RVSM RWP SATCOM SELCAL SIDS SSR STARS STARS SUA TACAN TCAS TDWR TIS TMA TMU TRACON TWDL TWEB VDR VHF VMC VOR WAAS WARP WPDN Reduced Vertical Separation Minima Radar Wind Profilers Satellite Communications Selective Calling Standard Instrument Departures Secondary Surveillance Radar Standard Approach Procedures Standard Terminal Replacement System Special Use Airspace Tactical Air Navigation Traffic Alert and Collision Avoidance System Terminal Doppler Weather Radar Traffic Information Services Terminal Maneuvering Area Traffic Management Unit Terminal Radar Approach Control Two-Way Data Link Transcribed Weather Broadcast VHF Data Radio Very High Frequency Visual Meteorological Conditions Very High Frequency Omnidirectional Range Wide Area Augmentation System Weather and Radar Processor Wind Profiler Demonstration Network xii

1 Introduction This report presents an operational concept for the U.S. National Airspace System (NAS) through the year 2015, including a transition path from the current system. This concept was developed by Boeing Commercial Airplane Group for NASA’s Advanced Air Transportation Technologies (AATT) program, under subcontract with NEXTOR (National Center of Excellence for Aviation Operations Research). The contract was awarded as part of Milestone 1.0.0 of the AATT program, which will provide a baseline air traffic management (ATM) operational concept to guide the program’s research efforts. The Boeing team worked actively with NASA experts, the Federal Aviation Administration (FAA) Air Traffic Operational Concept Development Team and NEXTOR faculty members from MIT and UC Berkeley during the six month contract period. 1.1 Objectives The primary objective of this work was to define and document the probable evolution of the NAS through the year 2015, based on current FAA and industry activity and the ATM system mission. This evolution path, stated in the form of an operational concept, was to provide part of a road map to guide AATT program research. In order to achieve this objective, the team undertook the following tasks: • Collect and document NAS stakeholder needs and expectations for the system in terms of safety, capacity and efficiency. • Identify the primary driving forces affecting the NAS modernization, along with the most important constraints placed upon the system. • Establish a probable baseline operational concept for 2015 and at least one feasible transition path to that future concept. • Provide insight for AATT planning that will allow the program to achieve a certain level of robustness with respect to NAS modernization uncertainty. The last task, that of providing insight into NAS modernization uncertainty, is perhaps the most important one currently, due to the lack of the industry’s clear vision of the desired end state and transition path. The following are the major factors contributing to the uncertainty: • Political climate • System size and complexity • Diversity of users • Safety criticality • Human operators in demanding roles • Reliance on rapidly developing tehnology 1

1 Introduction<br />

This report presents an operational concept for the U.S. National <strong>Air</strong>space System (NAS)<br />

through the year 2015, including a transition path from the current system. This concept<br />

was developed by <strong>Boeing</strong> Commercial <strong>Air</strong>plane Group for NASA’s Advanced <strong>Air</strong><br />

Transportation Technologies (AATT) program, under subcontract with NEXTOR<br />

(National Center of Excellence for Aviation Operations Research). <strong>The</strong> contract was<br />

awarded as part of Milestone 1.0.0 of the AATT program, which will provide a baseline<br />

air traffic management (ATM) operational concept to guide the program’s research<br />

efforts.<br />

<strong>The</strong> <strong>Boeing</strong> team worked actively with NASA experts, the Federal Aviation<br />

Administration (FAA) <strong>Air</strong> <strong>Traffic</strong> Operational <strong>Concept</strong> Development Team and NEXTOR<br />

faculty members from MIT and UC Berkeley during the six month contract period.<br />

1.1 Objectives<br />

<strong>The</strong> primary objective of this work was to define and document the probable evolution of<br />

the NAS through the year 2015, based on current FAA and industry activity and the ATM<br />

system mission. This evolution path, stated in the form of an operational concept, was to<br />

provide part of a road map to guide AATT program research.<br />

In order to achieve this objective, the team undertook the following tasks:<br />

• Collect and document NAS stakeholder needs and expectations for the system in terms<br />

of safety, capacity and efficiency.<br />

• Identify the primary driving forces affecting the NAS modernization, along with the<br />

most important constraints placed upon the system.<br />

• Establish a probable baseline operational concept for 2015 and at least one feasible<br />

transition path to that future concept.<br />

• Provide insight for AATT planning that will allow the program to achieve a certain<br />

level of robustness with respect to NAS modernization uncertainty.<br />

<strong>The</strong> last task, that of providing insight into NAS modernization uncertainty, is perhaps the<br />

most important one currently, due to the lack of the industry’s clear vision of the desired<br />

end state and transition path. <strong>The</strong> following are the major factors contributing to the<br />

uncertainty:<br />

• Political climate<br />

• System size and complexity<br />

• Diversity of users<br />

• Safety criticality<br />

• Human operators in demanding roles<br />

• Reliance on rapidly developing tehnology<br />