5 Conclusions<br />

The work is in good <strong>progress</strong> and there are <strong>no</strong> deviations from the “Description of Work”. The<br />

deliverables/<strong>report</strong>s scheduled for the first half <strong>year</strong> were sent. The three most important<br />

milestones were<br />

1. project presentation (website, TWiki, mailing-list, multimedia power-point<br />

presentation, poster, folder),<br />

2. paper-incunabula cross-linking,<br />

3. integration blueprint.<br />

The first half <strong>year</strong> was characterized by strong dissemination activities (exhibitions, meetings,<br />

lectures, papers, press releases) and as one result additional interested institutions (e.g.<br />

Academy of Fine Arts, Kupferstichkabinett Vienna a.s.o.) willing to cooperate were attracted.<br />

The next important step will be the “General meeting” in Fabria<strong>no</strong> with an exhibition and the<br />

forthcoming milestones “M2.3 first version of the watermark standard”, “M4.1 first version of<br />

the integrated bibliography” and “M1.2 a demonstration version of the integrated workspace”.<br />