02.01.2015 Views

tender for supply of t.r.m. to u.p. state road transport ... - Upsrtc.com

tender for supply of t.r.m. to u.p. state road transport ... - Upsrtc.com

tender for supply of t.r.m. to u.p. state road transport ... - Upsrtc.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

(10)<br />

TECHNICAL BID<br />

(Condition <strong>to</strong> be filled by the Firm)<br />

ANNEXURE “A”<br />

Sl. STATUS OF THE FIRM Firm’s Remarks<br />

YES / NO<br />

1 Only those Tenderer whom are Manufacturing Tread Rubber (STM/PTR) as per<br />

ASRTU Specification No. AS:272:69:JULY:2005 (Revised up<strong>to</strong> Date) are eligible<br />

<strong>for</strong> participating in <strong>tender</strong>. Those Tenderer who claim <strong>to</strong> be Manufacturing Tread<br />

Rubber (STM/PTR) as per ASRTU Specification No. AS:272:69:JULY:2005<br />

(Revised up<strong>to</strong> Date), supplier must enclose documentary evidence <strong>for</strong> the same<br />

BRAND <strong>to</strong> consider their <strong>tender</strong>. Those who fail <strong>to</strong> submit the documentary evidence<br />

as above shall not be considered<br />

2 Only those Tenderer (Old Suppliers) are eligible <strong>for</strong> qualifying in Technical Bid who<br />

has CIRT Pune Test Report Pass %age 65 or above. The Test Report period <strong>for</strong><br />

consideration will be taken from last Three years received Test Report till the<br />

opening <strong>of</strong> Tender Date<br />

3 Acceptance <strong>of</strong> Unconditional Kilometer Guarantee as per clause “22” <strong>of</strong><br />

General terms & conditions <strong>of</strong> Terder Form is must<br />

YES / NO<br />

YES / NO<br />

4 Acceptance <strong>for</strong> Firmness <strong>of</strong> the rate <strong>for</strong> One Year is must YES / NO<br />

5 Acceptance <strong>of</strong> the payments terms as per Clause “3” Through RTGS is must YES / NO<br />

6 In case the <strong>of</strong>fer <strong>of</strong> the firm is accepted the firm will have <strong>to</strong> submit a Security YES / NO<br />

deposit in shape <strong>of</strong> Bank Guarantee/ Bank Draft <strong>of</strong> 10% <strong>of</strong> the Order Value adjusting<br />

EMD, be<strong>for</strong>e <strong>com</strong>mencing <strong>of</strong> <strong>supply</strong>, the validity <strong>of</strong> the Bank Guarantee <strong>of</strong> a<br />

Nationalized Bank should be Three Years. In case <strong>of</strong> Security Deposited in Bank<br />

Draft, Bank Draft Amount should be withheld <strong>for</strong> Three Years<br />

7 Acceptance <strong>for</strong> submiting the Earnest Money with the <strong>tender</strong> (General Terms &<br />

Condition No. 3 is must)<br />

8 Only those <strong>tender</strong>er will qualify technically whose capability <strong>to</strong> <strong>supply</strong> is 33% <strong>of</strong><br />

<strong>of</strong>fered quantity <strong>to</strong> UPSRTC.<br />

Fac<strong>to</strong>ry Inspection shall be done <strong>for</strong> the firm/s who are <strong>com</strong>ing <strong>for</strong> the first time and<br />

a demand draft <strong>of</strong> Rs. 20,000 (twenty thousand) has <strong>to</strong> be enclosed along with<br />

Technical Bid <strong>for</strong> the same<br />

9 Accceptance <strong>of</strong> the Firm <strong>to</strong> <strong>supply</strong> the material as per the required size &<br />

specification as mentioned in bill <strong>of</strong> Quantity is must<br />

10 Acceptance <strong>to</strong> make the supplies at the locations Presently at ELGI Plant. All supplly<br />

should be make on terms F.O.R. Sharanpur, Bareilly, Kanpur, Allahabad, Lucknow,<br />

Etawa, Moradabad, Aligarh, Faizabad and Agra & <strong>for</strong> INDAG plant FOR Ghaziabad<br />

and Gorakhpur<br />

11 Firm must be ready <strong>to</strong> give the guarantee <strong>of</strong> quantity and quality <strong>of</strong> supplies as<br />

specified by UPSRTC<br />

12 The Firm must be ready <strong>to</strong> take back the supplied item, if it is rejected due <strong>to</strong><br />

technical reasons<br />

YES / NO<br />

YES / NO<br />

YES / NO<br />

YES / NO<br />

YES / NO<br />

YES / NO<br />

13 Engraved Brand Name on supplied Belt is must YES / NO<br />

14 1- The Firm’s Minimum Average Turnover should be 2.5 crores <strong>for</strong> previous 3<br />

Financial years (2009-10, 2010-11, 2011-12).<br />

YES / NO<br />

2- The Firm/s having minimum average 1.5 crores annual turnover <strong>for</strong><br />

previous 3 Financial years (2009-10, 2010-11, 2011-12) shall be considered<br />

only <strong>for</strong> 30% <strong>of</strong> Total requirement if they are L-1 on the basis <strong>of</strong> CPKM anf<br />

if they have capacity <strong>to</strong> <strong>supply</strong> 1/3 <strong>of</strong> <strong>of</strong>fered quantity <strong>to</strong> UPSRTC .<br />

3- Turnover and T.R.M <strong>supply</strong> experience <strong>to</strong> STU’s shall not apply <strong>for</strong> the<br />

firm/s established within 12 months from date <strong>of</strong> <strong>tender</strong>. Such Firms shall<br />

be considered only <strong>for</strong> 10% <strong>of</strong> the <strong>of</strong>fered quantity if they are L-1 on basis <strong>of</strong><br />

CPKM and if they have capacity <strong>to</strong> <strong>supply</strong> 1/3 <strong>of</strong> <strong>of</strong>fered quantity <strong>to</strong><br />

UPSRTC<br />

15 Firm should also have a experience <strong>of</strong> suppling Tyre retreading Material <strong>to</strong> Any STU YES / NO<br />

Downloaded from<br />

www.upsrtc.<strong>com</strong><br />

<strong>for</strong> 3 years<br />

Firm should give their consent by ticking YES in all the condition (except condition 14)<br />

only then they shall qualify technically. In<strong>for</strong>ma<strong>to</strong>n asked <strong>for</strong> Sr. No. 14 has <strong>to</strong> be submitted by<br />

attaching self attested copies <strong>of</strong> each as pro<strong>of</strong>, then only the Firm shall qualify technically.<br />

Contd…11

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!