29- Failure <strong>to</strong> Supply and Risk Purchase Clasue<br />

If the supplier fails <strong>to</strong> <strong>supply</strong> any s<strong>to</strong>res in accordance with the terms and conditions herein provided<br />

and those agreed with the Undertakings, or fails <strong>to</strong> replace the s<strong>to</strong>res as may be rejected by the Undertakings,<br />

within the time stipulated, the Undertakings shall at the risk and cost <strong>of</strong> supplier and without any notice or<br />

reference <strong>to</strong> him be entitled <strong>to</strong> purchase such s<strong>to</strong>res (<strong>of</strong> the same specifications) <strong>for</strong> any other source and at<br />

such price as the undertaking shall in their sole discretion think fit and if such price shall exceed the rate set<br />

out in rate contract, the supplier shall be liable <strong>to</strong> pay <strong>to</strong> the Undertakings the difference between the price at<br />

which such s<strong>to</strong>res have been purchased by athe Undertakins and at the price set out in the contract plus 10%<br />

overheads. The risk purchase and payment <strong>of</strong> difference with overheads in terms there<strong>of</strong> shall not absolve the<br />

supplier <strong>for</strong>m the liability <strong>to</strong> pay damage as may be suffered and claimed by the Undertakings due <strong>to</strong> the<br />

failure <strong>of</strong> the supplier <strong>to</strong> make timely and proper delivery <strong>of</strong> the contracted s<strong>to</strong>res.<br />

30- Force Majeure Clause<br />

(5)<br />

Provided however, if such failure referred <strong>to</strong> in clause (36) above shall have arised <strong>for</strong>m an act <strong>of</strong><br />

God or disorganization <strong>of</strong> public <strong>transport</strong>, thunder, flood, earthquake or any other inevitable or un<strong>for</strong>eseen<br />

circumstance beyond human control including any casue directly or indirectly interfering with the <strong>supply</strong> <strong>of</strong><br />

raw material such as limitation <strong>of</strong> import licence or any other cause which the UPSRTC may admit as<br />

reasonable ground <strong>for</strong> non-<strong>supply</strong> in time as may be justified by the circumstances <strong>of</strong> the case, the UPSRTC<br />

may <strong>for</strong>ego the claim <strong>for</strong> any such loss or damage.<br />

31- Liquidated Damages<br />

If the contrac<strong>to</strong>r fails <strong>to</strong> deliver the s<strong>to</strong>res or any installment there<strong>of</strong> within the period fixed <strong>for</strong> such<br />

delivery or at any time repudiates the contract be<strong>for</strong>e the expiry <strong>of</strong> such period, the Undertaking may without<br />

prejudice <strong>to</strong> the other rights <strong>of</strong> the purchaser <strong>to</strong> recover damages <strong>for</strong> breach <strong>of</strong> the contract, recover from the<br />

contrac<strong>to</strong>r as agreed liquidate damages and not by way <strong>of</strong> penalty a sum equivalent <strong>to</strong> 2% <strong>of</strong> the price <strong>of</strong> any<br />

s<strong>to</strong>res which the Supplier has failed <strong>to</strong> deliver within the period fixed <strong>for</strong> the delivery in the schedule <strong>for</strong> each<br />

month or part <strong>of</strong> a month during which the delivery <strong>of</strong> such s<strong>to</strong>re may be in arrears, where delivery there<strong>of</strong> is<br />

accepted after expiry <strong>of</strong> the a<strong>for</strong>esaid period subject <strong>to</strong> the conditions that the damages <strong>to</strong> be calculated shall<br />

be limited <strong>to</strong> 10% <strong>of</strong> the value <strong>of</strong> delayed supplies.<br />

32- Service <strong>of</strong> Notice<br />

Any Notice required <strong>to</strong> be given under any <strong>of</strong> the <strong>for</strong>egoing Clause shall be deemed <strong>to</strong> have been<br />

given and served if sent <strong>to</strong> the supplier by registered Post/Speed Post/Courier at the address given in the<br />

<strong>tender</strong> <strong>for</strong>m or at any other address subsequently notified by the supplier.<br />

33- If the higher rates are <strong>of</strong>fered in <strong>com</strong>parison <strong>to</strong> previous <strong>tender</strong>, then the rate will applicable only<br />

after <strong>supply</strong>ing the <strong>to</strong>tal back order quantity.<br />

34- (a) If any <strong>tender</strong>er <strong>of</strong>fers a km guarantee which is more than the km guarantee specified by<br />

UPSRTC in this case 33,000 km then CPKM <strong>of</strong> the <strong>tender</strong>er shall be calculated on the <strong>of</strong>fered Km.<br />

Guarantee<br />

(b) Formula <strong>of</strong> CPKM Calculation<br />

Nett Bill Rate* (Material Cost Per Tyre)<br />

KM Guarantee<br />

*(Material Cost <strong>of</strong> Tread Rubber Belt+Bonding Gum + Cement)<br />

-35- The proprie<strong>to</strong>r who has more than one Firm in different Names then the different Firm shall<br />

be treated as one and order will be place accordingly.<br />

36- CORRUPT OR FRAUDULENT PRACTICES<br />

The Bidders and their respective <strong>of</strong>ficers, employees, agents and advisers shall observe the selected<br />

standard <strong>of</strong> ethics during the Tender process and subsequent <strong>to</strong> the issue <strong>of</strong> the Tender and during the<br />

subsistence <strong>of</strong> the Agreement. Not with standing anything <strong>to</strong> the contrary contained herein, or in the Tender<br />

or the Agreement, the Authority may reject a Bid, withdraw the Tender terminate the Agreement, as the case<br />

may be, without being liable in any manner whatsoever <strong>to</strong> the Bidder or Contrac<strong>to</strong>r, as the case may be, if it<br />

determines that the Bidder or Contrac<strong>to</strong>r, as the case may be, has, directly or indirectly or through an agent,<br />

engaged in corrupt practice, fraudulent practice, coercive practice, undesirable practice or restrictive practice<br />

in the Tender Process. In such an event, the Authority shall be entitled <strong>to</strong> <strong>for</strong>feit and appropriate the EMD or<br />

Bid Security, as the case may be, as Damages, without prejudice <strong>to</strong> any other right or remedy that may be<br />

available <strong>to</strong> the Authority under this Tender Document and /or the Agreement, or otherwise.<br />

Contd…6<br />

Downloaded from<br />

www.upsrtc.<strong>com</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!