02.01.2015 Views

Sensys Stud Trial - Sensys Networks

Sensys Stud Trial - Sensys Networks

Sensys Stud Trial - Sensys Networks

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Sensys</strong> <strong>Stud</strong> <strong>Trial</strong><br />

6.5 Cost Comparison, Typical Installation Including Lifecycle<br />

Costs<br />

Due to resealing and general determination of carriageways it is estimated that during the 10<br />

year lifetime of a <strong>Sensys</strong> stud the loops will have to be replaced once. This means that the cost<br />

of loops can be doubled for the same period of time. Therefore the 10 year lifetime costs can be<br />

estimated to be.<br />

6 Lanes Spread Over 2 Carriageways<br />

<strong>Sensys</strong> $27,902.17 as previously calculated<br />

Loops $45,579.47 as shown below<br />

Description Cost Qty Total Note<br />

Install loops 3 lanes $ 8,090.00 4 $ 32,360.00 Detail found in section 5.1<br />

Cut NB tails across<br />

carridgeway $ 522.00 1 $ 522.00<br />

Hardware Supply $ 10,478.13 1 $ 10,678.47 Detail found in section 5.3<br />

Install Hardware in Existing<br />

Cabinet $ 87.00 4 $ 348.00 2 techs 2 hours<br />

Install tody $ 127.00 2 $ 254.00 1 in centre island, 1 by cabinet<br />

Trench from toby to cabinet $ 58.00 10 $ 580.00 Assume cabinet 10m from toby<br />

Cable from toby to cabinet $ 21.00 15 $ 315.00 Extra 5m for slack<br />

Connect and test $ 87.00 6 $ 522.00 2 techs 3 hours<br />

$ 45,579.47<br />

8 Lanes Spread Over 2 Carriageways<br />

<strong>Sensys</strong> $32,868.85 as previously calculated<br />

Loops $35,124.47 as shown below<br />

Description Cost Qty Total Note<br />

Install loops 4 lanes $ 5,450.00 4 $ 21,800.00 Detail found in section 5.1<br />

Cut NB tails across<br />

carridgeway $ 522.00 1 $ 522.00<br />

Hardware Supply $ 10,478.13 1 $ 10,678.47 Detail found in section 5.3<br />

Install Hardware in Existing<br />

Cabinet $ 87.00 4 $ 348.00 2 techs 2 hours<br />

Install tody $ 127.00 2 $ 254.00 1 in centre island, 1 by cabinet<br />

Trench from toby to cabinet $ 58.00 10 $ 580.00 Assume cabinet 10m from toby<br />

Cable from toby to cabinet $ 28.00 15 $ 420.00 Extra 5m for slack<br />

Connect and test $ 87.00 6 $ 522.00 2 techs 3 hours<br />

$ 35,124.47<br />

Commercial in Confidence Page 30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!