EFIS-D100 Installation Guide - Dynon Avionics
EFIS-D100 Installation Guide - Dynon Avionics
EFIS-D100 Installation Guide - Dynon Avionics
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
TOOLS AND MATERIALS REQUIRED<br />
<strong>Dynon</strong> <strong>Avionics</strong> AOA/Pitot probe.<br />
Appendix<br />
Two plumbing lines (usually ¼” soft aluminum or plastic tubing) routed from the <strong>EFIS</strong>-<strong>D100</strong><br />
to the probe mounting location.<br />
Tubing interface hardware<br />
o Reference our wiki at wiki.dynonavionics.com for tubing interface hardware<br />
recommendations.<br />
#36 Drill and 6-32 tap<br />
AOA Pitot Mounting bracket. Models known to work well include:<br />
o Gretz Aero CBK12 (Chrome) and PBK12 (Paintable), available at<br />
gretz aero.com/mountbracket.html or from Aircraft Spruce.<br />
o SafeAir1 also makes a bracket with a joggled lip for the RV series. It is available<br />
from www.safeair1.com.<br />
Please follow these instructions explicitly as improper installation can result in permanent<br />
damage to your device and/or aircraft.<br />
HEATER CONTROLLER WIRING AND MOUNTING<br />
If you have purchased the heated version of the probe, please follow the instructions in this<br />
section. If you have purchased the unheated version of the probe, you may skip to the AOA/Pitot<br />
Probe Mounting section on page 7-28. Please follow these instructions explicitly as improper<br />
installation can result in permanent damage to your device and/or aircraft.<br />
Heater Controller Mounting<br />
The heater controller box should ideally be mounted close to the AOA/Pitot Probe. The box’s<br />
dimensions are found at right, for<br />
reference. When mounting the<br />
controller close to the probe, ensure<br />
that it is close enough for its wires to<br />
mate with the probe’s wires, with<br />
room for strain-relief. If you find it<br />
difficult to mount the controller in<br />
the wing, or simply wish for the<br />
controller to be mounted closer to<br />
the battery, you must extend the<br />
lines using the correct wire gauge as<br />
described in the Wiring section<br />
below.<br />
When the desired location is<br />
selected, secure the heater controller<br />
via the 4 mounting holes. Route the<br />
wiring between the probe, controller, panel, and power source, as described below.<br />
<strong>EFIS</strong>-<strong>D100</strong> <strong>Installation</strong> <strong>Guide</strong> 7-25