Trans Yamuna Area Development board (Rs. 1000.00 lakh)<br />
The following works will be taken up during the year 2004-05<br />
1. For balance works of UGR/BPS at Mandawali, Nand Nagari, Shastri park, Gazipur,<br />
Surajmal Vihar<br />
2. For inlet mains for UGRs (Estimated Cost- 75 lacs)<br />
For boundary wall Surajmal Vihar. (Estimated Cost- 10 lacs)<br />
3 For balance works of UGR/BPS at Mandawali, Nand Nagari, Shastri park, Gazipur,<br />
Surajmal Vihar<br />
4. For inlet mains for UGRs (Estimated Cost- 75 lacs)<br />
5. For boundary wall Surajmal Vihar. (Estimated Cost- 10 lacs)<br />
6. For Overflow arrangements for UGRs in Phase-I. (Estimated Cost- 25 lacs)<br />
7. It is proposed to lay new water lines & replacement of old lines about 70 Kms in<br />
TYA<br />
8. Const. of 10.2 ML UGR/BPS at Jagatpuri Shd(Contd. work).<br />
An outlay of Rs. 1000.00 lakh is approved for Annual Plan 2004-05.<br />
Information Technology Infrastructure (Rs. 50.00 lakh)<br />
An outlay of Rs. 50.00 lakh is approved for the implementipon of the Plan scheme<br />
during the year 2004-05<br />
Details modalities of the scheme being worked out by D.J.B.<br />
Capacity building (Rs. 100.00 lakh)<br />
An amount of Rs. 100.00 lakh is approved for the implementation of the Plan scheme<br />
the year 2004-05. Detail modalities of the scheme are being worked out.<br />