Air Traffic Management Concept Baseline Definition - The Boeing ...
Air Traffic Management Concept Baseline Definition - The Boeing ...
Air Traffic Management Concept Baseline Definition - The Boeing ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
5.2.2 Ground/Ground Communication<br />
In addition to the air/ground communication described above, communication among<br />
ATC facilities and between ATC and AOC facilities is important to CNS/ATM. Much of<br />
the communication internal to the NAS is conducted on FAA-specified systems that do<br />
not necessarily conform to international standards. Communication between the NAS and<br />
the ATC systems of other countries either conform to ICAO and other international<br />
standards or is based on a bilateral agreement between the U.S. and a specific adjacent<br />
country. Figure 5.6 illustrates the general overview of ground/ground voice and data<br />
communication.<br />
AIDC<br />
ATSMHS<br />
AFTN<br />
Telephone<br />
AIDC = ATS<br />
Interfacility Data<br />
Communication<br />
AFTN = Aeronautical<br />
Fixed Telecommunication<br />
Network<br />
ATN<br />
ATSMHS = ATS<br />
Message Handling<br />
Services<br />
NADIN II<br />
NADIN = National<br />
<strong>Air</strong>space Data<br />
Interchange Network<br />
PTN = Public<br />
Telephone Network<br />
PTN<br />
FAA Lines<br />
Figure 5.6 Interfacility Communication<br />
5.2.2.1 Voice<br />
<strong>The</strong> primary communication between ATC facilities and between AOC and ATC is via<br />
telephone. Voice switching centers at ATC facilities provide automated dialing and<br />
connection through either dedicated FAA circuits or through the public telephone<br />
network.<br />
5.2.2.2 Current Data<br />
Data is communicated among centers, TRACON’s, towers, and Flight Service Stations<br />
over a dedicated packet switched network called National <strong>Air</strong>space Data Interchange<br />
Network (NADIN). Data include flight plans and transfer-of-control information between<br />
host computers.<br />
74