XXI. WATER SUPPLY & SANITATION - Planning
XXI. WATER SUPPLY & SANITATION - Planning XXI. WATER SUPPLY & SANITATION - Planning
The following works will be taken up during the year 2004-05 1. Replacement of 100/150 mm dia C.I W/M in Sadh Nagar (4.34 lac). 2. Extension of W/S by P/L/J C.I water main in C-3 & C-1 Block ME area (Rs. 3.91 lacs) 3. Improvement of water supply by P/L 100 mm dia C.I w/line Ganesh Park (Rs. 3.28 lacs). 4. Replacement of damaged 5” dia AC W/line by 150 mm dia C.I Kakrola Road (Rs. 8.21 lacs). 5. Replacement of 100 mm dia AC w/line by p/laying 100 mm dia C.I w/main Gali No. 8 Raj Nagar (Rs. 2.42 lacs). 6. Improvement of water supply in Kailashpuri Extn. by 150 mm dia CI in Nasipur Constituency (Rs. 2.77 lacs). 7. Removal of contamination by replacing AC W/line in Sector 1 Dwarka (Rs. 2.51 lacs). 8. Extension of W/supply by P/L/J 100 m dia W/main in remaining part of Som Bazar (Rs. 6.30 lacs). 9. Improvement of water supply of Chankya place and Janak Puri (Rs. 3.08 lacs). 10. Improvement of water supply in Gali No. 23-A & B Sadh Nagar (Rs. 2.23 lacs). 11. Replacement of AC W/line in Najafgarh Zone (Rs. 58.48 lacs). 12. Replacement of 100 dia C.I water line at Bagdola Road (Rs. 1.85 lacs). 13. Improvement of water supply in Jagat Puri (Rs. 1.92 lacs). 14. Replacement of 100 mm dia AC P/L in Gali East Sagar Pur (Rs. 1.99 lacs). 15. Replacement of 100 mm dia AC P/L in Parapuri (Rs. 2.84 lacs). 16. Replacement of 100 mm dia C.I water line in Chhatriwala arg (Rs. 2.75 lacs). 17. Replacement of 100 mm dia AC W/line at Raj Nagar H Block 23 (Rs. 2.89 lacs), Hanuman Mandir Raj Nagar (Rs. 2.54 lacs). 18. Replacement of old damaged PVC pipe line by 100 dia CI in Aya Nagar (Rs. 4.14 lacs), Jauna Pur & andi Village (Rs. 4.18 lacs), Chhattarpur Village (Rs. 4.31 lacs), Pocket A-3 Kalkaji (Rs. 4.81 lacs), LIG Flats Pul Pehladpur (Rs. 4.56 lacs), UGT Tank Tughlakabad (Rs. 4.41 lacs), Devli Road (Rs. 2.60 lacs), Pocket No. 14 Dakshinpuri Extn. (Rs. 3.01 lacs), Gali No. 8 Tughlakabad Extn. (Rs. 3.12 lacs), Kalkaji Extn. (Rs. 4.71 lacs), Gali No. 26-B 6
Tughlakabad Extn. (Rs. 2.91 lacs), Sultan Pur (Rs. 4.94 lacs), A-Block Booster at Harket Nagar (Rs. 2.84 lacs), F-Block Okhla Phase II (Rs. 4.46 lacs), Badarpur Village (Rs. 4.30 lacs). 19. Replaceent of 4” dia PVC/AC water ain by 150 dia CI water ain Taxi Stand Okhla (Rs. 5.46 lacs), ohalla Aya Nagar (Rs. 5.11 lacs), D-Block Tigri Extn. (Rs. 5.33 lacs), Kalkaji Extn. (Rs. 3.69 lacs). 20. Commissioning of new booster at TA Block Tughlakabad Extn. (Rs. 8.01 lacs). 21. Replacement of 6” dia AC water line by 150 mm dia CI at Madhya Marg Tughlakabad Exn. (Rs. 4.74 lacs), Hari Nagar (Rs. 3.07 lacs), 22. Replacement of 4 Nos. container of 10,000 litres capacity mounted tanker (Rs. 4.99 lacs) 23. The replacement of old warn out pumps and motors at water pumping stations(E&M work). 24. The target of about 150 KM of old water main is fixed and about 66 KMs has been replaced and the remaining work will be completed during the year 2003-04. 25. Replacement of 200mm dia .C.(Damaged_ water main from H/O Baljeet Singh to culvert at Sanouth Road in Sanouth Village. 26. Replacement of AC W/L by L/J 100mm dia C.I. W/L at east of UGR DDA flats Gulabi Bagh. 27. Imp. Of water pressure by L/J 100mm dia C.I. water main in Hanuman Mandir Lane Shakti Nagar. 28. Imp. Of water pressure in block B of pocket 5,6,7,8,9 Sector-4,Rohini. 29. Imp. Of water pressure in pocket C-II & C-13 Sector _ 3, Rohini. 30. Augmentation of W/P in PKT H- 17, G-19 & F-24 Sector – 7 Rohini. 31. Imp. Of W/P in pockets D-12 , D-13, D-14 in Sector -7 , Rohini 32. Augmentation of W/P PKT D-12, D-13,D-14 Sector – 8 , Rohini. 33. Imp. Of W/P in pockets C-7 , C-9 in Sector – 8 Rohini. 34. Replacement of damaged A.C water line 150 mm dia near new culvert to Pall mor. 35. Replacement of 500 mm dia damaged A.C. Pressure pipe from Karala Staff Quarters Gate to kalian singh shop in main Road Karala. 7
