OUR PLAN - Transnet
OUR PLAN - Transnet
OUR PLAN - Transnet
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>OUR</strong> <strong>PLAN</strong><br />
The MDS<br />
is key to<br />
South Africa’s<br />
economic<br />
growth strategy.<br />
BRIAN MOLEFE<br />
GROUP CHIEF<br />
EXECUTIVE<br />
We will<br />
determine<br />
performance<br />
levels for each<br />
vessel that calls<br />
in South Africa.<br />
We will address<br />
marine operational<br />
issues such<br />
as delays, vessel<br />
movement and<br />
availability of<br />
marine resources.<br />
We will<br />
accelerate skills<br />
development<br />
through<br />
training and<br />
development.<br />
We will<br />
implement<br />
equipment<br />
replacement<br />
and<br />
maintenance<br />
programmes.<br />
We will institute<br />
a regular<br />
performance<br />
management<br />
programme.<br />
We will<br />
determine<br />
appropriate<br />
operational<br />
targets across<br />
all operations.<br />
LIGHTHOUSES<br />
SALDAnHA |<br />
TRANSNET<br />
NATIONAL<br />
PORTS<br />
AUTHORITY<br />
AND THE<br />
MDS<br />
PORT LIMITS<br />
CAPE TOWn |<br />
TEnAnTS<br />
MOSSEL BAY | PORT ELIZABETH<br />
1 2 3 4<br />
We will increase<br />
container capacity<br />
across our ports by<br />
7,5% per annum over<br />
the next seven years.<br />
DREDGING<br />
SERVICES<br />
Creates depth for<br />
vessels to navigate through.<br />
TUG<br />
GUIDES<br />
VESSELS<br />
TO<br />
BERTH<br />
BREAK<br />
WATER<br />
Creates a channel<br />
for vessels to<br />
navigate through.<br />
PILOT<br />
STEERS<br />
VESSEL<br />
Trained port<br />
pilot taken<br />
by boat or<br />
helicopter to<br />
steer vessels<br />
safely to port.<br />
We will focus<br />
on customer<br />
relations in<br />
order to increase<br />
service offerings.<br />
We will review<br />
pricing in order<br />
to comply<br />
with economic<br />
regulations.<br />
5 6<br />
We will strive to<br />
enhance marine<br />
services and improve<br />
terminal performance.<br />
PORT<br />
COnTROL<br />
TOWER<br />
Ensures the<br />
safe navigation<br />
of vessels and<br />
dispatches<br />
pilots, tugs and<br />
berthing staff.<br />
BERTHING<br />
SERVICES<br />
PORT<br />
LIMITS<br />
Vessels wait on<br />
the perimeter<br />
for clearance<br />
from the harbour<br />
master and for a<br />
port pilot to steer<br />
the vessel safely<br />
into the port.<br />
Docking and<br />
undocking of<br />
vessels.<br />
nGQURA | EAST LOnDOn |<br />
We will improve the<br />
management and<br />
delivery of infrastructure<br />
capital projects.<br />
PORT LIMITS<br />
HARBOuR<br />
MASTER<br />
The harbour<br />
master controls<br />
traffic in and out<br />
of the port.<br />
TERMInAL OPERATORS<br />
DURBAn | RICHARDS BAY<br />
www.transnet.net<br />
/Divisions/nPAuthority<br />
We will increase<br />
volumes and<br />
efficiencies and<br />
lower the cost of<br />
doing business.<br />
LIGHTHOUSES<br />
<strong>Transnet</strong> National Ports Authority aims to enable regional<br />
integration by establishing South Africa as a transshipment hub.<br />
TRANSNET 25