11 For 800 mm dia inlet main for Vishwakarma Park. . (Estimated Cost-<br />

220.44 lacs)<br />

12 For Inlet mains for UGRs of Ph-II. . (Estimated Cost- 75 lacs)<br />

13 For balance works of Transmission mains from SVWTP in Phase-I, II, III.<br />

(Estimated Cost-21835 lacs)<br />

14 For 5 no. UGRs/BPS in South Delhi. (Estimated Cost- 1150 lacs for civil<br />

works only)<br />

For Sonia Vihar W.T.P. (Estimated Cost- 11923 lacs for civil works only)<br />

The work of construction of 140 MGD WTP is in full swing. Power Supply Co. has<br />

been requested to provide electric connection for operation of the plant 2 is likely to be<br />

completed by October, 2004.<br />

11 UGRs/BPS on command of this plant in South Delhi and TYA for which work order<br />

for E&M as well as Civil has since been issued and the work is to be completed on top<br />

priority.<br />

An outlay of Rs 11000 lacs has been approved for Annual Plan 2004-05.<br />

17 Const. of 40 MGD WTP at Nangloi (Rs. 180.00 lakh)<br />

The following works will be taken up during the year 2004-05<br />

1 For arbitration awards, construction of storm water pumping station and<br />

improvement works<br />

2 For arbitration awards and construction of storm water pumping station.<br />

This plant was constructed by M/s NBCC and there are certain inherent defects<br />

which are to be rectified besides certain modification works to keep the plant in<br />

operation<br />

An outlay of Rs. 180 lacs has been approved for Annual Plan 2004-05.<br />