trunk sewers due to widening of carriage way of a number of roads due to which large<br />

trunk sewers have come under the main carriage way. This phenomenon has<br />

accelerated the degradation of sewer lines.<br />

In view of the above to give relief to local areas substantial quantity of the<br />

sewage, which is otherwise required to be conveyed to the respective STPs, is<br />

discharged into the open drains. It is estimated that about 91 K.Ms. of Trunk Sewers<br />

need desilting and rehabilitation including repair of settlement. Some of the important<br />

sewers in this category are Ring Road Trunk Sewer, Indian Express Sewer, Sita Ram<br />

Bazar Sewer, University Trunk Sewer, North Trunk Sewer, Harsh Vihar – Haider Puri<br />

Sewer, West Delhi Sewer, Outfall sewer from Q Point to Kilokari SPS, Sewer along<br />

Arbindo Marg, Cross Connection No. 2,3 & 4, Karol Bagh Sewer, Bela Road Sewer.<br />

The work for desilting/rehabilitation in 20 KM length has already been completed & is in<br />

progress in 10.5 KM length, which is likely to be completed by June 2004. Further<br />

action is being taken to desilt and rehabilitate the remaining Trunk Sewers.<br />

Rehabilititation of Ring Road Trunk Sewer and Bela Road Trunk sewer are included<br />

under the YAP II.<br />

(b) New Trunk Sewers :<br />

New Trunk Sewers are also required to be laid to extend sewerage facilities to new<br />

areas (Unauthorized/Regularized Colonies, Urban Villages etc.) and cope up the<br />

increased waste water generation due to increase in population and water supply.<br />

Some of these are Trunk Sewer along Wazirabad Road in East Delhi, East Punjabi<br />

Bagh. Work for Dabri Trunk Sewer and Sagarpur Trunk Sewer is in progress.<br />

List of major schemes/ works is given bellow at ANNEXURE – I.<br />

An outlay of Rs. 7000.00 lakh is approved for Annual Plan 2004-05.<br />

2. SEWAGE TREATMENT PLANTS AND ANCILLIARY WORKS (Rs. 9000.00 lakh)<br />

A provision of Rs 9000 lacs has been made in the Annual Plan 2004-05.<br />