- Page 1 and 2: XXI. WATER SUPPLY & SANITATION Sche
- Page 3 and 4: augmented to 469 MGD and 472 MGD re
- Page 5: 9. P/L C.I water line in Kanwar Sin
- Page 9 and 10: 55. Repl. Of 700m dia PSC damaged p
- Page 11 and 12: 100. P/L/J 750-450 mm dia Periphera
- Page 13 and 14: 3.8 lacs), Tughlakabad Extn. Gali N
- Page 15 and 16: the plants important machines inclu
- Page 17 and 18: connected UGR-cum-BPS at Palla and
- Page 19 and 20: 8 -do- in Seelampur Constituency at
- Page 21 and 22: An outlays of Rs. 490.00 lakh is ap
- Page 23 and 24: 11 For 800 mm dia inlet main for Vi
- Page 25 and 26: 21 Large scale testing of water sam
- Page 27 and 28: Augmentation of Water Supply in Meh
- Page 29 and 30: Trans Yamuna Area Development board
- Page 31 and 32: ) Industrial, commercial and commun
- Page 33 and 34: 12. Out of 44 Resettlement Colonies
- Page 35 and 36: trunk sewers due to widening of car
- Page 37 and 38: 4. STORM WATER DRAINAGE & ANTI FLOO
- Page 39 and 40: 8. SEWERAGE FACILITIES IN URBAN VIL
- Page 41 and 42: 4 Rehabilitation of 1600 mm dia Har
- Page 43 and 44: ANNEXURE - II B. SEWAGE TREATMENT P
- Page 45 and 46: 64. Shifting of rising main of Adar
- Page 47 and 48: 5 Desilting of Model Town RCC Drain
- Page 49 and 50: 13 Diversion of sewer main DDA Flat
- Page 51 and 52: 65 -do- in balance portion of Chand
- Page 53 and 54: Therefore, a systematic programme t
- Page 55 and 56: CPWD Nursery, Water Boosting Statio
Tughlakabad Extn. (Rs. 2.91 lacs), Sultan Pur (Rs. 4.94 lacs), A-Block<br />
Booster at Harket Nagar (Rs. 2.84 lacs), F-Block Okhla Phase II (Rs. 4.46<br />
lacs), Badarpur Village (Rs. 4.30 lacs).<br />
19. Replaceent of 4” dia PVC/AC water ain by 150 dia CI water ain Taxi Stand<br />
Okhla (Rs. 5.46 lacs), ohalla Aya Nagar (Rs. 5.11 lacs), D-Block Tigri Extn.<br />
(Rs. 5.33 lacs), Kalkaji Extn. (Rs. 3.69 lacs).<br />
20. Commissioning of new booster at TA Block Tughlakabad Extn. (Rs. 8.01<br />
lacs).<br />
21. Replacement of 6” dia AC water line by 150 mm dia CI at Madhya Marg<br />
Tughlakabad Exn. (Rs. 4.74 lacs), Hari Nagar (Rs. 3.07 lacs),<br />
22. Replacement of 4 Nos. container of 10,000 litres capacity mounted tanker<br />
(Rs. 4.99 lacs)<br />
23. The replacement of old warn out pumps and motors at water pumping<br />
stations(E&M work).<br />
24. The target of about 150 KM of old water main is fixed and about 66 KMs has<br />
been replaced and the remaining work will be completed during the year<br />
2003-04.<br />
25. Replacement of 200mm dia .C.(Damaged_ water main from H/O Baljeet<br />
Singh to culvert at Sanouth Road in Sanouth Village.<br />
26. Replacement of AC W/L by L/J 100mm dia C.I. W/L at east of UGR DDA flats<br />
Gulabi Bagh.<br />
27. Imp. Of water pressure by L/J 100mm dia C.I. water main in Hanuman Mandir<br />
Lane Shakti Nagar.<br />
28. Imp. Of water pressure in block B of pocket 5,6,7,8,9 Sector-4,Rohini.<br />
29. Imp. Of water pressure in pocket C-II & C-13 Sector _ 3, Rohini.<br />
30. Augmentation of W/P in PKT H- 17, G-19 & F-24 Sector – 7 Rohini.<br />
31. Imp. Of W/P in pockets D-12 , D-13, D-14 in Sector -7 , Rohini<br />
32. Augmentation of W/P PKT D-12, D-13,D-14 Sector – 8 , Rohini.<br />
33. Imp. Of W/P in pockets C-7 , C-9 in Sector – 8 Rohini.<br />
34. Replacement of damaged A.C water line 150 mm dia near new culvert to Pall<br />
mor.<br />
35. Replacement of 500 mm dia damaged A.C. Pressure pipe from Karala Staff<br />
Quarters Gate to kalian singh shop in main Road Karala.<br />
7