COUNCIL MINUTES<br />

28 AUGUST 2012<br />

COMMUNITY CONSULTATION:<br />

This matter has been assessed under the Community Consultation Policy. The requirements<br />

for consultation have been satisfied under the statutory provisions <strong>of</strong> the <strong>Town</strong> Planning<br />

Scheme.<br />

ATTACHMENTS:<br />

1. Email from Telethon Speech and Hearing dated 3 August 2012.<br />

2. Aerial <strong>of</strong> site pre new construction and under construction.<br />

3. Landscape Plans<br />

<strong>Council</strong> Meeting 28 August 2012<br />

Prior to consideration <strong>of</strong> this item, Mr Ian Birch, Director Development and Sustainability, in<br />

accordance with Section 5.65 <strong>of</strong> the Local Government Act 1995, declared a financial interest<br />

in this matter.<br />

ADMINISTRATION RECOMMENDATION:<br />

Moved by Cr Langer, seconded by Cr King<br />

That:-<br />

(i)<br />

the Telethon Speech and Hearing Centre (TSH) be advised that <strong>Council</strong> APPROVES<br />

the parking and landscape proposal Option 2 attached that allows for 97 car<br />

parking bays subject to the following modifications:-<br />

(a)<br />

(b)<br />

three additional car bays be provided on the north side <strong>of</strong> Dodd Street in<br />

parallel configuration;<br />

a 1.8 metre continuous footpath be provided along the full width <strong>of</strong> the TSH<br />

frontage on the north side <strong>of</strong> Dodd Street;<br />

(ii)<br />

(iii)<br />

(iv)<br />

(v)<br />

(vi)<br />

the <strong>Town</strong> accepts the <strong>of</strong>fer by TSH to undertake the designs and construction<br />

process for Dodd Street, subject to the <strong>Town</strong>'s approval <strong>of</strong> the design and<br />

specifications;<br />

a 1.8 metre wide footpath is to be included in the works on the northern side <strong>of</strong> the<br />

verge. The <strong>Town</strong> will pay to the TSH a sum <strong>of</strong> $12,500 for the cost <strong>of</strong> the footpath<br />

construction;<br />

the indigenous themed landscaping proposal is accepted in principle. Detailed<br />

design, however, will need to ensure that necessary safety measures are<br />

addressed such as: sight lines for vehicles entering and leaving the site, CPTED<br />

principles <strong>of</strong> visibility and avoidance <strong>of</strong> trip hazards;<br />

on-going maintenance <strong>of</strong> the proposed landscaping areas that extend into the road<br />

reserve will be the responsibility <strong>of</strong> the TSH;<br />

the <strong>Town</strong> will not agree to occupation until this matter has been resolved to its<br />

satisfaction;<br />

(vii) the <strong>Town</strong> will pay to the TSH $120,000 to meet the <strong>Town</strong>’s commitment to funding<br />

the road carriageway component <strong>of</strong> the construction;<br />

H:\Ceo\Gov\<strong>Council</strong> <strong>Minutes</strong>\12 MINUTES\August 2012\D Item 10 Onwards.docx 211