CONSTRUCTION OF GOVERNMENT OFFICE BUILDINGS ...
CONSTRUCTION OF GOVERNMENT OFFICE BUILDINGS ...
CONSTRUCTION OF GOVERNMENT OFFICE BUILDINGS ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Paragraphs<br />
Audit observations on fitting-out works<br />
in the CSWGO for the MEB<br />
Audit recommendations on fitting-out works<br />
in the CSWGO for the MEB<br />
Response from the Administration<br />
3.6 – 3.8<br />
3.9<br />
3.10 – 3.12<br />
PART 4:<br />
PROVISION <strong>OF</strong> A FOOTBRIDGE FOR THE CSWGO<br />
4.1<br />
Decision to construct the footbridge<br />
Construction of the footbridge before obtaining approval<br />
Audit observations on provision<br />
of a footbridge for the CSWGO<br />
Audit recommendations on provision<br />
of a footbridge for the CSWGO<br />
Response from the Administration<br />
4.2 – 4.7<br />
4.8 – 4.11<br />
4.12 – 4.13<br />
4.14 – 4.15<br />
4.16 – 4.17<br />
PART 5:<br />
MODIFICATION <strong>OF</strong> THE HOARDING WORKS<br />
<strong>OF</strong> THE STGO<br />
5.1<br />
Practice Note for Authorised Persons<br />
and Registered Structural Engineers No. 224<br />
Hoarding specified in the STGO Contract<br />
Modification works of hoarding<br />
of STGO construction site<br />
Audit observations on modification<br />
of the hoarding works of the STGO<br />
Audit recommendations on modification<br />
of the hoarding works of the STGO<br />
Response from the Administration<br />
5.2 – 5.3<br />
5.4<br />
5.5 – 5.6<br />
5.7<br />
5.8<br />
5.9<br />
Appendix A:<br />
Chronology of key events<br />
Appendix B:<br />
Acronyms and abbreviations<br />
— ii —