Appendix A<br />

Page 4/4<br />

Shatin Government Offices<br />

May 1998<br />

The BD issued PNAP No. 224 on “Superstructure Works — Measures for<br />

Public Safety”. PNAP No. 224, among other enhanced precautionary<br />

measures, required the construction of a double-deck hoarding with a<br />

projected, up-turn catch-platform.<br />

December 1998<br />

The FC approved the upgrading of the project “Shatin Government Offices<br />

Building” to Category A of the Public Works Programme.<br />

December 1998<br />

The ArchSD invited tenders for the STGO Contract and incorporated its<br />

hoarding requirements, which were based on the ArchSD’s standard<br />

drawings, into the tender documents as part of the Employer’s<br />

Requirements.<br />

July 1999<br />

The ArchSD awarded a design-and-build contract, the STGO Contract, to<br />

Contractor B for the construction of the STGO.<br />

September 1999<br />

The construction of a single-deck hoarding was completed in accordance<br />

with the Employer’s Requirements.<br />

July 2000<br />

The ArchSD discovered that there was a discrepancy between the<br />

ArchSD’s standard hoarding and the hoarding required by PNAP No. 224.<br />

December 2000<br />

For safety reasons, the ArchSD decided to upgrade the hoarding<br />

immediately to comply with the latest requirements of building works, i.e.<br />

PNAP No. 224.<br />

January 2001<br />

The ArchSD issued a variation order to Contractor B to modify the<br />

hoarding which had been constructed.