100. P/L/J 750-450 mm dia Peripheral main from Nangloi OHT to Mundaka<br />
minor.<br />
101. Cost of Gram Sabha Land allotted at Kirari, Mohdpur Majri and Sultanpur<br />
Dabas.<br />
102. Const. of 3.5 ML capacity UGR & BPS at Baljeet Nagar (Balance work).<br />
103. C/o 47 ML Capacity UGR & BPS at Nilothi.<br />
104. P/L/J 100mm to 500mm dia CI water main from tubewells in Iradat Nagar<br />
to existing 1000mm dia water main at Bawana Narela Road.<br />
101. C/o R R Masonary wall at Baljeet nagar.<br />
There are two pumping stations namely Malviya Nagar and Baljeet Nagar<br />
work of which is already awarded. E&M work will be started as soon as civil<br />
work are ready.<br />
There are two UGRs Ujjwa and Mohan Garden are in west Delhi. Civil works<br />
already awarded and for E&M tenders have been floated.<br />
Bulk Water Meters<br />
Tender for supply,installations and commissioning of bulk water Meter for<br />
measurement at various water treatment plants including O&M for 5 years have<br />
already been received and are under scrutiny and are likely to be finalized soon.<br />
The work will be taken up during 2004-2005.<br />
An amount of Rs. 8000.00 lakh is approved for Annual Plan 2007-05<br />
3. Improvement of Existing water works:- ( Rs. 2360.00 lakh)<br />
i). During the year 2003-04, 150 Kms. new water lines was proposed to be laid. 85<br />
Kms. new water lines have been laid up to March 2003 and remaining work is to<br />
be completed during this year.<br />
ii). Construction of small Under Ground Reservoir and Booster Pumping Stations at<br />
various places have been proposed to rationalized and improve water pressure<br />
during the year 2004-05.<br />