Key parameters<br />

Net lifting capacity:<br />

Sheerlegs mode 974 tons at 20 meters radius 173 tons at 76 meters radius<br />

Slewing mode 267 tons at 20 meters radius 10 tons at 60 meters radius<br />

The net lifting capacity takes account of the weight of the main and auxiliary hook blocks and wire ropes<br />

and is therefore fully available for lifting loads. The auxiliary hoist has a capacity of 30 tons.<br />

<strong>Barge</strong>: 100 x 30 meters, draught with maximum load on the hook 4.2 meters<br />

Maximum hook height (main hoist) 64 meters<br />

Operating envelope<br />

The <strong>PTC</strong> on the barge has a wide operating envelope and can continue lifting up to:<br />

- 12.86 m/s wind speed<br />

- 0.6 m signifi cant wave height<br />

The full lift capacity is available within this envelope, i.e. there is no derating. Certain lifting jobs can be<br />

undertaken at signifi cant wave heights up to 1.3 meters. However, when the operating boundaries are<br />

approached Mammoet personnel on site will assess the situation and decide if the lifting operations may<br />

be continued.