left as supportive<br />

structure <strong>in</strong> the middle of the c<strong>on</strong>structi<strong>on</strong> site. Ma<strong>in</strong><br />

c<strong>on</strong>tractor for the project was Aarsleff AB . Sheet pil<strong>in</strong>g<br />

work was completed by Niklas Sivenmark company<br />

with <strong>Movax</strong> SP70 F4 <strong>on</strong> Hitachi 350, length of the<br />

<strong><strong>pile</strong>s</strong> were 8-10 metres. Pre-cast c<strong>on</strong>crete <strong><strong>pile</strong>s</strong> that<br />

formed actual foundati<strong>on</strong> for the build<strong>in</strong>g were <strong>driven</strong><br />

by Junttan hammer.<br />

bc India 2013 <strong>in</strong> Mumbai<br />

<strong>Movax</strong> had own stand at bc India 2013 exhibiti<strong>on</strong> together<br />

with Indian <strong>Movax</strong> distributor Worldc<strong>on</strong> Technologies<br />

(Mr. Ashutos Dhar) from 5th to 8th of February <strong>in</strong><br />

Mumbai. Mr. Matti Must<strong>on</strong>en and Mr. Mikko V<strong>in</strong>kki were<br />

represent<strong>in</strong>g <strong>Movax</strong> Ltd at the expo.<br />

Bauma 2013<br />

Bauma 2013 will so<strong>on</strong> be at hand. From 15th to 21st of April <strong>in</strong> Munich all<br />

key pers<strong>on</strong>s of <strong>Movax</strong> will host stand N623/12 at open air area F6. Demos<br />

are performed with <strong>Movax</strong> SG-60V, <strong>Movax</strong> M<strong>in</strong>i Leader Rig MLR-15 and <strong>Movax</strong><br />

Impact Hammer IH-25d.<br />

Upcom<strong>in</strong>g exhibiti<strong>on</strong>s<br />

Besides of Bauma, <strong>Movax</strong>-people can be met <strong>in</strong> follow<strong>in</strong>g<br />

exhibiti<strong>on</strong>s dur<strong>in</strong>g the spr<strong>in</strong>g 2013:<br />

• The Big 5 Saudi 2013, 9.-12.3., Jeddah,<br />

Saudi Arabia<br />

• Mask<strong>in</strong>Expo 2013, 23.-25.5., Stockholm, Sweden<br />

• CTT 2013, 4.-8.6.2013, Moscow, Russia<br />

• MAXPO, 5.-9.9.2013, Hyv<strong>in</strong>kää, F<strong>in</strong>land<br />

<strong>Movax</strong> Oy<br />

Productivity through <strong>in</strong>novati<strong>on</strong><br />

Tölkkimäentie 10, FI-13130 Hämeenl<strong>in</strong>na, F<strong>in</strong>land<br />

tel. +358-(0)3-628 070, fax +358-(0)3-616 1641<br />

www.movax.com, email: market<strong>in</strong>g(a)movax.fi<br />

C<strong>on</strong>tact <strong>in</strong>formati<strong>on</strong>:<br />

Sales and Market<strong>in</strong>g:<br />

Mr. Matti Must<strong>on</strong>en, Manag<strong>in</strong>g Director, +358 400 734 999<br />

Mr. Mikko L<strong>in</strong>deman, Technical Director, +358 400 778 111<br />

Mr. Mikko V<strong>in</strong>kki, Sales and After-Sales Eng<strong>in</strong>eer, +358 50 336 2477<br />

Mr. Joachim Rübsam, Sales and After-Sales Eng<strong>in</strong>eer, +358 50 461 9995<br />

Spare parts:<br />

Mr. Jani Sipilä, +358 3 628 0716

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!