02.01.2015 Views

Air Traffic Management Concept Baseline Definition - The Boeing ...

Air Traffic Management Concept Baseline Definition - The Boeing ...

Air Traffic Management Concept Baseline Definition - The Boeing ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Arrivals/<br />

Departures<br />

Overview<br />

Separation<br />

assurance<br />

Data processing<br />

Table C-1<br />

Comparison of FAA 2005 and Users’ 2005 Operational <strong>Concept</strong>s<br />

FAA 2005 User 2005<br />

Decision support systems assist service provider to assign runways and<br />

merge/sequence traffic, based on accurate traffic projections and user<br />

preferences.<br />

Tools such as FMS, datalink, and satellite navigation allow route<br />

flexibility by reducing voice communications and increasing<br />

navigational precision.<br />

Avionics fits allow an increasingly frequent transfer of responsibility<br />

for separation assurance to the flight deck for some types of operations.<br />

Pre-defined data link messages, such as altitude clearances and<br />

frequency changes, are uplinked to an increasing number of equipped<br />

aircraft. Voice communications between service providers and pilots<br />

are thereby reduced, giving the service provider additional time for<br />

planning functions that help accommodate increased traffic demand.<br />

Enhanced ground-to-ground communications systems (both digital and<br />

voice) that allow seamless coordination within and between facilities.<br />

Disruption in departure and arrival traffic is minimized by improved<br />

weather data and displays. <strong>The</strong>se displays enhance safety and efficiency<br />

by disclosing weather severity and location<br />

Decision support systems help service providers to maintain situation<br />

awareness, identify and resolve conflicts, and sequence and space<br />

arrival traffic.<br />

Separation assurance changes in the following areas: aircraft-to-aircraft<br />

separation, aircraft-to-airspace and aircraft-to-terrain/obstruction<br />

separation, and departure and arrival planning services<br />

<strong>Air</strong>craft-to-aircraft separation remains the responsibility of service<br />

providers<br />

All-weather pilot-pilot separation when deemed appropriate<br />

Expanded data acquisition results from inputs by the flight deck, airline<br />

operations center, service provider, and interfacing NAS systems<br />

Accurate information on SUA status and planned usage is disseminated<br />

automatically to the NAS-wide information system. Eliminating<br />

numerous coordination calls normally required between facilities<br />

Increased pilot situational awareness (ADS/CDTI)better weather and<br />

navigation increases safety and efficiency of approaches/departures and leads<br />

to better runway utilistation.<br />

RNAV capabilities support user preferred arrival/departure routed,<br />

climb/decent profiler, runway assignment.<br />

CFIT more readily avoided using GPS nav and improved terrain database.<br />

Reduced visual minima using specific points to allow easy visual acquisition<br />

of traffic.<br />

ABS-B/CDTI enable visual approaches where momentary loss of visual target<br />

acquisition occurs.<br />

ATIS info available via datalink.<br />

Dat aavailable on surrounding traffic and w/x displayed on CDTI<br />

166

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!