) Industrial, commercial and community requirement --------- 47 lpcd.<br />
c) Fire protection based on 1% of the total demand---- 3 lpcd.<br />
d) Floating population and special use like hotel & embassies – 52 lpcd.<br />
The total demanded 274 lpcd (60 gpcd).<br />
6. The total water requirement for the X th five year plan works out to 1050 MGD. It<br />
is planned to augment the water supply to 919 MGD by the end of Xth Plan.<br />
Balance requirement of about 130 MGD is expected to be met from private<br />
sources of extracting the ground water.<br />
7. DJB have entrusted in Dec 2001 a study on measurement of discharge<br />
flowing in 17 major drains out falling into river Yamuna. The results based on<br />
measurements for the period from April to June 2001, have indicated that<br />
total wastewater flowing through Delhi is about 680 MGD.<br />
8. S.T.P. CAPACITY:- The DJB had entrusted a study on the upgradation of<br />
sewerage system of NCT of Delhi to cater to the requirements in 2006 and<br />
2011. As per their draft final report treatment capacity of 726.4 MGD will be<br />
required by 2006 and 803.4 MGD will be required by 2011. The DJB plans to<br />
create an additional capacity of 293 MGD by 2011, thus augmenting the<br />
treatment capacity to 805.4 MGD.<br />
9. The plant-wise sewerage treatment capacity’s as targeted for the X plan &<br />
achievement till March 2002 & targets for 2002-03 & 2003-04 are given as under:-All<br />
the figures are cumulative & in MGD<br />
S.NO Plant’s 10 th Plan<br />
2002-07<br />
target<br />
Ach.upto<br />
March<br />
2003<br />
Ach.during<br />
2003-04<br />
Annual Plan<br />
proposal<br />
2004-05<br />
1 2 3 4 5 6<br />
1. Okhla 170 140 140 140<br />
2. Keshopur 72 72 72 72<br />
3. Coronation Pillar 50 40 40 40<br />
4. Rithala 110 80 80 80<br />
5. Kondli<br />
(Ph.I,II,III&IV)<br />
90 45 45 45<br />
31