03.01.2015 Views

XXI. WATER SUPPLY & SANITATION - Planning

XXI. WATER SUPPLY & SANITATION - Planning

XXI. WATER SUPPLY & SANITATION - Planning

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

31. Construction of 16 MGD STP at Okhla.<br />

32. Reconditioning of sludge drying bed of 24 MGD STP at Okhla.<br />

33. Construction of 5 MGD STP at Mehrauli.<br />

34. Cost of Boundary Wall at STP Mehrauli.<br />

35. Interconnecting RCC Channel to carry effluent in 40 MGD SPS Okhla.<br />

36. Construction of retaining wall at Mehrauli STP.<br />

37. 900 mm dia outfall sewer for Mehrauli STP.<br />

38. Construction of 20 MGD STP at Barapulla Nallah (Nizamudeen East).<br />

39. Construction of 12.5 MGD SPS at Mehrauli.<br />

40. Construction of 14 MGD SPS at Dakshin Puri.<br />

41. L/J 1200 mm dia PSC Rising Main Misc. like escalation.<br />

42. Construction of 3 MGD STP at Vasant Kunj.<br />

43. Consultancy Charges for Vasant Kunj<br />

44. Consultancy charges of 5 MGD STP Ghitorni.<br />

45. Construction of 21.3 MGD SPS at Tughlakabad.<br />

46. Construction of M/S Grill Boundary Wall along Sarita Vihar SPS.<br />

47. Supply of 1200 mm dia PSC R/Main for SPS Sarita Vihar.<br />

48 Construction of 33MGD SPS at Sarita Vihar and Rain Water Harvesting at Sarita<br />

Vihar.<br />

49. Construction of Security Guard Room.<br />

50. Engineering Consultancy Charges for STP & SPS at Pappan Kalan.<br />

51. Construction of 20 MGD STP at Pappan Kalan.<br />

52. Construction of stone massonary Boundary Wall for STP Pappan Kalan.<br />

53. P/L/J PVC pipe line at 20 MGD STP at Pappan Kalan.<br />

54. Other Misc. works.<br />

55. Construction of 15 MGD SPS at Jeewan Park.<br />

56. Construction of stone massonary Boundary Wall at Coronation Pillar.<br />

57. P/L rising main of Adarsh Nagar SPS.<br />

58. STP Coronation Pillar Phase-III.<br />

59. STP Coronation Pillar Phase-I-B<br />

60. STP Coronation Pillar Phase-I-A.<br />

61. STP Coronation Pillar Phase-II-B.<br />

62. STP Coronation Pillar PhaseII-A.<br />

63. Restoration of damaged portion of Boundary Wall of Adarsh Nagar SPS.<br />

44

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!